Flood, Drainage and SuDS articles – page 8

290 articles
Flood, Drainage and SuDS7 min read

Sustainable drainage on a steeply sloping site

On a steep site drainage is about slowing water down. Here is how velocity, terraced storage, infiltration risk and exceedance routing come together.

Read article →
Flood, Drainage and SuDS7 min read

Drainage strategy for a single infill plot

On one plot the drainage evidence is a short note, a percolation test and a levels plan. Here is what to include, in the order a case officer reads it.

Read article →
Flood, Drainage and SuDS7 min read

Flood risk vulnerability classification of uses

Vulnerability classification decides whether the exception test applies. Get it wrong and the whole flood risk case is built on the wrong test.

Read article →
Flood, Drainage and SuDS7 min read

Drainage for a change of use with no new hard surface

A change of use with no external works cannot increase surface water run-off. Officers still ask for a drainage strategy, so answer the question they should have asked about foul flows.

Read article →
Flood, Drainage and SuDS7 min read

Discharge to a highway drain: the authority's position

A road gully looks like the easy answer for surface water. The highway authority owns that pipe for the road, not for your plot, and consent is discretionary.

Read article →
Flood, Drainage and SuDS6 min read

Detention basins against permanently wet ponds

Only the volume above top water level counts in a wet pond, which is where most submitted strategies go wrong. This compares basins and ponds on attenuation, treatment, safety, land take and maintenance.

Read article →
Flood, Drainage and SuDS7 min read

Swale conveyance capacity against what is drawn

A swale on a layout and a swale that carries the design flow are often different things. This covers the gradient and roughness assumptions, an illustrative capacity calculation, and the checks a reviewer should make.

Read article →
Flood, Drainage and SuDS6 min read

Geocellular storage tanks: design life and adoption

Geocellular tanks find attenuation volume where nothing else fits, but nobody adopts them. This covers the design life argument, the silt regime, the uplift check and how to present the system so a condition is discharged.

Read article →
Flood, Drainage and SuDS6 min read

Blue roofs as attenuation and the maintenance case

Blue roofs buy attenuation volume where there is no room for a tank. The hydraulics are the easy part. Winning the argument means showing the blocked-outlet case, the drawdown time and who maintains the flow control.

Read article →
Flood, Drainage and SuDS6 min read

Tidal and fluvial flood risk together: joint probability

On a tidal river the peak flow and the peak sea level rarely coincide, so design levels come from joint probability rather than from stacked worst cases. This sets out the method and the checks a reviewer should make.

Read article →
Flood, Drainage and SuDS7 min read

Flood defences and the residual breach scenario

Flood zones ignore defences, so a defended site is judged on what happens when the defence fails. This covers breach modelling, hazard rating and the design response.

Read article →
Flood, Drainage and SuDS7 min read

Modelling a small watercourse with no published model

On an unmodelled ordinary watercourse the answer is to estimate flows, check what the channel carries, and model only as much as the decision needs.

Read article →
Flood, Drainage and SuDS6 min read

Half drain time and consecutive storm testing

Peak storage volume tells you nothing about the second storm. Half drain time and consecutive event testing are where attenuation designs are found out.

Read article →
Flood, Drainage and SuDS6 min read

Finished floor levels: setting and justifying them

A finished floor level has to clear the design flood level plus freeboard and still allow a step-free approach. Resolving that conflict is a design job, not a calculation.

Read article →
Flood, Drainage and SuDS7 min read

Climate change allowances: choosing epoch and percentile

The epoch and allowance category in a flood risk assessment both follow from the lifetime of the development. Here is how to fix that lifetime and apply the Environment Agency figures without tripping a consultee objection.

Read article →
Flood, Drainage and SuDS7 min read

Permeable paving: where it works and where it fails

It appears on drawings as a hatch with a storage volume claimed and no section to support it. The design decision is which of the three construction types you are using.

Read article →
Flood, Drainage and SuDS7 min read

Sewer connection rights and capacity refusals

An undertaker cannot refuse a connection simply because its network is busy. It can refuse on two statutory grounds, and it can tell the council to phase your occupation until improvements land.

Read article →
Flood, Drainage and SuDS7 min read

Sequential test for a windfall housing site

A windfall site is unallocated, so nobody applied the sequential test for you at plan-making. This is how to define the area of search and evidence the alternatives an officer will accept.

Read article →
Flood, Drainage and SuDS7 min read

SuDS treatment trains for a car park

Attenuation and water quality are separate questions. How to build a treatment train from permeable paving, bioretention and swales, and where a separator actually belongs.

Read article →
Flood, Drainage and SuDS6 min read

Attenuation storage sizing and the assumptions that move it

Two engineers can size the same site and differ by half, because the assumptions do the work. Design events, allowances, long term storage and the inputs a drainage reviewer tests first.

Read article →
Flood, Drainage and SuDS8 min read

Exceedance routing: designing for the storm beyond design

Attenuation sizing does not tell you what happens when the system surcharges. Exceedance routing is a separate drawing, and its absence is a common drainage objection.

Read article →
Flood, Drainage and SuDS7 min read

Infiltration testing that fails: what to do next

A failed soakaway test changes the drainage strategy and often the layout. How to work out why it failed, whether to retest, and how to justify the next option down the hierarchy.

Read article →
Flood, Drainage and SuDS7 min read

Setting a discharge rate with no greenfield record

A brownfield site has no greenfield record and often no documented existing rate. Here is how to derive both, and how to get a limiting rate agreed before design freeze.

Read article →
Flood, Drainage and SuDS7 min read

Residual flood risk and property flood resilience measures

Residual risk is what is left after the design has done its work. Here is how to describe it in a flood risk assessment, and where resilience measures stop being enough.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope