Noise, Air, Odour and Light articles – page 4

263 articles
Noise, Air, Odour and Light7 min read

Sky glow, light trespass and glare as separate metrics

Upward light ratio, vertical illuminance, luminous intensity and building luminance each have their own unit, limit and fix. One number is not an assessment.

Read article →
Noise, Air, Odour and Light7 min read

Emissions standards for biomass and combined heat and power

Combustion plant is assessed twice: once for carbon and once for what leaves the flue. Biomass and gas engines often pass the first test and fail the second.

Read article →
Noise, Air, Odour and Light7 min read

The damage cost approach to air quality contributions

Air quality contributions are usually calculated from predicted emissions times a published cost per tonne. The errors sit in the assumptions, not the arithmetic.

Read article →
Noise, Air, Odour and Light6 min read

What an Air Quality Management Area adds to an application

An Air Quality Management Area creates no new consent. It changes which local plan policy applies, lowers the assessment threshold and puts occupier exposure in play.

Read article →
Noise, Air, Odour and Light7 min read

Duct termination height for a takeaway extraction system

Officers condition the discharge point more than the filter. This covers termination a metre above the ridge, separation from windows and intakes, routing through third party property and maintenance access.

Read article →
Noise, Air, Odour and Light6 min read

Section 61 prior consent for construction works

A section 61 consent lets a contractor agree methods, hours and noise limits before work starts, instead of waiting for a section 60 notice. Here is what to submit and how it interacts with planning conditions.

Read article →
Noise, Air, Odour and Light6 min read

Character corrections and the acoustic feature penalty

The acoustic feature correction is the most contested judgement in a plant noise assessment. This sets out the tonality, impulsivity and intermittency corrections, the 9 dB ceiling and how to design the penalty out.

Read article →
Noise, Air, Odour and Light7 min read

Strategic noise mapping for early site appraisal

Strategic noise mapping tells you whether noise will shape a scheme. It cannot tell you a facade level, and it omits most of the sources that generate objections.

Read article →
Noise, Air, Odour and Light7 min read

Trees and green infrastructure as air quality mitigation

Trees deposit pollutants and also change how a street ventilates. In a canyon the second effect dominates, which is why planting belongs in an assessment as a co-benefit.

Read article →
Noise, Air, Odour and Light6 min read

Diffusion tubes against continuous analysers

Diffusion tubes give an adjusted monthly mean for nitrogen dioxide. Analysers give hourly reference data. The question is whether tubes are adequate for the assessment you have to write.

Read article →
Noise, Air, Odour and Light6 min read

Sky glow, dark skies and upward light ratio

Upward light ratio only counts the light a fitting throws above the horizontal. In a dark rural setting, the light bouncing off a wet yard can do as much to the sky as the fitting ever did.

Read article →
Noise, Air, Odour and Light6 min read

Bioaerosols and separation distance from composting

The standoff figure quoted at every composting inquiry is a screening trigger, not a standard. Knowing what it triggers, and what it does not, is the difference between a usable assessment and a stalled application.

Read article →
Noise, Air, Odour and Light6 min read

Odour from waste transfer and composting facilities

Two regimes look at the same smell. Knowing which one controls what stops a planning application collapsing into an argument the environmental permit was going to settle anyway.

Read article →
Noise, Air, Odour and Light7 min read

External amenity noise criteria for gardens and balconies

The external amenity criterion is a guideline range, not a standard, and it was never written for a sixth-floor balcony on a main road. Knowing that is the difference between a workable case and a refusal.

Read article →
Noise, Air, Odour and Light7 min read

Refuse collection and delivery noise at unsocial hours

Reversing alarms, tail lifts, shutters and cages over block paving are the noise. Designing those out is what supports an earlier delivery hour than the standard condition.

Read article →
Noise, Air, Odour and Light7 min read

Music noise level conditions and how they work

A music noise condition needs a descriptor, a reference level, a position and a method. Inaudibility conditions fail all four tests and leave an operator permanently exposed.

Read article →
Noise, Air, Odour and Light7 min read

Choosing survey dates that produce valid data

A baseline measured in the wrong week describes a place that does not exist. Choosing survey dates, recording weather and knowing when the data has to be thrown away.

Read article →
Noise, Air, Odour and Light7 min read

Noise measurement uncertainty and how to report it

Saying the instrument was calibrated is not an uncertainty statement. Here is how to combine the contributors, report a range, and decide when the uncertainty changes the conclusion.

Read article →
Noise, Air, Odour and Light7 min read

Tonality: the reference method and the penalty applied

A tonality correction of 2 to 6 dB often decides whether plant noise reads as an adverse impact. Here is the one third octave reference method, the subjective scale and how to reconcile the two.

Read article →
Noise, Air, Odour and Light7 min read

Noise conditions: workable limits and verification

Most noise conditions cannot be measured, which makes them unenforceable. Here is the wording that works, and the verification structure that turns a paper limit into a real one.

Read article →
Noise, Air, Odour and Light7 min read

Biomass and CHP flue height: dispersion and design

Calculate the flue before you draw it. Here is how dispersion, building wake and the Clean Air Act 1993 thresholds set chimney height for biomass and combined heat and power plant.

Read article →
Noise, Air, Odour and Light7 min read

When an air quality assessment is triggered

No floorspace figure triggers an air quality assessment. Traffic change, combustion plant, new receptors in poor air quality and construction dust do. Here is how to screen a scheme before commissioning modelling.

Read article →
Noise, Air, Odour and Light8 min read

Assessing an existing factory against proposed homes

Survey a factory for a week and you measure a quiet fortnight. The assessment has to be built on what the operator may lawfully do, not what it happens to be doing now.

Read article →
Noise, Air, Odour and Light8 min read

Road traffic noise and when a barrier is justified

A barrier only works where it breaks the line of sight, which rules out most upper-floor bedrooms. Layout, orientation and envelope design usually do more than any fence.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope