Noise, Air, Odour and Light articles – page 7

263 articles
Noise, Air, Odour and Light7 min read

Railway noise and vibration for sites beside a line

Beside an operational railway, groundborne vibration often drives the design more than sound levels do. The two effects need separate measurement, separate criteria and separate mitigation.

Read article →
Noise, Air, Odour and Light6 min read

Road traffic noise assessment for a new housing site

Layout does more for road traffic noise than glazing ever will. Establishing the traffic case, calculating facade levels and presenting results an officer can check.

Read article →
Noise, Air, Odour and Light6 min read

Planning control and licensing control of venue noise

A premises licence until 1am does not override a planning condition closing you at 11pm. How the two noise regimes differ, and how to align them with evidence.

Read article →
Noise, Air, Odour and Light7 min read

Designing dark corridors for bats around a development

Bat commuting routes need continuous darkness, not a lower average lux. How to set the corridor, choose and aim luminaires, and prove the result on an isolux plot.

Read article →
Noise, Air, Odour and Light6 min read

Curfew hours and part night lighting conditions

Obtrusive light guidance sets tighter limits after a curfew hour, which is why conditions use them. Here is how to specify the hours, the controls and the verification that makes a condition work.

Read article →
Noise, Air, Odour and Light6 min read

Extract termination height and odour control selection

Most kitchen extraction refusals come down to a flue that stops below the ridge or abatement that does not match the cooking. Here is how to specify both and what evidence a council expects.

Read article →
Noise, Air, Odour and Light6 min read

Odour assessment and the FIDOL factors

Odour in planning is judged on five characteristics rather than on strength alone. Here is what each of the FIDOL factors means, how field assessment and modelling are used, and what a workable condition looks like.

Read article →
Noise, Air, Odour and Light7 min read

Nitrogen dioxide diffusion tube surveys for planning

The annual mean objective for nitrogen dioxide is 40 micrograms per cubic metre, and a six week survey cannot be compared with it. Duration, bias adjustment and honest uncertainty decide whether the data is usable.

Read article →
Noise, Air, Odour and Light7 min read

Plant noise from commercial kitchens: assessment and fixes

Kitchen plant noise is assessed under BS 4142 by comparing the rating level with measured background. Character corrections for tonality and cycling often decide the case.

Read article →
Noise, Air, Odour and Light7 min read

Scoping noise, air and odour work at pre-application

Environmental health is an internal consultee with outsized influence on noise, air and odour cases. A written pre-application scope tells you what to commission and what to leave out.

Read article →
Noise, Air, Odour and Light7 min read

Light spill onto neighbouring windows from a car park

Spill onto a window is vertical illuminance in lux, tested against zone limits that tighten after curfew. Here is how to design and condition for the tighter case.

Read article →
Noise, Air, Odour and Light7 min read

Air quality and odour evidence for a crematorium

Cremators are a permitted process; planning controls the stack, the plant footprint and the dispersion outcome. Here is how to evidence the planning half properly.

Read article →
Noise, Air, Odour and Light7 min read

Assessing odour from agricultural buildings near homes

Livestock odour applications fail on the source nobody mitigated. Here is how to identify every source, choose the right level of assessment and mitigate credibly.

Read article →
Noise, Air, Odour and Light7 min read

Cumulative assessment where several plant items are proposed

Assess plant item by item and the total is understated. Here is how to combine sound power levels, choose the worst case period and specify attenuation that works.

Read article →
Noise, Air, Odour and Light7 min read

Noise limits in section 106 and planning conditions

An enforceable noise condition states a limit, a position, a period and a method. Here is how to draft one, how to verify it and how a limit gets varied later.

Read article →
Noise, Air, Odour and Light7 min read

Acoustic design statements and what they add

Numbers show whether internal levels are met. A design statement shows whether they were met by designing properly or by sealing the windows, which is what an officer wants to know.

Read article →
Noise, Air, Odour and Light7 min read

Responding to an environmental health holding objection

Environmental health objections are cleared by diagnosis before drafting. Missing data needs data, a method dispute needs justification, and an objection in principle needs a planning answer.

Read article →
Noise, Air, Odour and Light7 min read

Air quality assessment for a car park or servicing yard

Parking and servicing areas are assessed at a local scale: cold start emissions, idling at barriers and where the ventilation discharge goes relative to the nearest window.

Read article →
Noise, Air, Odour and Light6 min read

Odour and noise conditions for a micro-brewery

Boil odour, glycol chillers and the taproom nobody declared are what sink small brewery applications. How to handle each separately and avoid a condition that caps your output.

Read article →
Noise, Air, Odour and Light6 min read

Railway vibration and residential layout decisions

Ground-borne vibration and re-radiated noise from a railway are unaffected by facade insulation. How to measure the baseline before the masterplan, and why distance beats isolation bearings every time.

Read article →
Noise, Air, Odour and Light6 min read

Entertainment noise and sound limiters as a condition

A sound limiter set on a poorly insulated building just makes the venue unviable. How amplified music is assessed in the low frequency bands, how a limiter is set, and what the three standard conditions do.

Read article →
Noise, Air, Odour and Light6 min read

Noise from outdoor seating and beer gardens

Patron noise sits outside the standard most acousticians use, so an external seating case is won on context, hours, layout and a management plan an officer can check. Here is how to build one.

Read article →
Noise, Air, Odour and Light7 min read

Dust assessment for demolition and earthworks

Construction dust is assessed by risk category, not by modelled concentration. The value of the work is the mitigation schedule it produces, activity by activity.

Read article →
Noise, Air, Odour and Light7 min read

Odour risk assessment for a waste or composting facility

Planning decides whether the location is right; the permit decides how emissions are controlled. Screen on separation distance, characterise sources honestly, then model only if the answer is still unclear.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope