Noise, Air, Odour and Light articles – page 9

263 articles
Noise, Air, Odour and Light7 min read

Luminance limits for illuminated signs and displays

Advertisement consent is decided on amenity and public safety alone, and brightness sits inside both. Here is how luminance limits, environmental zones and digital display conditions work.

Read article →
Noise, Air, Odour and Light6 min read

Light spill onto bat commuting and foraging routes

Lighting near bat roosts and commuting routes sits inside protected species law, not amenity policy. Here is how the constraint is set and how a lighting design meets it.

Read article →
Noise, Air, Odour and Light6 min read

When dynamic olfactometry is needed for an odour case

Olfactometry produces the only measured odour concentration, but it is rarely proportionate. Here is what the method involves and which planning cases actually need it.

Read article →
Noise, Air, Odour and Light6 min read

Separation distances for waste and composting odour

A separation distance tells you which assessment a waste or composting proposal needs, not whether it will be permitted. Here is how odour and bioaerosol evidence is actually built.

Read article →
Noise, Air, Odour and Light6 min read

Air quality neutral and air quality positive requirements

Air quality neutral is a benchmark comparison, not a modelling exercise. Two benchmarks, two sources of emissions, and a design response that is mostly decided by the heating strategy.

Read article →
Noise, Air, Odour and Light6 min read

SOAEL and LOAEL: using the noise effect levels properly

The effect level hierarchy comes from the Noise Policy Statement for England and deliberately carries no national figures. That is a feature, and most submissions handle it badly.

Read article →
Noise, Air, Odour and Light6 min read

Glint and glare assessment near an aerodrome

Glint and glare modelling predicts where reflections from panels or glazing will fall across the year, and pilots and controllers are the receptors that decide it.

Read article →
Noise, Air, Odour and Light6 min read

Ammonia deposition from livestock near designated sites

Ammonia travels further than odour and is assessed against habitat thresholds rather than human receptors, so a unit can be screened in by a site 10 kilometres away.

Read article →
Noise, Air, Odour and Light7 min read

Odour from a poultry unit: modelling and distance

England sets no statutory separation distance for intensive livestock. What decides a poultry odour case: ventilation discharge, muck storage and the cleanout peak.

Read article →
Noise, Air, Odour and Light7 min read

What an acoustic barrier actually achieves

Acoustic fences deliver far less than clients expect. Path difference, surface density, gaps and position explain why, and what to do for upper floor windows.

Read article →
Noise, Air, Odour and Light7 min read

Night deliveries and servicing noise at commercial sites

Delivery noise wakes neighbours even when the measured average looks fine. Event based assessment, yard layout, reversing alarms and workable hours conditions.

Read article →
Noise, Air, Odour and Light6 min read

Statutory nuisance after planning permission is granted

Complying with your planning conditions does not answer an abatement notice. The two regimes, the appeal deadline and the records that support a defence.

Read article →
Noise, Air, Odour and Light7 min read

Wind turbine noise and the ETSU-R-97 condition

Wind turbine noise limits vary with wind speed rather than sitting at a fixed level. How the limits are derived, what the amplitude modulation condition does and where the method is challenged.

Read article →
Noise, Air, Odour and Light6 min read

Designing a dark corridor for bats across a site

Bat corridors fail on lighting spill, not on lighting standards. How the ecologist sets the target illuminance and how the lighting design is tested against it.

Read article →
Noise, Air, Odour and Light7 min read

Sky glow, light trespass and luminaire intensity limits

Upward light ratio, vertical illuminance at windows, luminous intensity towards an observer and surface luminance are separate controls. An assessment reporting one lux figure fails three of them.

Read article →
Noise, Air, Odour and Light7 min read

Choosing the right ILP environmental zone for a site

Zone selection decides every numeric limit in a lighting assessment. The E1 to E2 boundary, over-classification in towns, and how to handle a site that straddles two zones.

Read article →
Noise, Air, Odour and Light7 min read

Biomass boilers, emissions limits and smoke control areas

A biomass installation raises two separate approvals: the planning position on the flue, and Clean Air Act 1993 controls on smoke, chimney height and emissions. They run on different timetables.

Read article →
Noise, Air, Odour and Light6 min read

Nitrogen dioxide modelling and model verification

An unverified road model tells you what the equations produce, not what the street does. Verification is where every competent reviewer starts.

Read article →
Noise, Air, Odour and Light6 min read

Construction dust risk assessment to the IAQM method

A site can be high risk for trackout and low risk for construction. Scoring the four activities separately is what the method is for.

Read article →
Noise, Air, Odour and Light6 min read

What an Air Quality Management Area declaration means

An AQMA says a national objective is unlikely to be met somewhere inside a boundary. It changes the evidence expected, not whether development can happen.

Read article →
Noise, Air, Odour and Light6 min read

Odour and separation distance for anaerobic digestion

Digestion happens in a sealed vessel. The odour comes from reception, clamps and digestate storage, and modelling rather than distance decides the case.

Read article →
Noise, Air, Odour and Light7 min read

Odour control for a hot food takeaway extraction system

Hot food takeaways are refused on the flue far more often than on the use. Odour risk scoring, abatement stages and termination height decide the outcome.

Read article →
Noise, Air, Odour and Light6 min read

Vibration from construction and BS 6472 response levels

Vibration people find intolerable is roughly an order of magnitude below the level that damages a house. Almost every complaint is about annoyance and almost every claim is about damage.

Read article →
Noise, Air, Odour and Light6 min read

Construction noise, BS 5228 and section 61 consent

A section 61 prior consent fixes the noise terms for construction works before they start. Without one, the council sets those terms reactively, after the first complaint.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope