Professionals and Qualifications articles – page 10

372 articles
Professionals and Qualifications6 min read

Briefing a specialist when the site data is incomplete

Gaps in site data are normal on a small scheme. What matters is whether they are recorded as gaps or filled with something plausible that has to be corrected later.

Read article →
Professionals and Qualifications6 min read

Competence expectations under the building safety regime

Planning Gateway One puts a named author on the fire statement, and the Building Regulations put competence duties on clients, designers and contractors. Here is what that means for a planning submission.

Read article →
Professionals and Qualifications7 min read

One multidisciplinary practice or separate specialists

The appointment structure decides who carries coordination risk on your planning submission, and coordination risk is what turns a straightforward application into a delay.

Read article →
Professionals and Qualifications7 min read

Comparing fee quotes for the same specialist report

The difference between specialist fee quotes is rarely the day rate. It is the scope, the exclusions, the revision allowance and the survey window hidden in the programme.

Read article →
Professionals and Qualifications8 min read

Sub-consultants and who carries the liability

One contract, four sets of obligations. How sub-consulting is structured, who you can actually claim against, and the appointment terms that decide it.

Read article →
Professionals and Qualifications6 min read

Structural engineers and when a planning case needs one

A structural appraisal earns its fee when the case turns on whether a building can be kept. Here is what it must contain, who should write it, and when you do not need one.

Read article →
Professionals and Qualifications6 min read

Verifying a claimed accreditation or registration

Most professional registers relevant to planning are free and public. Here is what each one certifies, how membership grades differ, and what to do when a claim does not check out.

Read article →
Professionals and Qualifications7 min read

Appointing a specialist late in the programme

When a season-dependent survey is commissioned too late, the question is what can be deferred to a condition and what cannot. Protected species is the hard line.

Read article →
Professionals and Qualifications7 min read

Splitting scope between an architect and a planning agent

On a small residential application the designer and the planning agent do different jobs, and the gaps between them cost money. Here is how to divide the deliverables and decide who is named as agent.

Read article →
Professionals and Qualifications6 min read

Reviewing a consultant's draft before it is submitted

Specialist drafts arrive with recycled site descriptions, superseded policy references and untraceable figures. This is a practical method for reviewing one before it reaches the council.

Read article →
Professionals and Qualifications6 min read

Writing a scope of works for a specialist report

Most disputes with specialist consultants trace back to a vague instruction. This sets out what a written scope of works should contain, from the standard named to the number of revisions included.

Read article →
Professionals and Qualifications6 min read

Who can design and certify SuDS on a small site

Sustainable drainage design is not a licensed activity, which leaves self-builders guessing who is qualified. This sets out the competence councils look for, the role of the lead local flood authority, and who maintains the system afterwards.

Read article →
Professionals and Qualifications6 min read

Choosing a daylight and sunlight consultant

Two competent practitioners should agree on a daylight result. When they do not, the cause is almost always inputs. What to ask before you appoint.

Read article →
Professionals and Qualifications6 min read

Who prepares a viability assessment, and independence

A viability assessment is only as strong as the valuer behind it. What the RICS professional statement requires, and how the council's reviewer will test your inputs.

Read article →
Professionals and Qualifications6 min read

Choosing a transport planner for a highway case

The highway officer reads a handful of things closely: trip rates, visibility, collision data and the access drawing. Appoint someone who can defend all four.

Read article →
Professionals and Qualifications6 min read

Who can prepare an Environmental Statement

The 2017 Regulations put competence on the applicant. You must use competent experts and you must say who they are and what qualifies them.

Read article →
Professionals and Qualifications6 min read

Historic building recording levels and who does them

A recording condition names a level from 1 to 4. Here is what each level requires, who sets it, when it can be negotiated and how the archive gets deposited.

Read article →
Professionals and Qualifications7 min read

Choosing an arboriculturist for a BS 5837 tree survey

A BS 5837 survey is about whether your scheme can be built without damaging retained roots. Here is how to choose the consultant and check what they produce.

Read article →
Professionals and Qualifications6 min read

Fire engineering competence and who signs a strategy

The planning stage fire statement and the engineering fire safety strategy are different documents with different authors. Here is how to check competence and brief the work.

Read article →
Professionals and Qualifications7 min read

Checking an ecologist's membership and competence

An ecology report is only as good as its author's competence for that survey type. Membership grade, licences and habitat experience are all checkable before appointment.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and the methods used

An odour assessment for planning can be a structured qualitative appraisal or a modelled study. The method should follow the risk, and the author's competence should follow the method.

Read article →
Professionals and Qualifications6 min read

Daylight assessors and the case for independent review

Daylight results depend on the model behind them. Because no accreditation scheme governs the work, authorities increasingly commission independent verification on major schemes.

Read article →
Professionals and Qualifications6 min read

Archaeological work and registered organisation status

The curatorial archaeologist sets the brief and approves the method. Knowing how that works, and which questions to ask a contractor, keeps the condition dischargeable.

Read article →
Professionals and Qualifications6 min read

When to commission an independent peer review

Peer review earns its fee on viability, contested technical evidence and appeals. Scope it around decisions, screen the reviewer for conflicts, and decide in advance what you will do with the findings.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope