Professionals and Qualifications articles – page 5

372 articles
Professionals and Qualifications7 min read

Acting as an expert witness at a planning appeal

An expert witness owes a duty to the inquiry before the client. Here is what that means for a proof of evidence, cross-examination and costs exposure.

Read article →
Professionals and Qualifications7 min read

What a professional reviewer takes responsibility for

Signing another party's draft means taking responsibility for the judgements in it, within a defined scope. Here is how to set that scope and when to decline.

Read article →
Professionals and Qualifications6 min read

Who signs the ownership certificates on an application

The applicant or their agent signs the ownership certificate, and the signature is a statement of fact. Here is what it warrants, who counts as an owner, and what to do when it is wrong.

Read article →
Professionals and Qualifications6 min read

Independent audit of a basement impact assessment

Where a council has an adopted basement policy, it appoints an independent auditor to review your assessment and recharges the fee. Here is what the auditor checks and how to get through it in one round.

Read article →
Professionals and Qualifications7 min read

What suitably qualified means for an air quality assessment

Credentials are not the test environmental health officers apply first. Verification against local monitoring data is, and an unverified model gets the report returned.

Read article →
Professionals and Qualifications7 min read

Daylight and sunlight assessment: who is competent to do it

BRE 209 accredits nobody, so judging competence falls to whoever appoints. What separates modelling skill from interpretation, and the questions to ask first.

Read article →
Professionals and Qualifications7 min read

Heritage consultant competence and the significance test

No rule says who may write a heritage statement. Advice Note 12 says what one should contain, and the gap between the two is where most assessments fail.

Read article →
Professionals and Qualifications7 min read

Appointing a party wall surveyor: what the Act requires

An appointment under section 10 must be in writing and cannot be rescinded, and the surveyor's duty is to the Act rather than to the owner paying the fee.

Read article →
Professionals and Qualifications7 min read

Who should write a transport assessment or statement

Competence for transport evidence is judged by the highway authority, not by a register. The scoping agreement tells you which skills the job actually needs.

Read article →
Professionals and Qualifications7 min read

Arboricultural credentials and what each one covers

No statute says who may write a BS 5837 survey. Here is what each arboricultural qualification and registration scheme covers, and the checks to run before you submit the report.

Read article →
Professionals and Qualifications6 min read

What chartered town planner status means for your application

Anyone may call themselves a planning consultant in England. Here is what chartered membership of the planning institute actually certifies, where it changes the weight of your evidence, and how to verify it.

Read article →
Professionals and Qualifications7 min read

Who can carry out a protected species survey

Disturbing a protected species needs a licence from Natural England, and using an unlicensed surveyor costs a season twice. Here is how the licensing works and what to check before appointing anyone.

Read article →
Professionals and Qualifications7 min read

Do you need a chartered town planner? RTPI membership explained

Planning is not a closed profession in England, so anyone can trade as a planning consultant. Here is what chartered RTPI membership means and when a small project actually needs one.

Read article →
Professionals and Qualifications7 min read

Lighting assessments and obtrusive light competence

A luminaire schedule is not an obtrusive light assessment. This sets out the zone classification that drives every limit, the competence to look for, and the condition to expect.

Read article →
Professionals and Qualifications8 min read

Geotechnical reporting and Eurocode 7 responsibilities

Eurocode 7 splits ground work into an investigation report and a design report with different authors. Knowing which you bought is what prevents a gap at building control.

Read article →
Professionals and Qualifications7 min read

Licensed assessors and BREEAM pre-assessment

A credit tracker is not a pre-assessment an officer will rely on. This explains the licensed assessor requirement, the scheme versions, and the condition wording that follows.

Read article →
Professionals and Qualifications8 min read

Structural engineer competence for a building in poor repair

Chartered status, conservation accreditation and a one page brief decide whether a structural report is useful. What to ask before appointing, and how to read the limitations.

Read article →
Professionals and Qualifications7 min read

Transport planner, highway engineer or traffic consultant

A transport planner writes the assessment, a highway engineer draws the access, a traffic engineer models the junction. How to tell them apart and brief them properly.

Read article →
Professionals and Qualifications6 min read

Checking a consultant's experience before you rely on a report

Qualifications tell you someone is entitled to do the work. They do not tell you whether they have done this particular thing, with this authority, recently.

Read article →
Professionals and Qualifications7 min read

Reviewing an AI-drafted report: the reviewer's scope

Review of a drafted report is a defined piece of work with a defined boundary. Setting that boundary in writing is what protects the reviewer who signs it off.

Read article →
Professionals and Qualifications6 min read

Briefing a consultant so the report answers the council

A technical report fails validation because nobody told the author which requirement it was answering. The brief is where that gets fixed, before any fee is agreed.

Read article →
Professionals and Qualifications7 min read

Professional indemnity cover: what to check before you appoint

A consultant's insurance is the only thing standing between a defective report and your own balance sheet. Check the certificate, the basis of cover and the cap before work starts.

Read article →
Professionals and Qualifications6 min read

What a planning agent can do without RTPI membership

Anyone can call themselves a planning consultant and submit your application. Chartered membership changes the accountability, not the legal right to act.

Read article →
Professionals and Qualifications6 min read

Who signs a geotechnical design report under Eurocode 7

The investigation report presents the data. The design report states the design values and carries responsibility. Here is how the two differ and what the appointment should say.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope