Report Deep Dives articles – page 16

377 articles
Report Deep Dives8 min read

Writing the design evolution section of a DAS

Design evolution is an argument, not a diary. Here is how to build it from constraints, present options that were actually tested, and answer the access limb the Order asks for.

Read article →
Report Deep Dives8 min read

Residual risk and finished floor levels in an FRA

The finished floor levels section has to state the design flood level, the freeboard and what happens in the event beyond the design case. Most assessments skip the third, and consultees keep asking.

Read article →
Report Deep Dives7 min read

Odour assessment for a takeaway: what the report contains

Councils refuse hot food applications on odour more than on anything else, usually because a supplier quotation was submitted instead of an assessment. Here is what the report has to establish and in what order.

Read article →
Report Deep Dives8 min read

LVIA or TVIA: choosing the right visual assessment

Landscape and townscape assessments share a method but not a receptor. Here is how to choose between them, how GLVIA3 sensitivity and magnitude judgements are built, and what a verified view has to prove.

Read article →
Report Deep Dives7 min read

PEA or protected species survey: reading the ecology scope

The appraisal can be done any time of year and tells you which surveys you need. The species surveys are locked to seasons. Here is how the two documents differ and how to programme around them.

Read article →
Report Deep Dives7 min read

Historic Building Recording: Level 2 versus Level 3

A Level 2 record describes the building. A Level 3 record explains how it came to be that way, with measured drawings and a phasing argument behind it.

Read article →
Report Deep Dives7 min read

Fire Statement or Fire Safety Strategy: which one you need

One is a planning form, the other a fire engineering document, and they sit at different gateways. Here is the Article 9A trigger, what each document contains, and the validation failures to avoid.

Read article →
Report Deep Dives7 min read

Mode share targets in a Travel Plan and how to evidence them

Most travel plan targets fail review because they have no baseline and no consequence. Four elements make a target a highway officer will accept.

Read article →
Report Deep Dives7 min read

Flood Risk Assessment or Drainage Strategy: what goes where

The flood risk assessment covers risk to the site, the drainage strategy covers what leaves it. Here is how to split the scope, avoid contradictions and anticipate the conditions each consultee asks for.

Read article →
Report Deep Dives6 min read

Modules A1 to A5 in a Whole Life Carbon Assessment

Upfront carbon is the part of the assessment a planning decision can still influence. Here is what each module covers and where reviewers find weak assumptions.

Read article →
Report Deep Dives7 min read

Sequential and exception tests: what each one must prove

Two separate documents answering two separate questions. Here is how to define the search area, evidence reasonably available sites, and address both limbs of the exception test.

Read article →
Report Deep Dives7 min read

VSC, NSL and ADF in a Daylight and Sunlight Assessment

VSC answers the blocked-window objection, no sky line answers the dark-back-room objection, and internal illuminance answers whether your own flats will be liveable.

Read article →
Report Deep Dives7 min read

Writing the archaeological desk-based assessment baseline

The baseline decides whether a desk-based assessment survives review by the county archaeologist. Here are the sources, the search radius, how to read disturbance, and how to turn data into a testable statement of potential.

Read article →
Report Deep Dives7 min read

Sun-on-ground and transient overshadowing methods compared

One method has a threshold, the other has a story. Choosing between sun-on-ground testing and a transient shadow sequence depends on the objection you are answering.

Read article →
Report Deep Dives9 min read

ProPG and BS 8233 sections of a residential noise assessment

ProPG sets the method and BS 8233 supplies the numbers for new homes near roads, railways and flight paths. This walks through each section of a competent report and the checks an environmental health officer runs first.

Read article →
Report Deep Dives8 min read

Tree categorisation A to U in a BS 5837 survey

BS 5837:2012 sorts every tree on and near your site into U, A, B or C based on quality and how long it will keep contributing. That grade decides which trees your layout has to work around and which the council will let you lose.

Read article →
Report Deep Dives9 min read

Child yield and playable space in a Play Space Assessment

Child yield drives the whole playable space requirement on a residential scheme. Here is how the calculation works, how the 10 m2 per child standard splits across age bands, and what a defensible shortfall case looks like.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope