Rural and Agricultural – Page 5
Class Q conversions, agricultural permitted development, farm diversification and countryside policy.
Rural and Agricultural articles – page 5
134 articlesFarm workers' caravans and the site licence exemptions
Schedule 1 to the 1960 Act exempts caravans housing workers employed in farming operations on the land. Part 5 of the GPDO grants planning permission in the same circumstances, and both fall away together.
Vertical farming and controlled environment agriculture
Indoor growing sits awkwardly in the statutory definition of agriculture, and the answer decides whether permitted development rights apply or a full application is needed.
Grain stores and drying plant: noise and the neighbours
The store is usually permitted development. The drying plant is where complaints start, because it runs through the night in low background conditions. How the assessment and the mitigation work.
Solar canopies and roof arrays over farm buildings
Class J covers solar equipment on non-domestic buildings within tight dimensional limits. A canopy over a yard is a separate structure needing permission, and roof capacity decides whether either is deliverable.
Reservoirs and irrigation storage on farms
A winter fill irrigation reservoir sits outside agricultural permitted development and needs a full application. The safety regime, the abstraction licence and the evidence councils ask for.
Green Belt and agricultural buildings: what is not inappropriate
Buildings for agriculture and forestry sit outside the inappropriate development label in the Green Belt. The exception turns on evidenced functional need, and diversification uses fall outside it.
Dark skies and external lighting in the open countryside
Unlit countryside is the most sensitive lighting environment there is. Environmental zones, bat sensitive design and dark sky policies decide what you can install, and the conditions are enforceable.
Wedding and event venues on farms: the planning issues
A farm events business usually needs planning permission once it stops being ancillary to farming. Noise and highways decide most applications, and licensing does not substitute for either.
Best and most versatile land: when an ALC survey is needed
Published agricultural land classification maps show grade 3 undivided, so only fieldwork can separate 3a from 3b. Here is what the grades mean, when a council will require a survey, and what a report needs to contain.
Livestock buildings and odour assessment near dwellings
Agricultural permitted development is withdrawn for livestock buildings within 400 metres of a dwelling, so a full application and an odour case are needed. Here is what councils expect on odour, ammonia deposition, mitigation and conditions.
Caravan sites on farms: licences and the planning overlap
Site licensing and planning permission are separate consents with separate exemptions. A farm diversification that satisfies one and not the other is still unlawful.
Woodland creation, felling licences and planning permission
Tree planting is rarely development, and felling is controlled by the Forestry Commission rather than the council. Knowing which regime you are in saves a farm scheme months.
Farm tracks and hardstanding under Part 6 of the GPDO
A new farm track is an engineering operation, and on holdings of 5 hectares or more it can be permitted development subject to prior notification and several limits.
Anaerobic digestion on a farm: planning and permitting
Feedstock decides almost everything about a farm digester application: whether it is agricultural development, how much traffic it generates and which permit applies.
Slurry stores and lagoons: planning and permits compared
A new slurry store can need a prior notification, a full application, a notice to the Environment Agency and sometimes an environmental permit. The four regimes do not overlap neatly.
Polytunnels: development, agriculture or neither
Growing is never the issue. Whether erecting the tunnels is a building operation turns on size, permanence and how firmly the hoops are fixed into the ground.
Temporary rural worker's dwellings and the three year test
A limited period permission lets a new rural enterprise build a trading record. The council is approving a trial, and the removal condition is meant seriously.
The functional and financial tests for a rural worker's home
An isolated home in the countryside for a rural worker has to pass two tests. One asks whether the business needs someone on site at night. The other asks whether it can pay for them.
Field to garden: extending a curtilage in the countryside
Enclosing a paddock or field as domestic garden is a material change of use under section 55 of the Town and Country Planning Act 1990. Here is what the council will look at and what to submit.
Landscape and visual evidence for a countryside application
Landscape and visual work fails when it answers the wrong question. Choose viewpoints that address the objections, separate landscape effects from visual effects, and be honest about how long planting takes.
Class Q or a full application for a barn conversion
Class Q is faster and narrower. A full application is slower, costs more in evidence and carries mandatory biodiversity net gain, but it lets you design the building the barn deserves.
Converting a rural building to holiday letting
Holiday letting a converted barn is rarely the same planning use as a house. Occupancy conditions, the limits of Class Q and rural tourism policy decide whether the scheme works.
Farm tracks and new accesses: when permission is needed
Most farm tracks are permitted development under Part 6 of the GPDO 2015, subject to prior notification. The access where the track meets the public road is a separate question, and it is the one that catches people out.
Water supply and foul drainage on remote rural sites
On a remote site the water and drainage answers involve the undertaker, the Environment Agency and environmental health. Each runs on its own timetable, so ask before the design is fixed.