Scenario Walkthroughs articles – page 3

166 articles
Scenario Walkthroughs8 min read

A twelve room care home extension: the walkthrough

Twelve bedrooms is a minor application on floorspace and a difficult one on evidence. An illustrative walkthrough of the parking profile, the garden argument, the daylight tests and the conditions imposed.

Read article →
Scenario Walkthroughs7 min read

A beauty salon in a front room: the planning walkthrough

Four clients a day in a front room usually needs no permission. Add a non-resident therapist and evening hours and it does. An illustrative walkthrough of where the line sits and what the application contained.

Read article →
Scenario Walkthroughs7 min read

School expansion on a playing field: the evidence pack

An illustrative walkthrough of a primary school expansion that takes part of a playing field, and how the replacement provision, agronomy evidence and lighting case were assembled.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: a roof extension adding two flats

An illustrative one storey addition creating two flats on an existing block, from the Part 20 prior approval choice through daylight, structure, lift provision and construction access.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: a farm diversification wedding venue

An illustrative walkthrough of a change of use to a wedding and events venue on a working farm, from the use class question through noise, lane access, parking and foul drainage to the conditions.

Read article →
Scenario Walkthroughs9 min read

Walkthrough: a riverside mill converted to flats

An illustrative walkthrough of a grade II listed mill in Flood Zone 3a becoming 22 flats. Nothing about the structure can move, which makes the flood case and the heritage case the same problem.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: a hot food takeaway in a shopping parade

An illustrative walkthrough of a shop becoming a hot food takeaway with flats above. The application turns on a flue, a fan and a policy about distance from schools.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: church hall to a day nursery

An illustrative walkthrough of a church hall becoming a day nursery. The fabric barely changes, and every difficult question is about use class, outdoor space and the fifteen minutes either side of 9am.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: former petrol station to four houses

On a closed forecourt the contamination evidence drives the application. This illustrative walkthrough follows the sequence from desk study to verification report.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: holiday let in a redundant outbuilding

An illustrative conversion of a redundant cart shed to a holiday unit. Permitted development did not help, and the bat survey season set the programme.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: appeal after non determination

An illustrative major scheme that ran out of determination period. What the appeal statement contained, how the putative reasons narrowed, and the real time saving.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: a scheme amended mid-build

Seven changes arose during construction on an illustrative nine-unit scheme. Four went through section 96A in 24 days; three needed a section 73 and eight weeks.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a riverside site with a flood evacuation plan

An evacuation plan is not a substitute for safe access. This illustrative Flood Zone 3a walkthrough shows how levels, refuge, warning and a plan were assembled into one package.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a car park converted to housing

A surface car park is a strong brownfield proposition, and the application turns on parking survey evidence and drainage. This illustrative walkthrough follows nine flats through to conditions.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a dental practice in a residential conversion

A house to dental practice conversion turns on housing loss policy and plant noise. This illustrative walkthrough follows the application through parking evidence, acoustic design and the conditions that followed.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: an equestrian arena and stable block

Keeping horses is agriculture; riding them is not. This illustrative walkthrough follows an arena and four box stable block through siting, lighting, drainage, access and the conditions that followed.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a play area added to a housing scheme

Play space arrives late on most housing schemes. This illustrative walkthrough follows the child yield calculation, the layout revision and the obligation that secured maintenance.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: a solar array on redundant agricultural land

A farm solar scheme is decided on two documents: the land classification survey and the landscape assessment. This walkthrough shows how both changed the layout.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a dormer loft conversion refused then approved

A box dormer refused on width, height, roof form and materials, redrawn in a day and approved at the second attempt. What changed, what it cost, and why the design guide mattered most.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: shopfront and flats above a parade

Flats above a shop look like a simple conversion until you work out where the front door goes, how the bins get out and what the extraction fan does at 11pm.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: extending a touring caravan site

Planning permission and a site licence are two separate consents with two separate tests. An extension to a touring site needs both, and the order matters.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a mixed use scheme above a railway line

Building over an operational railway puts the infrastructure owner at the centre of the programme. An illustrative walkthrough of how the sequence runs.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: an annexe that became a separate dwelling

An illustrative walkthrough of a garden annexe let to a tenant, the enforcement enquiry that followed, and the two routes back to a lawful position.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a place of worship in a light industrial unit

A place of worship in an industrial unit needs permission, and the case turns on employment land policy, parking at the peak hour and noise in both directions.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope