Scenario Walkthroughs articles – page 6

166 articles
Scenario Walkthroughs6 min read

Walkthrough: a care home on a suburban site

One illustrative 64 bed care home on a suburban parcel, following the use class question, the need case, amenity evidence, servicing and the documents submitted.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: stables and a menage in the Green Belt

One illustrative proposal for four stables and a 20 by 40 metre menage on Green Belt grazing land, following the use class question, the openness test, arena lighting and the documents submitted.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: a mixed use scheme with retail below flats

An illustrative walkthrough of nine flats above a commercial unit, where almost every issue came from the interface between the two uses rather than either use alone.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a scheme in a nutrient neutrality catchment

An illustrative walkthrough of a residential scheme in a nutrient neutrality catchment, from the nutrient budget to the appropriate assessment the council must adopt.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: a shop becoming a children's nursery

An illustrative shop to day nursery change of use: why a condition on an old permission made an application necessary, and how drop off and play noise were dealt with.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: retrospective application after enforcement

An illustrative householder case: an over-deep rear extension with a roof terrace, a planning contravention notice, and why applying before a notice is issued matters.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: a scheme that triggered a Transport Assessment

An illustrative 62 dwelling scheme crossing the point where a Transport Statement is no longer accepted, from the scoping letter through trip rates, modelling and the documents submitted.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: upward extension to add flats

Class AA of Part 20 removes the argument about principle and replaces it with a list of prior approval matters long enough to fail a weak submission on its merits.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: a new agricultural building on a holding

An illustrative walkthrough of a prior notification for a general purpose farm store, from the qualifying area test to the conditions that attach automatically.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: an industrial unit becoming a gym

Storage and distribution to a gym is a material change of use. An illustrative scheme where vibration from dropped weights, not airborne noise, decided it.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: converting a pub to residential

Pubs are sui generis and lost their permitted development rights in 2017. An illustrative conversion, from the community value listing to the committee vote.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: extension to a listed cottage

An illustrative Grade II cottage extension, followed from the first fabric inspection through two parallel consents to the conditions attached at the end.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: house to four self contained flats

Subdividing a house is a material change of use under section 55(3)(a) even with no external works. An illustrative walkthrough of a four flat conversion and the evidence that got it validated.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: farm diversification to glamping pitches

An illustrative walkthrough of a farm diversification application for eight glamping pods, showing how landscape evidence and foul drainage decided the scheme and what conditions came with the permission.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a bat roost found before a demolition

Droppings on a beam in February meant a demolition in October. Where the seven months went, and what could have been done differently.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: loft conversion in an Article 4 area

When an Article 4 direction and a conservation area remove Class B rights, a rear dormer becomes a full application. This walkthrough follows one through.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: shop to hot food takeaway change of use

A hot food takeaway is sui generis, so no permitted development route exists. This illustrative case follows the extraction, noise and parking evidence.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: nine dwellings on an edge of settlement paddock

Nine dwellings sits below the major thresholds but still needs biodiversity net gain, seasonal ecology surveys and a drainage strategy. An illustrative sequence.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: a rear extension refused then approved

An illustrative walkthrough of a rear extension refused on amenity and design grounds, redesigned against the officer report, and approved on a fee-exempt resubmission.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: office to flats under Class MA

An illustrative Class MA prior approval turning a 1970s office into nine flats, following the natural light test, the noise case against a neighbouring pub and the full document pack.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: barn conversion under Class Q

An illustrative Class Q prior approval for a steel portal frame barn, following the structural evidence that decides these cases and the full document pack that went with it.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a shop to residential conversion under Class MA

An illustrative two flat Class MA conversion, showing the evidence that establishes eligibility and the daylight analysis that should have come first.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: an outline application and reserved matters

An illustrative 84 home outline scheme, and the two parameter plans drawn too tightly that constrained the detailed design two years later.

Read article →
Scenario Walkthroughs6 min read

Walkthrough: a cafe extending its hours after complaints

An illustrative walkthrough of a cafe applying to trade later after noise complaints, showing the acoustic and neighbour evidence that carried the case.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope