Templates, Checklists and Examples articles – page 3

250 articles
Templates, Checklists and Examples7 min read

What a county archaeologist expects with your application

The council's archaeological adviser writes the consultation response your case officer relies on. Here is the evidence they expect, in the form they expect it, and the order to produce it in.

Read article →
Templates, Checklists and Examples7 min read

Section outline: design and access statement for an infill plot

A single plot statement should run to eight or twelve pages and answer one question: why this house, on this plot, in this street, at this size.

Read article →
Templates, Checklists and Examples7 min read

Worked example: daylight distribution and the no-sky line

An illustrative worked example of the no-sky line, the 0.8 times former area test, and why room geometry rather than the proposal often drives the result.

Read article →
Templates, Checklists and Examples7 min read

Worked example: attenuation storage volume for a driveway

An illustrative storage volume calculation for a domestic driveway, how a soakaway is sized from an infiltration rate, and when front garden surfacing needs permission.

Read article →
Templates, Checklists and Examples6 min read

Worked example: BS 4142 rating level arithmetic

Rating level minus background is the number a BS 4142 assessment turns on. This illustrative worked example shows how each quantity is derived and how mitigation at source changes the answer.

Read article →
Templates, Checklists and Examples6 min read

Worked example: parking stress survey arithmetic

Parking stress is occupancy divided by kerbside capacity. This illustrative worked example shows the deductions, the 5.5 metre module, the survey timing and how the final percentage is read.

Read article →
Templates, Checklists and Examples6 min read

Checklist: what a lead local flood authority asks for

Lead local flood authorities are statutory consultees on surface water drainage for major development. Here is the information they expect, and the gaps that produce a holding objection.

Read article →
Templates, Checklists and Examples7 min read

Section outline: planning statement for a change of use

A change of use statement has to establish the lawful existing use before it argues anything else. Seven sections in the order a case officer reads them.

Read article →
Templates, Checklists and Examples7 min read

Checklist: evidence for a section 191 certificate on a use

A certificate of lawfulness for an existing use is won on evidence you supply. The categories that count, how to draft a statutory declaration and how to deal with gaps in the record.

Read article →
Templates, Checklists and Examples7 min read

Worked internal daylight check for a lower ground flat

A worked internal daylight check for a lower ground floor flat lit from a light well, with every input stated, the result against BS EN 17037 and average daylight factor, and the design changes that matter.

Read article →
Templates, Checklists and Examples7 min read

Basement impact screening checklist for a terraced house

Most councils with a basement policy want a screening check before any assessment. Here are the questions they ask about groundwater, surface water, movement and trees, and what triggers the full report.

Read article →
Templates, Checklists and Examples7 min read

Evidencing continuous use of a rural building: a checklist

Permitted development routes for agricultural buildings turn on use on a qualifying date, and the burden of proof is yours. Here is the documentary bundle that carries it.

Read article →
Templates, Checklists and Examples7 min read

Recording a shopfront before alteration

A shopfront record satisfies the recording condition and gives your designer the evidence to justify the new work. Here is what to measure, photograph and deposit, and when to do it.

Read article →
Templates, Checklists and Examples7 min read

Worked open space contribution from an adopted standard

An open space contribution is occupancy times the adopted standard, priced for provision and maintenance. Here is the calculation worked through for six dwellings, with illustrative rates.

Read article →
Templates, Checklists and Examples7 min read

Travel plan for a rural employer with no bus service

Where there is no bus service, a travel plan has to carry its mode shift through car sharing, shift patterns and home working. Here is the structure that survives monitoring.

Read article →
Templates, Checklists and Examples7 min read

Amended plans during determination: a submission checklist

The decision notice conditions whatever drawing numbers are on the plans list. Here is how to revise drawings mid-determination without ending up with a permission nobody can build from.

Read article →
Templates, Checklists and Examples7 min read

Worked play space calculation for a forty home scheme

Start with children, not square metres. This works through child yield, the per child standard, age group provision and when a commuted sum is defensible.

Read article →
Templates, Checklists and Examples7 min read

Waste and recycling storage schedule for a flatted scheme

The schedule has to agree with the drawing. This sets out the capacity calculation, container footprints, store requirements and the drag distance that decides the layout.

Read article →
Templates, Checklists and Examples7 min read

Schedule of conditions to negotiate before a committee

A condition agreed in draft costs a phone call; the same condition imposed at committee costs a section 73 application. This is the schedule to work through, in order.

Read article →
Templates, Checklists and Examples7 min read

Survey brief for a bat emergence programme on a barn

A two page brief that tells the ecologist how many emergence visits you are buying, what weather aborts a visit and what the report must contain, before you compare quotes.

Read article →
Templates, Checklists and Examples8 min read

Worked trip generation for a nine dwelling cul-de-sac

Nine houses generate a handful of movements in the peak hour. How to select comparator sites, derive a rate per dwelling, and present an illustrative calculation honestly.

Read article →
Templates, Checklists and Examples9 min read

Site set up checklist before works begin on a treed plot

Protective fencing goes up before demolition, clearance or the first delivery. The conditions to discharge, the fencing specification, and the sequence that signs a site off.

Read article →
Templates, Checklists and Examples8 min read

Receptor selection for a daylight study in a terraced street

Receptor selection decides a daylight result before modelling starts. The screening test, room hierarchy, multi-window rules and an illustrative schedule for eight houses.

Read article →
Templates, Checklists and Examples7 min read

Pre-application enquiry pack for a rural conversion

A pre-application response is only as good as the questions you ask. The plans, photographs, constraints table and numbered questions that get a usable written answer on a rural conversion.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope