Templates, Checklists and Examples articles – page 5

250 articles
Templates, Checklists and Examples6 min read

A condition compliance tracker for a consented scheme

A decision notice with 23 conditions is a work programme. Here is how to extract them into a tracker, classify them by trigger, work the dates back from the build programme and hand the continuing ones over.

Read article →
Templates, Checklists and Examples6 min read

What to put in a planning application covering letter

The covering letter is read by the validation officer before anyone looks at the scheme. Here is what to put in it, what to keep out, and an illustrative structure that removes most validation queries.

Read article →
Templates, Checklists and Examples6 min read

Reserved matters checklist after an outline consent

A reserved matters submission settles the details the outline left open and cannot change what the outline fixed. Here are the time limits, the parameter checks and the document set to assemble.

Read article →
Templates, Checklists and Examples6 min read

Pre-application meeting agenda and the questions to ask

Pre-application advice is worth what you take out of it in writing. Here is the pack to send, an agenda ordered so the expensive questions come first, and the eight questions that produce answers you can use.

Read article →
Templates, Checklists and Examples7 min read

Sequential test for flood risk: an illustrative example

The flood risk sequential test turns on evidence about alternative sites, not on the merits of the scheme. This walks through the search area, the availability judgement and a clearly labelled illustrative comparison table.

Read article →
Templates, Checklists and Examples6 min read

Drawing schedule and revision register for a submission

The approved plans condition is only as reliable as the register behind it. Here is the numbering, revision and issue discipline that keeps a permission usable.

Read article →
Templates, Checklists and Examples6 min read

Site photograph schedule and how to annotate it

A numbered set of views tied to camera positions on a plan lets an officer understand a site without a second visit. Here is how to put one together.

Read article →
Templates, Checklists and Examples6 min read

Viability Assessment input schedule and its assumptions

Most viability arguments are arguments about inputs. This sets out each line of the schedule, the evidence it needs and the assumptions councils reject.

Read article →
Templates, Checklists and Examples6 min read

Utilities Assessment outline and the connection programme

A utilities assessment answers two questions: can the site be connected, and when. Both depend on formal enquiries that should go out in the first month.

Read article →
Templates, Checklists and Examples6 min read

Employment Land Assessment outline for a loss of use

Applications to lose employment floorspace are decided on marketing and demand evidence. This outline sets out each section and what has to sit behind it.

Read article →
Templates, Checklists and Examples7 min read

Open Space Assessment outline and the quantum calculation

The document answers one question with a number. Establish the standard, audit the catchment, identify the deficiency, then apply the standard to the population your scheme generates.

Read article →
Templates, Checklists and Examples7 min read

Equalities Impact Assessment outline for a planning submission

The public sector equality duty sits on the council, not on you. Your assessment gives the decision-maker the material to discharge it, and removes a ground of challenge.

Read article →
Templates, Checklists and Examples7 min read

Structural survey reporting outline for a conversion

The planning-relevant question is whether the building can take the new loads without being substantially rebuilt. Write the report so that answer is findable and evidenced.

Read article →
Templates, Checklists and Examples7 min read

Parking survey report outline and its data tables

A parking survey lives or dies on the survey area, the capacity method and the nights chosen. Here is the reporting structure, with the three tables that carry the analysis.

Read article →
Templates, Checklists and Examples7 min read

Circular Economy Statement outline and the material passport

Two figures drive a Circular Economy Statement, and the commitment runs past determination. A section-by-section outline, from the baseline audit to post-completion reporting.

Read article →
Templates, Checklists and Examples7 min read

Foul Sewage Assessment outline and the capacity question

The question at the centre of a Foul Sewage Assessment is whether the receiving system can take the flow. A section-by-section outline that keeps the capacity evidence at the front.

Read article →
Templates, Checklists and Examples6 min read

Play Space Assessment outline to the GLA standard

Child yield fixes the quantum before any design begins. A seven-section outline for a Play Space Assessment that answers Policy S4, with the distance bands and the areas that do not count.

Read article →
Templates, Checklists and Examples7 min read

Archaeological Desk-Based Assessment outline to CIfA

The part of a desk-based assessment that gets skipped is the records search. Here is the outline a county archaeologist expects, section by section.

Read article →
Templates, Checklists and Examples7 min read

Retail Impact Assessment outline above the threshold

Above the floorspace threshold, one document has to pass the sequential test and answer the impact test. Here is the outline, section by section, with the numbers reviewers check.

Read article →
Templates, Checklists and Examples7 min read

Basement Impact Assessment outline for a London borough

Boroughs audit basement assessments against a fixed sequence. Here is the outline that survives that audit, section by section, with the failures that send documents back.

Read article →
Templates, Checklists and Examples7 min read

Lighting Assessment outline to the ILP guidance

The environmental zone decides every limit in a lighting assessment. This outline runs through baseline survey, luminaire schedule, modelling, contour plots and the conditions to offer.

Read article →
Templates, Checklists and Examples7 min read

What to put in a pre-application enquiry pack

Pre-application advice is only as good as the questions. Send a measured survey, a constraints table and numbered questions, and keep the drawings loose.

Read article →
Templates, Checklists and Examples7 min read

Daylight and sunlight results tables an officer can check

A daylight results table exists so an officer can verify your conclusions without the model. Reference every window, show before, after and ratio, and band the shortfalls.

Read article →
Templates, Checklists and Examples7 min read

Whole life carbon assessment outline, module by module

Report whole life carbon module by module, in order, with one set of units. Here is the structure a sustainability officer can verify, and the assumptions to declare.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope