Use Classes and Change of Use articles – page 3

266 articles
Use Classes and Change of Use7 min read

Cinemas, theatres and live music venues

Cinemas, concert halls, theatres and live music venues sit outside the use classes, so every change of use needs permission. Agent of change decides what happens when housing arrives next door.

Read article →
Use Classes and Change of Use6 min read

Retirement villages and the C2 to C3 boundary

Extra care and retirement village schemes sit on the boundary between Class C2 and Class C3. The care model decides it, and the classification decides the obligations.

Read article →
Use Classes and Change of Use6 min read

Last mile parcel depots in urban locations

Last mile parcel depots sit in Class B8 yet behave nothing like bulk warehousing. Trip generation, pre-dawn van departures and yard noise decide these applications.

Read article →
Use Classes and Change of Use7 min read

Taxi and private hire offices: the classification problem

A booking desk can sit in Class E(c). An operating centre with drivers waiting and vehicles standing is usually sui generis, and that is where refusals come from.

Read article →
Use Classes and Change of Use7 min read

Soft play centres: use class, noise and parking in planning

Soft play normally falls in Class E(d), which makes a move into a former shop or office straightforward and a move into a warehouse a full application. The noise case decides the rest.

Read article →
Use Classes and Change of Use7 min read

Waste transfer, scrapyards and open storage of materials

Scrapyards and minerals yards are excluded from every use class, while non-hazardous waste transfer has no settled home. What that means for the description of development, the permit interface and the evidence base.

Read article →
Use Classes and Change of Use8 min read

Wedding and events venues on a farm

Farm wedding venues sit outside every class in the Use Classes Order, which makes them sui generis and puts them firmly in full application territory. What the application has to prove and how it gets conditioned.

Read article →
Use Classes and Change of Use7 min read

Garden centres: retail, horticulture or both

Horticulture sits inside the statutory definition of agriculture. Retail does not. Which element is primary decides the policy tests, the conditions and the enforcement risk.

Read article →
Use Classes and Change of Use7 min read

Petrol filling stations and their sui generis status

Article 3 of the Use Classes Order puts petrol filling stations outside every class. What that means for the shop, for charging bays and for redeveloping a forecourt.

Read article →
Use Classes and Change of Use7 min read

Farm shops and the proportion of own produce

There is no statutory percentage that turns a farm gate stall into a shop. What the ancillary test looks at, and how to draft a sourcing condition you can live with.

Read article →
Use Classes and Change of Use6 min read

Offices to co-working and flexible desk space

A floor of hot desks is an office in planning terms. Events hire, a public cafe and a members bar are what take a co-working operation outside Class E.

Read article →
Use Classes and Change of Use6 min read

Retail loss policies and the marketing evidence test

Retail protection policies set an evidential hurdle rather than a ban. Marketing at a realistic price, recorded enquiry by enquiry, is what carries the case.

Read article →
Use Classes and Change of Use7 min read

The planning unit and when a mixed use arises

Identify the planning unit before anything else. It decides the description of development, whether an activity is ancillary, and whether a later change needs permission.

Read article →
Use Classes and Change of Use7 min read

Ancillary use and when it becomes a material change

Nothing freezes an ancillary use in place. The factors that decide when it has become a use in its own right, and how to condition and evidence the balance.

Read article →
Use Classes and Change of Use7 min read

Self storage: Class B8 or something else

Storage for the public is still storage, so self storage sits in Class B8. The parts of the model that take it outside, and the policy fight that follows.

Read article →
Use Classes and Change of Use7 min read

Car showrooms, MOT bays and vehicle repair use classes

Selling cars is sui generis, repairing them usually is not, and almost every move between vehicle uses needs permission. The evidence each application needs.

Read article →
Use Classes and Change of Use7 min read

Clinics, surgeries and Class E(e) health services explained

Moving a clinic into a former shop or bank is a change within Class E, so it is not development. The works, the plant and the parking still need attention.

Read article →
Use Classes and Change of Use8 min read

Day nurseries under E(f) and schools under F1(a)

The class decides whether a nursery can occupy a vacant shop with no application, and whether it can later be replaced by a gym. Settle it before drawing anything.

Read article →
Use Classes and Change of Use7 min read

Hostels, aparthotels and the Class C1 boundary

Class C1 covers hotels and guest houses where care is not a substantial element. Hostels sit outside every class, and serviced apartments are judged on the real character of the use.

Read article →
Use Classes and Change of Use7 min read

Large HMOs as sui generis and the evidence needed

Above six sharers an HMO falls outside every use class, so no permitted development right helps. The pack has to prove room sizes, amenity, parking stress and management.

Read article →
Use Classes and Change of Use8 min read

The three to six person boundary for a small HMO

Class C4 runs from three to six residents sharing amenities. Above that the use is sui generis, and inside an Article 4 area even the small change needs permission.

Read article →
Use Classes and Change of Use8 min read

Class F1 against Class F2: which community use sits where

F1 holds institutions with a wide catchment, F2 holds facilities a neighbourhood cannot replace. Movement inside each class is free, movement between them needs permission.

Read article →
Use Classes and Change of Use8 min read

The 280 square metre test for a village shop

Class F2(a) protects a village shop from the flexibility of Class E, but only where the premises are 280 square metres or less and no other food shop sits within 1,000 metres.

Read article →
Use Classes and Change of Use7 min read

Restaurant to hot food takeaway: the sui generis step

Since the 2020 changes a restaurant sits in Class E and a hot food takeaway sits outside the use classes entirely. The step between them is a full planning application, and extraction usually decides it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope