Which Reports Do I Need articles – page 10

434 articles
Which Reports Do I Need6 min read

Which reports a one hectare site in Flood Zone 1 needs

One hectare is the threshold that brings a flood risk assessment into Flood Zone 1. The governing source is usually surface water, and the drainage design carries most of the evidential weight.

Read article →
Which Reports Do I Need6 min read

Reports for a 1,000 square metre residential building

A thousand square metres of residential floorspace makes a scheme major development and puts fire safety information on the agenda. The statutory Fire Statement trigger is keyed to height, not floorspace, and both need checking.

Read article →
Which Reports Do I Need6 min read

Which reports a fifty dwelling scheme needs

Fifty dwellings is comfortably major development, below the EIA screening thresholds on most sites, and at the point where transport and consultation evidence steps up from a statement to an assessment.

Read article →
Which Reports Do I Need6 min read

Which reports a scheme of five dwellings needs

Five new homes is a minor application, below the ten-unit major threshold. That changes which reports are mandatory, which are triggered by site constraints, and which surveys have to be programmed months ahead.

Read article →
Which Reports Do I Need7 min read

Which documents a conservation area application needs

A conservation area scheme needs the usual drawings plus proof that it preserves or enhances the area. Here is the document bundle, the permitted development rights you lose, and the six week tree notice.

Read article →
Which Reports Do I Need6 min read

Documents for a scheme in a Source Protection Zone

A groundwater Source Protection Zone restricts infiltration drainage and penetrative foundations. Here is the document set that answers the Environment Agency before it objects.

Read article →
Which Reports Do I Need7 min read

Documents for a swimming pool building in a rear garden

An enclosed pool building is an outbuilding under Class E, and most refusals turn on height, curtilage coverage or plant noise. Here is what to check and what to submit.

Read article →
Which Reports Do I Need7 min read

Documents for a dwelling containing a known bat roost

A confirmed bat roost fixes the programme: survey season, then planning permission, then a licence, then works. Here are the documents each stage needs and who has to hold the licence.

Read article →
Which Reports Do I Need7 min read

Which reports a scheme in an Archaeological Priority Area needs

An Archaeological Priority Area sets the order of work: desk-based assessment, then field evaluation if potential is found, then a written scheme of investigation for agreed mitigation.

Read article →
Which Reports Do I Need6 min read

Documents for a site crossed by a public sewer

A public sewer imposes a consenting process that runs alongside planning on its own timetable. What to order, what to show and when to start the agreement.

Read article →
Which Reports Do I Need6 min read

Documents for an agricultural building over the Part 6 limits

The ground area, height and siting limits that end the prior notification route, and what a full planning application for a large farm building has to contain.

Read article →
Which Reports Do I Need7 min read

Reports for a scheme with a private water supply

What a planning application has to show when the dwelling will be served by a borehole, spring or shared supply, and how the foul drainage evidence fits alongside it.

Read article →
Which Reports Do I Need6 min read

Documents for a scheme affecting a public right of way

A path on the definitive map needs its own legal order before you build across it. Here are the two document bundles, the tests each one meets, and the timescales.

Read article →
Which Reports Do I Need6 min read

Documents for a scheme in a nutrient neutrality catchment

In an affected catchment, permission waits on an appropriate assessment. Here is the evidence base that supports it, how credits work, and where a scheme cannot proceed.

Read article →
Which Reports Do I Need6 min read

Documents for a scheme in a coal mining reporting area

A coalfield site changes the document list and the programme. Here is what the risk assessment must contain, when a permit is needed, and how mine entries reshape a layout.

Read article →
Which Reports Do I Need7 min read

Which reports a scheme with a Tree Preservation Order needs

Protected trees change the document list before they change the layout. Here is the arboricultural bundle councils expect, and how tree consent runs alongside the planning application.

Read article →
Which Reports Do I Need7 min read

Reports for subdividing a retail unit within Class E

Subdivision within Class E is not a change of use. What triggers an application is the second shopfront, the new duct and the servicing arrangement for two tenants.

Read article →
Which Reports Do I Need8 min read

Documents for a single dwelling in Flood Zone 2

There is no small site exemption in Flood Zone 2. A single dwelling needs a site-specific flood risk assessment whatever the plot size, plus a sequential test that officers routinely reject.

Read article →
Which Reports Do I Need8 min read

Reports for a place of worship in a warehouse

Converting a storage and distribution unit into a place of worship needs full planning permission. The evidence that decides it is parking, noise and the loss of employment floorspace.

Read article →
Which Reports Do I Need7 min read

Which documents a care home of sixty bedrooms needs

Class C2 changes the assessment, and resident vulnerability changes the evidence. Here is the document set a sixty bedroom care home application usually needs.

Read article →
Which Reports Do I Need8 min read

Documents for stables and a menage on a rural holding

Equestrian use falls outside agriculture, so farm permitted development does not apply. Here is the document set for stables, an arena and its floodlighting.

Read article →
Which Reports Do I Need8 min read

Documents for a house to small HMO in an Article 4 area

An Article 4 direction turns a permitted change into a full application judged on concentration policy. Here is the document set and the evidence that carries it.

Read article →
Which Reports Do I Need7 min read

Document set for converting a shop to a hot food takeaway

Hot food takeaways sit outside Class E, so there is no prior approval route. This is the document set a case officer and environmental health will look for.

Read article →
Which Reports Do I Need7 min read

Which reports a 0.5 hectare site needs that a smaller one does not

Site area matters in only a handful of places, and each is consequential: major development status, the flood risk trigger, the small sites metric and EIA screening.

Read article →