Articles – page 102

9463 articles
Residential Scale Thresholds6 min read

Units per hectare: how density is measured and used

Density is an output of the design, not an input. What counts in net developable area, how plans use dwellings per hectare, and how to present a capacity calculation an officer can check.

Read article →
Comparisons6 min read

Rule 6 party or interested person at a planning inquiry

Rule 6 status makes a group a main party at an inquiry, with deadlines, proofs of evidence and the right to cross-examine. Interested persons speak briefly and carry no costs risk. How to choose.

Read article →
Costs, Fees and Budgeting7 min read

What appeal statements of case and proofs of evidence cost

There is no fee to appeal, so the budget is drafting, evidence and advocacy. How the document requirements and effort differ between householder, written representations, hearing and inquiry.

Read article →
Project Type Guides6 min read

Planning permission for an artificial grass pitch

A floodlit synthetic pitch is decided on four things: the effect on playing field land, the floodlighting design, noise from play, and where the surface water goes. Here is the evidence each one needs.

Read article →
Report Deep Dives7 min read

Mitigation schedules that become planning conditions

A mitigation schedule with one row per commitment, each naming the wording, trigger, responsible party and securing mechanism, is what lets a case officer draft conditions that match the design team's intention.

Read article →
Glossary6 min read

Fabric energy efficiency standard in an energy statement

The fabric energy efficiency standard measures space heating and cooling demand from the building shell alone. Here is how the Part L target is set, which design moves shift it, and what an energy statement should report.

Read article →
Which Reports Do I Need6 min read

Documents for a site with a protected tree on the frontage

A protected tree on the front boundary brings a BS 5837 survey, a constraints plan, an impact assessment and a method statement into the application, plus a separate consent for works to the tree itself.

Read article →
Costs, Fees and Budgeting8 min read

The cost of re-consultation after a design change

Amending a live application can add six to fourteen weeks and a missed committee. Which changes trigger re-notification, and when withdrawal is the better route.

Read article →
Project Type Guides8 min read

Putting a mobile phone mast on a church tower

Three permissions, three bodies, three tests. How Part 16 prior approval, the ecclesiastical exemption and the faculty jurisdiction fit together on a church tower installation.

Read article →
Report Deep Dives8 min read

Reporting a bat survey done outside the emergence season

Emergence surveys run May to September. What a preliminary roost assessment can and cannot conclude outside that window, and how councils respond to each suitability category.

Read article →
Which Reports Do I Need7 min read

Document bundle for a site in Flood Zone 3a

Flood Zone 3a puts a new dwelling into the exception test, and the sequential test comes first. The evidence each document needs, and the conditions that follow consent.

Read article →
Glossary8 min read

Overheating criteria under CIBSE TM59

TM59 has two criteria and both must pass. The bedroom test of 26 degrees for no more than 32 hours is the one that usually fails, and the one that drives the design.

Read article →
Professionals and Qualifications7 min read

Reliance letters and who can rely on a survey report

Reading a technical report in a data room creates no rights against its author. How reliance letters, assignment and collateral warranties differ, and what to agree at appointment.

Read article →
Residential Scale Thresholds8 min read

Garden land and windfall sites at infill scale

A garden plot gets no help from brownfield policy and cannot be counted in a windfall allowance. Character, amenity, access and trees decide the application.

Read article →
Comparisons7 min read

Pavement licence or planning permission for outdoor seating

The pavement licence regime only reaches highway land. Where your seating crosses onto private forecourt, or anything is fixed, planning permission is still needed.

Read article →
Costs, Fees and Budgeting7 min read

Independent design review: who pays and what it delivers

A design review report is expert advice, not a decision, and it becomes public once an application is submitted. What panels look for and when a review is worth the programme time.

Read article →
Project Type Guides8 min read

A mobile catering trailer on private land beside a road

The 28 day temporary use allowance is cumulative and rarely covers regular trading. What a roadside catering pitch needs on highway safety, odour, litter and licensing.

Read article →
Report Deep Dives7 min read

Photograph schedules in a historic building record

The register and location plan are what make a building record usable twenty years later. Fields to include, scale and lighting conventions, and the deposit requirements.

Read article →
Which Reports Do I Need7 min read

Document bundle for a house to small HMO conversion

Where an Article 4 direction has withdrawn the C3 to C4 right, a small HMO needs a full application. The drawings, amenity evidence and parking survey that go with it.

Read article →
Glossary7 min read

Internal noise guideline values in BS 8233

The BS 8233 internal ambient noise values are easy to quote and easy to misapply. The open window assumption underneath them is where most assessments are challenged.

Read article →
Professionals and Qualifications7 min read

Checking a consultant's professional indemnity cover

The policy that answers a claim is the one in force when the claim is made, not when the report was written. How to check limits, run-off cover and exclusions before appointing.

Read article →
Permitted Development7 min read

Class A rear extension depth on a detached house

Class A allows a 4 metre single-storey rear extension on a detached house, measured from the original rear wall, and up to 8 metres through the prior approval route.

Read article →
Residential Scale Thresholds7 min read

Section 106 or CIL: which dominates at each scale

Below the major threshold the Community Infrastructure Levy is usually the larger and less negotiable cost. Above it, affordable housing makes section 106 dominant. How to model both.

Read article →
Comparisons7 min read

Section 215 notice or an enforcement notice

Untidy land and unauthorised development are handled by different powers, with different appeal routes and different time limits. How to tell which applies.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope