Articles – page 109

9449 articles
Householder Extensions and Conversions8 min read

Parapets, upstands and shared gutters on a terrace extension

A flat roofed terrace extension fails at the party wall first. Settle the upstand height, the party wall consent and the overflow position before the drawings go in.

Read article →
Report Deep Dives9 min read

The planting schedule and maintenance period in a landscape strategy

A planting schedule becomes a planning obligation the moment the condition is drafted. Here is what it has to specify and where the maintenance period leaves you exposed.

Read article →
Householder Extensions and Conversions8 min read

Rendering the extension and leaving the house in brick

A rendered extension on a brick house falls outside the permitted development materials condition. Here is the design argument that gets one approved, and the detailing behind it.

Read article →
Which Reports Do I Need8 min read

Documents for a scheme beside a railway line

The council validates one set of documents and the infrastructure owner wants another. The asset protection agreement, not the application, is what sets your programme.

Read article →
Report Deep Dives8 min read

Setting the search radius in an archaeological desk assessment

There is no statutory search radius. The choice defines the evidence base and therefore the conclusion, so state the radius, justify it and show the search area.

Read article →
Householder Extensions and Conversions8 min read

Juliet balcony detailing on a rear elevation

A flush balustrade with inward opening doors behaves like a large window. Anything you can stand on is a balcony, and the permitted development position changes.

Read article →
Fire, Structural and Basements8 min read

Structural capacity for an upward extension

Prior approval does not certify that a building can carry two more storeys. Establish capacity and foundation headroom first, then design the extension that fits inside it.

Read article →
Energy, Sustainability and Carbon8 min read

Passivhaus certification against local plan energy policy

Certification measures energy demand per square metre of treated floor area. Policy measures carbon reduction against a notional building. Submit both and translate between them.

Read article →
Scenario Walkthroughs8 min read

Walkthrough: a solar array on redundant agricultural land

A farm solar scheme is decided on two documents: the land classification survey and the landscape assessment. This walkthrough shows how both changed the layout.

Read article →
Costs, Fees and Budgeting7 min read

Planning fee exemptions, concessions and the free go

A fee concession is either in the Regulations or it is not. Here is the full list, the conditions attached to each, and how to claim one without invalidating the application.

Read article →
Planning Process8 min read

Regulation 3 applications: a council deciding its own scheme

A council developing its own land applies to itself under the 1992 General Regulations. The process looks ordinary, the permission does not run with the land, and there is no third party appeal.

Read article →
Refusals and Appeals8 min read

Refusal on housing land supply and the tilted balance

A supply shortfall engages the presumption and changes the weight given to out of date policies. It is not a permission, and inspectors still carry out the balance.

Read article →
Which Reports Do I Need8 min read

Documents for a solar canopy over a car park

A canopy over an existing car park exceeds the stand-alone solar permitted development right, so it needs an application. Reflection, wind, water and trees decide it.

Read article →
Report Deep Dives7 min read

Transient overshadowing frames in an overshadowing study

Sun on ground gives a percentage. Transient frames give the shape of the day, which is what committees argue about. Here is how to set them up and present them.

Read article →
Householder Extensions and Conversions8 min read

Replacing a conservatory with a solid roof extension

A solid roof ends the conservatory exemption. The two places these projects fail are the existing base, never designed for the load, and the eaves height near a boundary.

Read article →
Fire, Structural and Basements8 min read

Trees and basement excavation on the same site

Basement excavation and root protection areas cannot both occupy the same soil. Here is how to measure the conflict, test it with root investigation, and resolve it.

Read article →
Energy, Sustainability and Carbon7 min read

Net zero carbon policies in local plans and the offset payment

A net zero carbon policy means a defined on-site reduction plus a cash payment for the residual tonnes over 30 years. Price both before the land deal, not at section 106 stage.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: a dormer loft conversion refused then approved

A box dormer refused on width, height, roof form and materials, redrawn in a day and approved at the second attempt. What changed, what it cost, and why the design guide mattered most.

Read article →
Costs, Fees and Budgeting7 min read

Planning application fees: how the national schedule works

Planning fees come from a national schedule, not from your council. Understanding the categories and what each fee is calculated from gets the figure right first time.

Read article →
Planning Process7 min read

Committee cycles and your target decision date

The statutory period and the committee calendar do not reconcile themselves. Work from the meeting dates and the report deadline behind them, then set your submission date.

Read article →
Refusals and Appeals7 min read

The householder appeal procedure and its 12 week deadline

Householder appeals run on a 12 week deadline and admit no new evidence, so the statement submitted with the original application becomes your appeal case.

Read article →
Which Reports Do I Need7 min read

Documents for a battery storage scheme on farmland

Grid-scale battery storage in England is decided by the council. The pack turns on fire safety, plant noise, agricultural land quality and a credible restoration commitment.

Read article →
Report Deep Dives7 min read

BREEAM pre-assessment: the credits you cannot trade away

Every BREEAM rating from Pass upwards carries minimum standards that no amount of extra credits elsewhere can replace. Here is how they shape a pre-assessment at planning stage.

Read article →
Householder Extensions and Conversions7 min read

Integral garage conversion: getting the front elevation right

Most integral garage conversions are permitted development, but the front elevation and the lost parking space are what get them refused. Here is how to handle both.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope