PlanScope Blog – Page 123
Practical guides to UK planning applications: which reports your council expects, permitted development, constraints, costs and how to prepare each document.
Articles – page 123
9422 articlesWorked example: self-build exemption paperwork for the levy
An illustrative run through the Community Infrastructure Levy self-build exemption forms, in the order the regulations require, with the surcharges that follow a missed step.
A slurry store and the agricultural notification route
Part 6 prior notification covers most farm slurry stores, with a 28 day period and a narrow council role. The 400 metre protected building rule and the separate storage regulations decide the rest.
Documents where a site adjoins the railway
A site next to operational railway land needs the usual application pack scoped differently, plus a separate asset protection agreement that no planning condition can deliver.
Section outline: transport statement for a 40 dwelling scheme
At 40 dwellings most schemes fall below the transport assessment threshold and need a transport statement instead. Here is the section structure a highway officer expects and the order to write it in.
A shop front alteration and the consents it needs
Replacing a shopfront usually involves two or three separate consents under different regulations. Knowing which element sits under which regime saves a refusal and a second application.
Evidence for a site inside a groundwater source protection zone
A source protection zone does not stop development, but it changes the technical evidence. Infiltration drainage and piling method are the two decisions the Environment Agency will want justified.
Health impact assessment screening and scoping matrices
The screening matrix decides how much health assessment work a scheme needs. Done properly it takes a day and narrows the scope. Done badly it produces a 90 page report nobody reads.
Restaurant to hot food takeaway: the sui generis step
Since the 2020 changes a restaurant sits in Class E and a hot food takeaway sits outside the use classes entirely. The step between them is a full planning application, and extraction usually decides it.
Class Q barn conversions and the structural capability test
The single question that decides most Class Q prior approvals is whether the barn is capable of conversion without substantial rebuilding. A structural report that answers it properly is worth more than any design argument.
When the council's expert disagrees with your consultant
When a council consultee rejects your acoustician's or ecologist's conclusions, the first job is working out whether the disagreement is about method or about judgement. Only one of them can be solved with more analysis.
A boxing or martial arts gym in a railway arch
Railway arches suit gyms until the bag work starts. Impact noise through shared masonry, not music, is what decides these applications, and the infrastructure owner has a say before the council does.
Budgeting section 106 monitoring and review fees
The contribution is the headline number in a section 106 agreement. The monitoring fee, the authority's legal costs and the review mechanism charges are the lines that get missed in the appraisal.
Checklist: preparing for a planning committee presentation
There is no national right to speak at a planning committee, so the first job is finding that authority's own scheme. Then you have around three minutes, and the structure of them matters more than the content.
A flue or chimney for a biomass boiler on an old building
Installing a biomass boiler in an old farmhouse or barn can involve three consents at once: planning, listed building and a chimney height approval under the Clean Air Act 1993.
What to submit where a protected tree stands on the frontage
A protected tree on the frontage changes the drawings before it changes the policy. Here is what a small householder application needs when a TPO tree sits between the house and the road.
Verified view methodology appendices
A verified view is only as good as the survey behind it. Here is what the methodology appendix has to record so a consultee can test the montage rather than take it on trust.
Moving within Class E and the condition that can stop you
Class E lets a shop become an office, a gym or a nursery without an application. A single condition on a permission granted decades ago can take that flexibility away, and it is often buried in the planning history.
New vehicle accesses and why the dropped kerb is separate
A new driveway needs two separate permissions from two separate parts of the council. Getting them in the wrong order is how people end up with a drive they cannot legally drive onto.
Redress when a consultant's report fails at validation
When a report you paid for is rejected by the validation team, the first question is whether the document or the brief was wrong. The answer decides which route to redress is open to you.
An aesthetics clinic in a retail unit
Opening a non surgical aesthetics clinic in a former shop rarely needs a change of use application, because both uses sit inside Class E. The conditions on the old permission, the waste route and the separate registration regimes are what catch people.
Budgeting a prior approval application under Class MA
The application fee for a Class MA prior approval is the smallest line in the budget. The natural light assessment, the noise and contamination evidence and the space standard drawings are what the money goes on.
Worked example: internal illuminance target check for a flat
Climate based daylight modelling reports whether a target illuminance is met across half the room for half the daylight hours. Here is how the calculation is set up and what an illustrative single aspect flat produces.
A swimming pool building in the Green Belt
A detached pool house in the Green Belt is treated as a new building rather than an extension, which changes the policy test entirely. Permitted development may still rescue it.
Validation pack for a site straddling two authority areas
Where a development site crosses a local authority boundary, each council can only determine the part within its own area. That means two applications, two validation lists and one evidence base that has to satisfy both.
Not sure which documents your council will ask for?
Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.
Enter your postcode on PlanScope