Articles – page 131

9408 articles
Costs, Fees and Budgeting7 min read

Hedgerow removal notices and the evidence they require

Under the Hedgerows Regulations 1997 the notice costs nothing but the survey proving a hedge is not important does. How the criteria are tested and how to programme it.

Read article →
Refusals and Appeals7 min read

Article 4 directions: objecting and claiming compensation

Councils give twelve months notice of an Article 4 direction for one reason: it removes the compensation entitlement. Here is how objection and section 108 claims actually work.

Read article →
Which Reports Do I Need7 min read

Reports for a site with a public footpath running through it

Planning permission does not extinguish a public right of way. The diversion order has its own timetable and is usually the longest item on a programme, so it belongs on the critical path.

Read article →
Neighbours, Objections and Community6 min read

Construction noise, hours and dust: who to contact

Construction hours come from planning conditions, but the noise and dust themselves are controlled by pollution law. Sending the complaint to the wrong team costs weeks.

Read article →
Professionals and Qualifications7 min read

Arboricultural credentials and what each one covers

No statute says who may write a BS 5837 survey. Here is what each arboricultural qualification and registration scheme covers, and the checks to run before you submit the report.

Read article →
Viability, Obligations and Commercial7 min read

Town centre health checks and the indicators used

A health check is the baseline that impact, frontage and change of use arguments all rely on. The indicators matter less than whether they were measured consistently.

Read article →
Fire, Structural and Basements7 min read

Ground source borehole arrays and ground stability

A domestic closed loop array rarely needs planning permission. The questions that decide it are the Environment Agency's view of drilling through an aquifer and whether the ground will stay put.

Read article →
Daylight, Sunlight and Amenity7 min read

Assessing dormer windows for overlooking and outlook

A dormer lifts the eye level above fences and hedges, which is why loft conversions attract privacy objections. The answer is a drawn sight line, not an assertion.

Read article →
Energy, Sustainability and Carbon7 min read

How to cite an embodied carbon benchmark honestly

Most disagreements about embodied carbon performance are disagreements about scope. Here is how to cite a benchmark so a reviewer can tell exactly what was counted.

Read article →
Commercial Occupiers7 min read

A gym in a Class E unit: noise, hours and what to submit

A gym in a Class E unit usually needs no change of use application. The application that does arrive turns on impact noise from dropped weights, plant on the roof and the hours condition.

Read article →
Costs, Fees and Budgeting6 min read

Tree work consents that carry no fee and what they still cost

Consent to work on a protected tree costs nothing to apply for. The arboricultural evidence, the replacement planting duty and the six week notice period are where the money and the delay sit.

Read article →
Refusals and Appeals7 min read

Biodiversity net gain disputes at appeal: what can be argued

The biodiversity gain condition is discharged after permission, so net gain rarely appears alone on a refusal notice. Here is how the disputes actually reach appeal and what evidence settles them.

Read article →
Which Reports Do I Need7 min read

Reports for a site alongside a canal or navigable waterway

A canalside scheme needs two parallel consent files: the planning application and the navigation authority's own agreement for works touching the channel. Here is what sits in each.

Read article →
Refusals and Appeals7 min read

Appealing an advertisement discontinuance notice

A discontinuance notice withdraws deemed consent for a sign that is already up. Here are the grounds that engage the statutory test, the deadlines that matter, and the replacement that usually settles it.

Read article →
Costs, Fees and Budgeting7 min read

Street naming and numbering charges on a new scheme

A finished house without an official address has no postcode, no utility accounts and no realistic mortgage offer. Here is how allocation works, what it costs and when to apply.

Read article →
Commercial Occupiers7 min read

Opening a dental practice in a former shop unit

The use change from shop to dental surgery is not development, so the applications come from the plant, extract, waste store and shopfront instead. Here is the sequence and the conditions to expect.

Read article →
Which Reports Do I Need7 min read

Planning reports for a site adjoining an operational railway

A railway boundary adds a second approvals process with its own lead times. What the infrastructure owner will require on noise, fencing, ground movement and drainage, and what to submit.

Read article →
Refusals and Appeals7 min read

Appeals where the council changes its case

When reasons for refusal are drafted after a vote and later withdrawn, the appeal shifts from rebuttal to positive case. How to handle thin evidence, objector arguments and a costs application.

Read article →
Which Reports Do I Need7 min read

Planning reports for a site in an airport safeguarding zone

Safeguarding surfaces are geometric and do not bend, so establish them before fixing the massing. What the aerodrome operator will ask for and which reports the application needs.

Read article →
Neighbours, Objections and Community7 min read

Objecting to a phone mast under permitted development

Most masts arrive as prior approval applications where only siting and appearance are in scope. Here is which arguments can succeed, which cannot, and the deadline that decides everything.

Read article →
Professionals and Qualifications6 min read

What chartered town planner status means for your application

Anyone may call themselves a planning consultant in England. Here is what chartered membership of the planning institute actually certifies, where it changes the weight of your evidence, and how to verify it.

Read article →
Viability, Obligations and Commercial7 min read

Estate management charges secured by planning obligation

The annual estate charge on a new development usually traces back to a planning obligation signed before the first brick. Here is how the arrangements are built, what they bind, and what to ask before exchange.

Read article →
Fire, Structural and Basements7 min read

Crane oversail and airspace rights on tight sites

A jib swinging over adjoining land can be restrained without proof of damage, and the usual remedy is an injunction. Here is how oversail licences are negotiated and how the risk is built into the programme.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight reporting for a listed building's fixed windows

A listed building's windows are fixed geometry, so every adjustment has to come out of the proposal. How to run the assessment, separate amenity loss from heritage harm, and present a shortfall credibly.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope