Articles – page 139

9395 articles
Energy, Sustainability and Carbon8 min read

Connection ready conditions for a future heat network

A connection-ready condition secures physical provision, not a commitment to buy heat. How to draft one that can be discharged, and what evidence the council will want.

Read article →
Flood, Drainage and SuDS8 min read

Foul pumping stations: design, adoption and objections

A foul pumping station costs land, a standoff from dwellings, emergency storage and an adoption agreement. What the undertaker expects and which alternatives to test first.

Read article →
Use Classes and Change of Use8 min read

Public halls, clubhouses and scout huts in Class F2

Village halls, scout huts and clubhouses usually sit in Class F2, so their activities can change freely. Bar-led trading, members-only access and amplified music events are where that stops.

Read article →
Seasonal Calendar7 min read

Habitat survey timing for the biodiversity metric

Condition assessment for the statutory biodiversity metric depends on species composition, so it needs the growing season. The options when a submission lands in winter, and what each costs.

Read article →
Noise, Air, Odour and Light8 min read

Assessing noise from a takeaway extract fan

Kitchen extract fans run late at night a few metres from bedroom windows, which is why they attract objections. What a defensible noise assessment needs and where suppliers' data misleads.

Read article →
Trees and Arboriculture7 min read

Answering a tree officer objection with evidence

A tree officer objection is rarely about whether trees matter. It is about survey accuracy, root protection area incursion or long-term pressure on retained trees, and each needs different evidence.

Read article →
Fire, Structural and Basements8 min read

Facade retention schemes and their consent trail

Holding a facade in the air while the building behind it goes needs more than one consent. What each approval covers, how monitoring triggers are set, and what to submit.

Read article →
Energy, Sustainability and Carbon7 min read

Biomass heating in an air quality management area

An AQMA exists because an air quality objective is being missed, and wood combustion emits the pollutants in question. What a biomass heating application has to show on appliance data, flue height and alternatives.

Read article →
Flood, Drainage and SuDS8 min read

Who adopts a SuDS scheme, and what that decides

Adoption is a design decision, not a paperwork exercise. The four routes for surface water drainage in England each dictate different slopes, access, treatment and long-term cost.

Read article →
Use Classes and Change of Use8 min read

Museums, galleries and libraries in Class F1

Museums, public libraries, free galleries and exhibition halls share one use class, so moving between them is not development. Selling art, running a late bar or growing the cafe is a different question.

Read article →
Use Classes and Change of Use7 min read

Banks, building societies and post offices in a parade

A closed bank can become a shop, a cafe, a clinic or a nursery without any application, because all of those are Class E. The consents you do need are about the frontage.

Read article →
Seasonal Calendar7 min read

Dormouse survey seasons and nest tube programmes

Dormouse survey effort is scored rather than counted, and the months are weighted. Start late in the season and the arithmetic forces you into a second year.

Read article →
Noise, Air, Odour and Light8 min read

Plant noise from a rooftop condenser next to flats

A condenser on a flat roof beneath somebody's bedroom window is the hardest plant noise case there is, because the night-time background gives you almost no headroom.

Read article →
Trees and Arboriculture7 min read

Utility trenches near trees and trenchless alternatives

The tree survives the groundworks and then dies four years after the electricity connection. Service routes are where root protection fails, and the fix is in the order you place.

Read article →
Fire, Structural and Basements7 min read

Temporary works in a construction management plan

Construction management plans usually cover lorries and wheel washing well and temporary works badly. These are the items that cause the disputes on a constrained urban site.

Read article →
Energy, Sustainability and Carbon7 min read

Reconciling Part O overheating with Part L in one design

Part L rewards a sealed, well insulated envelope and Part O penalises the solar gain that comes with it. The conflict is resolved at massing stage, not at technical design.

Read article →
Flood, Drainage and SuDS7 min read

Blue roofs and podium attenuation on constrained sites

Roof level storage solves a site with no ground to work with, and it introduces loading, warranty and maintenance questions that a below-ground tank never raises.

Read article →
Use Classes and Change of Use7 min read

Funeral directors, laundrettes and dry cleaners: use class

All three of these uses were in the old shops class and now sit in Class E. What changes is not the classification but the plant, extraction and permitting that come with them.

Read article →
Seasonal Calendar7 min read

Badger survey timing across the year

Badger setts can be surveyed at any time of year, which lulls people into leaving it late. The constraint that actually decides the programme is the licensing season.

Read article →
Noise, Air, Odour and Light7 min read

Internal noise levels for a new dwelling under BS 8233

BS 8233 gives guideline internal ambient noise levels, not limits. What matters in a submission is the ventilation assumption and what you do when the values cannot be met.

Read article →
Trees and Arboriculture7 min read

Evidencing compliance with canopy cover policies

Canopy cover policies are simple to state and awkward to evidence. This sets out the measurement, the maturity projection and the tables that settle the question.

Read article →
Fire, Structural and Basements7 min read

Mass timber and the constraints at planning stage

Structural material is usually a building control matter. With mass timber it arrives in the planning submission, through the fire statement, the external wall rules and the carbon case.

Read article →
Energy, Sustainability and Carbon6 min read

Air permeability targets and as-built test failures

An air permeability figure in a Part L calculation is a promise about site workmanship. Here is where the leakage happens, how the test works and what to do when it fails.

Read article →
Seasonal Calendar7 min read

Wintering bird surveys and when they have to start

Miss the October start and the data cannot be made up until the following winter. This explains which sites need wintering bird surveys and how the habitats regulations drive the programme.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope