Articles – page 154

9367 articles
Residential Scale Thresholds6 min read

Estate management companies and the point they appear

A management company appears when something will not be adopted, usually between 20 and 50 dwellings. Here is what it takes on, how charges bind owners, and what the council will require.

Read article →
Comparisons6 min read

Prior approval or permission for a large rear extension

A 6 or 8 metre rear extension can avoid a planning application, but only through the prior approval procedure. Here is how that route compares with a householder application.

Read article →
Costs, Fees and Budgeting6 min read

Budgeting a section 73 variation on a live permission

A section 73 variation looks inexpensive until the refreshed reports, the deed of variation and the recalculated levy arrive. Here is how to budget the whole exercise on a live site.

Read article →
Report Deep Dives6 min read

Mitigation and enhancement in an ecological appraisal

The mitigation and enhancement section becomes the conditions. Here is how to work through the hierarchy, what counts as a real biodiversity gain, and how it meets the statutory metric.

Read article →
Which Reports Do I Need7 min read

Reports for a rewilding or land use change scheme

Stopping farming is usually not development. The fence, the track, the pond and the visitor hide are. Here is the evidence base for a rewilding or habitat creation scheme on agricultural land.

Read article →
Professionals and Qualifications6 min read

What suitably qualified means for a heritage statement

No rule says a heritage statement needs an accredited author. Policy asks for expertise proportionate to the asset, which is a sliding scale. Here is where the line falls in practice.

Read article →
Noise, Air, Odour and Light7 min read

Car park lighting: uniformity, spill and surveillance

Car park lighting has to satisfy pedestrians, cameras and the neighbour facing the boundary. Here is how the design targets stack up, and what belongs in the submitted calculations.

Read article →
Heritage and Archaeology6 min read

Reinstating lost features: the evidence a council expects

Putting a lost feature back needs listed building consent, and the decision turns on your evidence for what was there. Here is what conservation officers accept and what they treat as conjecture.

Read article →
Data Tools How-To6 min read

How to find an Article 4 direction before you rely on PD

An Article 4 direction withdraws permitted development rights in a defined area, and it decides whether your conversion needs an application. Here is how to find one, read it and confirm it in writing.

Read article →
Scenario Walkthroughs7 min read

Walkthrough: nine dwellings on a village edge site

Nine units keeps a scheme minor, with an eight-week target and no affordable requirement in most authorities. This illustrative walkthrough follows the evidence base for a paddock site at the edge of a village.

Read article →
Residential Scale Thresholds7 min read

Construction logistics expectations as a site grows

Construction traffic is a condition on a small site and a separate discipline on a large one. Here is where the step happens, and what the highway authority expects on each side of it.

Read article →
Comparisons6 min read

Lawful development certificate or retrospective application

After unauthorised work there are two routes. One tests dates and evidence, the other tests planning merits and ends in conditions. Here is how the choice actually works.

Read article →
Costs, Fees and Budgeting6 min read

When a barrister's opinion earns its fee in a planning case

Counsel is worth instructing when a legal question decides the route, not the argument. A practical look at what a planning barrister can answer, how to instruct efficiently and when privilege matters.

Read article →
Report Deep Dives7 min read

Catchment and capacity in a social infrastructure assessment

The catchment and capacity section decides whether a contribution figure is arithmetic or argument. Here is how to define catchments per facility type, source capacity data and tie the findings to heads of terms.

Read article →
Which Reports Do I Need7 min read

Reports for a scheme inside an air quality management area

A declared air quality management area changes the evidence base, not the answer. Here is the document set an English authority expects, and how the exposure and emissions halves of the assessment fit together.

Read article →
Noise, Air, Odour and Light7 min read

Gym impact noise in a building with flats above

An illustrative fitness studio below four floors of flats: why plant noise methods fail, what a transfer measurement tells you, and how floors, limiters and conditions work together.

Read article →
Heritage and Archaeology7 min read

Historic window glass and the case for keeping it

Joinery can be remade but historic glass cannot. How to tell crown from cylinder from float, which draught and comfort measures keep the glass, and how to document it pane by pane.

Read article →
Scenario Walkthroughs7 min read

Demolishing a locally listed building: an illustrative case

An illustrative application to demolish a locally listed former laundry: establishing significance without a proper list description, condition and marketing evidence, and the committee reasoning.

Read article →
Residential Scale Thresholds7 min read

EIA screening for a housing site near the threshold

Schedule 2 thresholds trigger a screening decision rather than an environmental impact assessment. How sensitive areas change the test, what a good request contains, and what each outcome does to the programme.

Read article →
Costs, Fees and Budgeting7 min read

The self-build CIL exemption and the step people miss

The self-build exemption from the community infrastructure levy is lost by paperwork far more often than by ineligibility. The sequence, the deadlines and what happens when a step is missed.

Read article →
Report Deep Dives7 min read

Choosing and agreeing viewpoints for an LVIA

The viewpoint list decides how credible a landscape and visual assessment is. Here is how to scope with a zone of theoretical visibility, cover every receptor group, and agree the list in writing first.

Read article →
Which Reports Do I Need7 min read

Reports for a mezzanine floor in an existing unit

Section 55(2A) makes a retail mezzanine over 200 square metres development. Here is what that triggers in policy terms, what fire and access rules demand regardless, and what to submit.

Read article →
Professionals and Qualifications7 min read

Who should write an LVIA: chartership and GLVIA3 competence

The landscape and visual guidelines depend on reasoned judgement, so the author matters. What chartership signals, why assessment differs from design, and how to brief a proportionate assessment.

Read article →
Noise, Air, Odour and Light7 min read

Illuminated signs: luminance limits and advertisement consent

Illuminated advertisement brightness is capped by published tables that vary with environmental zone and sign area. Here is how consent works, what digital displays attract, and what to submit.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope