Articles – page 164

9349 articles
Costs, Fees and Budgeting7 min read

Stage payments and cash flow on a small development

Planning costs arrive in four bursts, not evenly. Mapping each one against the programme is what keeps a small development's cash flow from failing at discharge stage.

Read article →
Glossary7 min read

Conditions precedent and why the wording matters

A condition precedent stops development until something is approved. The wording creates it, and the fortnight before determination is when it can still be changed.

Read article →
Constraints and Designations7 min read

Special Protection Area citations and qualifying features

The qualifying features named in an SPA citation define what a habitats regulations assessment is about. The conservation objectives define what integrity means.

Read article →
Heritage and Archaeology7 min read

Render removal on historic walls and the breathability case

Removing render from a listed or historic solid wall turns on two questions: is the render part of the special interest, and is it doing measurable harm?

Read article →
Ecology, BNG and Protected Species7 min read

Soil translocation and habitat creation on stripped ground

Grassland creation usually fails on soil, not seed. Nutrient stripping, careful translocation and a specification a contractor can price are what make the units deliverable.

Read article →
Costs, Fees and Budgeting6 min read

Planning fee indexation and budgeting across a year

Planning fees in England are indexed annually from 1 April and fixed by the date of a valid application. That single date shapes how a practice packages its submissions.

Read article →
Glossary6 min read

The Whitley principle and conditions discharged late

Under the Whitley principle, work carried out in breach of a condition precedent does not implement the permission. Here is how the rule works, and how to avoid it.

Read article →
Costs, Fees and Budgeting7 min read

Professional review fees and when sign-off is required

Some planning reports must be authored by a licensed or competent person; most only need a specialist read and sign-off. The difference decides what a review costs and when to book it.

Read article →
Constraints and Designations6 min read

Reading an SSSI citation and the notified features

Damage to an SSSI is measured against the features it was notified for. The citation, the map, the consent list and the management statement set the scope of every assessment.

Read article →
Heritage and Archaeology7 min read

Heritage statement for a rear extension on a listed cottage

A rear extension on a listed cottage needs consent and a statement that ranks what is special, explains the junction with the old fabric, and is honest about harm.

Read article →
Ecology, BNG and Protected Species7 min read

Hedgerow units and the Hedgerows Regulations overlap

The biodiversity metric asks what a hedge is worth in units. The Hedgerows Regulations 1997 ask whether it may be removed at all. The two regimes often give different answers.

Read article →
Glossary7 min read

Material operation under section 56: what counts as a start

Section 56 fixes the date development begins. Here is the closed list of material operations, the works that do not count, and the records that prove the start years later.

Read article →
Heritage and Archaeology6 min read

Laser scanning and photogrammetry before demolition

Scanning captures geometry, photogrammetry captures surface. Neither is a record on its own, because a recording condition asks for an analytical document.

Read article →
Costs, Fees and Budgeting6 min read

Nutrient neutrality mitigation and how it is budgeted

Nutrient neutrality is a catchment-wide constraint that has to be priced into the land bid. The delay risk usually costs more than the mitigation.

Read article →
Glossary6 min read

The Newbury tests and when a condition is unlawful

A planning condition can satisfy every policy test in guidance and still be unlawful. The Newbury tests are the three that decide validity.

Read article →
Constraints and Designations6 min read

Scheduled monument boundaries and the setting

The red line on a scheduled monument entry answers where consent is needed, not where the remains are. Setting is assessed under planning policy, not the 1979 Act.

Read article →
Ecology, BNG and Protected Species6 min read

Otter surveys and working windows on a watercourse

Otter resting places are protected whether the animal is present or not, so a holt in the working corridor is a constraint from day one rather than a site issue.

Read article →
Heritage and Archaeology6 min read

Lime mortar specification in a consent application

Repoint in lime mortar to match existing tells a conservation officer nothing. What the specification, the analysis and the joint detail need to cover.

Read article →
Energy, Sustainability and Carbon6 min read

Biomass boilers in a smoke control area

A biomass boiler in a smoke control area is lawful only where the appliance is exempt or the fuel is authorised, and the exemption conditions are where schemes fail.

Read article →
Costs, Fees and Budgeting6 min read

VAT on conversions and new builds in planning terms

A condition prohibiting separate use or disposal removes zero rating from a new dwelling. Sort the wording at application stage, not after the decision notice.

Read article →
Glossary6 min read

Section 288 challenges to a planning decision

Section 288 is the only route to challenge an inspector's appeal decision, and the six week limit runs from the date the decision was taken, not received.

Read article →
Constraints and Designations6 min read

Common land and consent for works

Restricted works on registered common land need consent from the Secretary of State under section 38 of the Commons Act 2006, separate from any planning permission.

Read article →
Ecology, BNG and Protected Species6 min read

Green roofs in the metric: substrate depth and scoring

A green roof earns biodiversity units only if it is built as habitat. Substrate depth and variation decide the condition score, and the structure has to carry it.

Read article →
Heritage and Archaeology6 min read

Replacing a historic shopfront: the consents involved

A shopfront scheme on a historic building usually needs three consents assessed on three different tests. Signage and security shutters cause most of the refusals.

Read article →