Articles – page 177

9325 articles
Costs, Fees and Budgeting6 min read

How planning fees are indexed each April

Fees now move on a set date every year rather than whenever a statutory instrument appears. That changes how a practice quotes, how it reconciles, and how it times a submission.

Read article →
Project Type Guides6 min read

Rooftop flats: Class AA compared with a full application

Airspace schemes look simple on a section drawing. The permitted development route brings a long list of prior approval matters, and on many buildings a full application ends up being the quicker of the two.

Read article →
Glossary6 min read

Construction exclusion zone

The fencing that goes up around a retained tree is not a gesture. It defines an area where nothing happens, and the moment something does, the tree's survival becomes a question rather than an assumption.

Read article →
Viability, Obligations and Commercial7 min read

Cascade mechanisms when no registered provider is found

Every affordable housing agreement assumes a provider will take the units. The cascade is what happens when none will, and it is the clause most often drafted in a hurry and needed in earnest.

Read article →
Fire, Structural and Basements6 min read

Sprinklers as a planning matter rather than a building one

Suppression is a building control requirement in most new residential buildings. It becomes a planning issue only when the layout depends on it, and that distinction decides whether a condition will survive.

Read article →
Noise, Air, Odour and Light6 min read

Sky glow, dark skies and upward light ratio

Upward light ratio only counts the light a fitting throws above the horizontal. In a dark rural setting, the light bouncing off a wet yard can do as much to the sky as the fitting ever did.

Read article →
Rural and Agricultural6 min read

Agricultural land grades and solar farm siting

The published maps do not separate grade 3a from 3b, and that single gap is why so many solar applications end up commissioning a field survey they had not budgeted for.

Read article →
Planning Law Updates6 min read

Gateways two and three: the programme effect after permission

Planning permission used to be the point at which a residential tower became a construction programme. For higher-risk buildings it is now the point at which a second approval process starts, with its own clock.

Read article →
Viability, Obligations and Commercial6 min read

Phasing affordable delivery across a large site

The percentage is agreed in a morning. The phasing schedule takes six weeks, and it is the part that decides whether the scheme can actually be built out in the order the developer intends.

Read article →
Fire, Structural and Basements6 min read

Measuring building height for the higher-risk threshold

Half a metre either side of 18 metres changes the consent route, the programme and the cost of a scheme. The measurement convention is written down, and it is not the one most design teams use by habit.

Read article →
Noise, Air, Odour and Light6 min read

Bioaerosols and separation distance from composting

The standoff figure quoted at every composting inquiry is a screening trigger, not a standard. Knowing what it triggers, and what it does not, is the difference between a usable assessment and a stalled application.

Read article →
Rural and Agricultural6 min read

Anaerobic digestion on a dairy farm

A digester fed on your own slurry and spread on your own land is one proposition. The same tanks fed by imported waste, with gas going to the grid, is a different planning application entirely.

Read article →
Planning Law Updates6 min read

Electric vehicle charging: what needs permission

A wall box on a private drive is usually permitted development. A row of rapid chargers with a substation, a canopy and lighting is a development proposal, and the gap between the two is narrower than it looks.

Read article →
Viability, Obligations and Commercial6 min read

Self-build plots secured through a planning obligation

The clause that matters is not the one requiring plots. It is the one that says what happens when nobody buys them, and most disputes on small allocations start there.

Read article →
Fire, Structural and Basements7 min read

Filling in the fire statement form section by section

The form is short, which is exactly why it gets written badly. Each section is asking a specific question about this site, and generic answers come straight back through consultation.

Read article →
Noise, Air, Odour and Light6 min read

Odour from waste transfer and composting facilities

Two regimes look at the same smell. Knowing which one controls what stops a planning application collapsing into an argument the environmental permit was going to settle anyway.

Read article →
Rural and Agricultural6 min read

Siting a grain store on an exposed ridge

On a ridge, the prior approval question stops being a formality. Siting, cladding colour and cut levels decide whether a grain store reads as a farm building or as an object on the skyline.

Read article →
Planning Law Updates7 min read

Article 4 directions: the national tests for making one

An Article 4 direction removes a permitted development right for a defined area. The procedure, the evidence test and the compensation trap explain why councils use them sparingly and why the ones they do make tend to stick.

Read article →
Viability, Obligations and Commercial6 min read

Older persons housing and the affordable requirement

On an extra care scheme the affordable housing negotiation is usually settled before it starts, by the answer to a use class question that both sides would rather argue about later.

Read article →
Fire, Structural and Basements6 min read

When a fire statement is required with a planning application

The fire statement requirement turns on two things: what the building contains and how tall it is. Both are narrower than people assume, and both decide whether your application validates.

Read article →
Noise, Air, Odour and Light7 min read

External amenity noise criteria for gardens and balconies

The external amenity criterion is a guideline range, not a standard, and it was never written for a sixth-floor balcony on a main road. Knowing that is the difference between a workable case and a refusal.

Read article →
Flood, Drainage and SuDS6 min read

Finished floor levels and freeboard: setting them defensibly

A finished floor level is only as defensible as the flood level it sits above. Get the design event, the allowance and the datum right, and the freeboard argument becomes straightforward.

Read article →
Rural and Agricultural7 min read

Where ancillary farm shop sales end

A farm selling its own produce at the gate is usually still farming. Add a coffee machine, a chiller of bought-in cheese and a car park, and at some point it becomes a shop. Here is where the line sits.

Read article →
Report Deep Dives7 min read

What a fire statement must cover at Gateway One

The fire statement submitted with a planning application answers a fixed set of planning-stage questions about access, water, layout and external walls. Here is what each section has to say, and who is competent to say it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope