PlanScope Blog – Page 177
Practical guides to UK planning applications: which reports your council expects, permitted development, constraints, costs and how to prepare each document.
Articles – page 177
9325 articlesHow planning fees are indexed each April
Fees now move on a set date every year rather than whenever a statutory instrument appears. That changes how a practice quotes, how it reconciles, and how it times a submission.
Rooftop flats: Class AA compared with a full application
Airspace schemes look simple on a section drawing. The permitted development route brings a long list of prior approval matters, and on many buildings a full application ends up being the quicker of the two.
Construction exclusion zone
The fencing that goes up around a retained tree is not a gesture. It defines an area where nothing happens, and the moment something does, the tree's survival becomes a question rather than an assumption.
Cascade mechanisms when no registered provider is found
Every affordable housing agreement assumes a provider will take the units. The cascade is what happens when none will, and it is the clause most often drafted in a hurry and needed in earnest.
Sprinklers as a planning matter rather than a building one
Suppression is a building control requirement in most new residential buildings. It becomes a planning issue only when the layout depends on it, and that distinction decides whether a condition will survive.
Sky glow, dark skies and upward light ratio
Upward light ratio only counts the light a fitting throws above the horizontal. In a dark rural setting, the light bouncing off a wet yard can do as much to the sky as the fitting ever did.
Agricultural land grades and solar farm siting
The published maps do not separate grade 3a from 3b, and that single gap is why so many solar applications end up commissioning a field survey they had not budgeted for.
Gateways two and three: the programme effect after permission
Planning permission used to be the point at which a residential tower became a construction programme. For higher-risk buildings it is now the point at which a second approval process starts, with its own clock.
Phasing affordable delivery across a large site
The percentage is agreed in a morning. The phasing schedule takes six weeks, and it is the part that decides whether the scheme can actually be built out in the order the developer intends.
Measuring building height for the higher-risk threshold
Half a metre either side of 18 metres changes the consent route, the programme and the cost of a scheme. The measurement convention is written down, and it is not the one most design teams use by habit.
Bioaerosols and separation distance from composting
The standoff figure quoted at every composting inquiry is a screening trigger, not a standard. Knowing what it triggers, and what it does not, is the difference between a usable assessment and a stalled application.
Anaerobic digestion on a dairy farm
A digester fed on your own slurry and spread on your own land is one proposition. The same tanks fed by imported waste, with gas going to the grid, is a different planning application entirely.
Electric vehicle charging: what needs permission
A wall box on a private drive is usually permitted development. A row of rapid chargers with a substation, a canopy and lighting is a development proposal, and the gap between the two is narrower than it looks.
Self-build plots secured through a planning obligation
The clause that matters is not the one requiring plots. It is the one that says what happens when nobody buys them, and most disputes on small allocations start there.
Filling in the fire statement form section by section
The form is short, which is exactly why it gets written badly. Each section is asking a specific question about this site, and generic answers come straight back through consultation.
Odour from waste transfer and composting facilities
Two regimes look at the same smell. Knowing which one controls what stops a planning application collapsing into an argument the environmental permit was going to settle anyway.
Siting a grain store on an exposed ridge
On a ridge, the prior approval question stops being a formality. Siting, cladding colour and cut levels decide whether a grain store reads as a farm building or as an object on the skyline.
Article 4 directions: the national tests for making one
An Article 4 direction removes a permitted development right for a defined area. The procedure, the evidence test and the compensation trap explain why councils use them sparingly and why the ones they do make tend to stick.
Older persons housing and the affordable requirement
On an extra care scheme the affordable housing negotiation is usually settled before it starts, by the answer to a use class question that both sides would rather argue about later.
When a fire statement is required with a planning application
The fire statement requirement turns on two things: what the building contains and how tall it is. Both are narrower than people assume, and both decide whether your application validates.
External amenity noise criteria for gardens and balconies
The external amenity criterion is a guideline range, not a standard, and it was never written for a sixth-floor balcony on a main road. Knowing that is the difference between a workable case and a refusal.
Finished floor levels and freeboard: setting them defensibly
A finished floor level is only as defensible as the flood level it sits above. Get the design event, the allowance and the datum right, and the freeboard argument becomes straightforward.
Where ancillary farm shop sales end
A farm selling its own produce at the gate is usually still farming. Add a coffee machine, a chiller of bought-in cheese and a car park, and at some point it becomes a shop. Here is where the line sits.
What a fire statement must cover at Gateway One
The fire statement submitted with a planning application answers a fixed set of planning-stage questions about access, water, layout and external walls. Here is what each section has to say, and who is competent to say it.
Not sure which documents your council will ask for?
Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.
Enter your postcode on PlanScope