Articles – page 214

9225 articles
Costs, Fees and Budgeting6 min read

Budgeting a whole life carbon assessment

Three things drive the price of a whole life carbon assessment, and the fee rate is the last of them. How to scope the brief before asking for quotes.

Read article →
Templates, Checklists and Examples6 min read

Defining a sequential test search area on a rural site

The sequential test is usually lost on the area of search rather than the sites. How to define it, agree it and record the evidence, with an illustrative example.

Read article →
Project Type Guides6 min read

A wedding venue in a farm building: the application

Why a barn wedding venue needs a full change of use application, and how the noise, dispersal, parking and drainage evidence decides it.

Read article →
Which Reports Do I Need6 min read

Documents for an agricultural building over the Part 6 limits

The ground area, height and siting limits that end the prior notification route, and what a full planning application for a large farm building has to contain.

Read article →
Report Deep Dives6 min read

Utilities capacity evidence for a residential scheme

What a utilities assessment has to prove, how to raise pre-development enquiries that produce usable answers, and why substation land take decides layouts.

Read article →
Neighbours, Objections and Community6 min read

Following an application through the public register

Documents appear on the planning register without notice, plans get replaced and consultee letters arrive weeks apart. How to follow a case properly.

Read article →
Use Classes and Change of Use6 min read

General industrial to storage and distribution: B2 to B8

Why a B2 to B8 change usually needs a planning application, and how the traffic, noise and employment land evidence decides it.

Read article →
Professionals and Qualifications6 min read

Reading a consultant CV for real competence

Chartered status certifies a competence framework, not competence for your report. What to check on a consultant CV before you appoint, and what to ask for in writing.

Read article →
Permitted Development6 min read

Permitted development in a National Park: what still applies

National Parks are article 2(3) land, which removes several householder rights outright and tightens others. A class by class look at what is left.

Read article →
Costs, Fees and Budgeting6 min read

Budgeting for CIL and the exemption paperwork

The levy is arithmetic, the exemption is administration, and it is the administration that goes wrong. How to budget for both, including the surcharge risk.

Read article →
Templates, Checklists and Examples6 min read

Waste management strategy outline for a mixed-use block

The eight sections an operational waste strategy needs for a block with flats over commercial units, and what each one has to contain for the case officer.

Read article →
Project Type Guides6 min read

Expanding a poultry unit: the evidence you will need

Why most poultry expansions need a full application rather than a prior notification, and what the ammonia, odour, manure and traffic evidence has to show.

Read article →
Which Reports Do I Need7 min read

Reports for a scheme with a private water supply

What a planning application has to show when the dwelling will be served by a borehole, spring or shared supply, and how the foul drainage evidence fits alongside it.

Read article →
Report Deep Dives7 min read

Waste storage calculations in a waste management strategy

The bin store sum that planning officers actually check, from generation rates and container volumes to drag distance, vehicle access and the drawings the strategy must cross-refer to.

Read article →
Report Deep Dives6 min read

Evidence for a retail sequential test that survives scrutiny

A sequential test is a documentary audit before it is an argument. Here is how to agree the catchment, show flexibility, and record why each site was discounted.

Read article →
Which Reports Do I Need6 min read

Documents for a scheme affecting a public right of way

A path on the definitive map needs its own legal order before you build across it. Here are the two document bundles, the tests each one meets, and the timescales.

Read article →
Report Deep Dives6 min read

Sound insulation content for flats above a licensed premises

Measure the pub on its noisiest lawful night, not a quiet one. Here is what the acoustic report must contain, from spectral source data to verification testing.

Read article →
Project Type Guides6 min read

Consent for an illuminated shopfront sign

Signs run under their own regulations with only two tests. Here is when express consent is needed, what to submit for an illuminated display, and what enforcement looks like.

Read article →
Report Deep Dives6 min read

A Travel Plan a monitoring officer can enforce

Promises to encourage sustainable travel cannot be monitored. Here is how to set baselines, targets, survey methods and remedial measures that an obligation can actually secure.

Read article →
Which Reports Do I Need6 min read

Documents for a scheme in a nutrient neutrality catchment

In an affected catchment, permission waits on an appropriate assessment. Here is the evidence base that supports it, how credits work, and where a scheme cannot proceed.

Read article →
Neighbours, Objections and Community6 min read

Highways objections a neighbour can actually evidence

Highway objections fail when they describe inconvenience. These are the points councils can act on, and the evidence a resident can gather to support them.

Read article →
Use Classes and Change of Use6 min read

Light industrial and office uses inside Class E(g)

Offices, laboratories and light industry share one sub class with free movement between them. The amenity test in E(g)(iii) is where occupiers come unstuck.

Read article →
Professionals and Qualifications6 min read

Professional indemnity insurance to require from a consultant

The policy that responds is the one in force when the claim is notified, not when the report was written. Here is what to specify and what to read on the certificate.

Read article →
Permitted Development6 min read

Permitted development alongside a live planning permission

A live permission does not switch off permitted development, and using permitted development does not invalidate the permission. The limits are conditions and physical impossibility.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope