Articles – page 220

9215 articles
Professionals and Qualifications6 min read

Chartered town planner or planning agent: what changes

Planning is not a closed profession, so the choice between a chartered town planner and an unqualified agent comes down to the case. Drawings-led householder work rarely needs chartered judgement. Green Belt, listing and appeals do.

Read article →
Fire, Structural and Basements7 min read

Electric vehicle charging in enclosed car parks

Parking policy fixes how many charge points a basement needs. Fire engineering decides where they sit, how the level is ventilated and who manages the installation. Both belong on the planning drawings.

Read article →
Energy, Sustainability and Carbon7 min read

Combined heat and power and the air quality objection

The carbon argument for gas combined heat and power has narrowed as the grid decarbonised, while the local nitrogen dioxide argument has not moved. An energy statement has to face that rather than bury it.

Read article →
Data Tools How-To6 min read

Checking strategic noise maps before you fix a layout

Defra's strategic noise mapping under the Environmental Noise (England) Regulations 2006 is a free layout screening tool. It is modelled, averaged and four metres up, so it guides where bedrooms go and never replaces a measured survey.

Read article →
Comparisons7 min read

Fire statement or fire safety strategy: which you need

The fire statement is a planning validation document consulted on with the Health and Safety Executive. The fire safety strategy is the engineering document behind Gateways Two and Three. Most residential blocks need both.

Read article →
Data Tools How-To6 min read

Searching decision data across several authorities

Comparable decisions are assembled, not found. Here is a search method that returns officer reports you can cite, and a record you can still use months later.

Read article →
Comparisons6 min read

Section 73 against section 96A: changing an approved scheme

One route creates a fresh permission with conditions that must be read line by line. The other changes the existing permission with no consultation at all.

Read article →
Costs, Fees and Budgeting7 min read

Section 278 and section 38 highway costs explained

The figure people budget is the construction cost. The figure they pay adds design checks, audits, bonds, commuted sums and months of agreement time.

Read article →
Data Tools How-To6 min read

Reading a council's housing land supply monitoring

Most of the argument about housing land supply sits in the assumptions, not the total. Here is how to test a published schedule site by site.

Read article →
Costs, Fees and Budgeting6 min read

Why ecology survey costs vary so much between quotes

Three ecologists, three very different figures, and none of them wrong. The gap is in the assumptions about what the site will turn out to contain.

Read article →
Planning Law Updates6 min read

Local plan making reform: gateways and timetables

The Levelling-up and Regeneration Act reshapes plan preparation, but much of it depends on regulations. Here is how to work out which system a plan sits in.

Read article →
Neighbours, Objections and Community7 min read

Non-material amendments and why nobody consults you

A permission can be changed after approval without any neighbour being told. Here is what section 96A allows, where the amendments appear and what you can do.

Read article →
AI and Planning6 min read

Keeping a drafted document consistent with the drawings

Most validation queries on sound applications come from documents and drawings saying different things. Here is a fixed routine that catches them before submission.

Read article →
Permitted Development6 min read

Using a permitted development fall-back in an application

Comparing your scheme against what could lawfully be built without permission is a strong argument when it is evidenced, and an empty one when it is asserted.

Read article →
Professionals and Qualifications6 min read

Who should prepare a Transport Assessment and why it matters

A Transport Assessment rests on assumptions an officer cannot check without redoing the work, so the author's credibility does real work. Here is what to ask at appointment.

Read article →
Fire, Structural and Basements7 min read

Basement car park ventilation and smoke control

Ventilation for a basement car park is a building regulations subject until you decide where the air goes. Then it becomes noise, air quality and street scene.

Read article →
Energy, Sustainability and Carbon7 min read

Biosolar roofs: energy, drainage and biodiversity together

Panels, substrate and attenuation compete for the same depth, the same structural allowance and the same access. Here is how the three requirements are reconciled.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight for a single storey rear extension on a bungalow

A low extension can still fail a daylight test when the neighbouring window is at the same level. Here is the section check to run before the drawings are finished.

Read article →
Data Tools How-To6 min read

Using definitive map data for public rights of way

Planning permission does not authorise building across a recorded footpath. Here is how to read the definitive map and statement, and which order route applies.

Read article →
Costs, Fees and Budgeting6 min read

Section 106 costs beyond the contribution itself

The contributions are the number everyone budgets for. Legal fees, monitoring charges, mortgagee consents and indexation are the ones that arrive later.

Read article →
Planning Law Updates6 min read

Retained EU law and what changed for environmental assessment

Assimilated law renamed the regime without rewriting it. Here is what actually changed for EIA and habitats assessment, and how to cite directive-derived law now.

Read article →
Neighbours, Objections and Community6 min read

Enforcement time limits and what they mean for neighbours

England moved to a single ten year enforcement limit for breaches occurring on or after 25 April 2024. Here is how the transition works and what a neighbour can still do.

Read article →
AI and Planning7 min read

Reviewing a drafted transport statement before submission

A transport statement lives or dies on a handful of assumptions. Here is the order to check them in, and the point at which a transport planner has to take the work on.

Read article →
Permitted Development6 min read

Temporary use of land for 28 days under Class B

Class B of Part 4 allows 28 days of temporary use a year, but only 14 for markets, and none at all within the curtilage of a building. Here is how the count really works.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope