PlanScope Blog – Page 222
Practical guides to UK planning applications: which reports your council expects, permitted development, constraints, costs and how to prepare each document.
Articles – page 222
9211 articlesUnattended noise monitoring: duration, position, validity
An unattended noise survey succeeds or fails on duration, microphone position and how honestly you handle weather-affected data. The practical rules, and what belongs in the appendix.
How to build a site constraints plan from open data
A constraints plan is evidence only if every polygon traces back to a publisher and a date. How to choose layers, dimension distances and keep interpretation out of the drawing.
The real cost of an invalid planning application
Validation is an administrative gate, and failing it costs programme rather than money. What officers check, how the two-year local list rule works, and how to dispute an unreasonable requirement.
Georeferencing a scanned policies map for design work
A scanned policies map is a picture, not a measurable drawing. Georeferencing makes it usable, and the accuracy you achieve has to be stated rather than implied.
CIL instalment policies and the cost of missing a date
Instalment policies are local, not national, and the right to use one is fragile. One late payment collapses the schedule into a single immediate debt.
Chimney heights, biomass boilers and the Clean Air Act
Section 14 approval is a consent in its own right, with its own thresholds and its own deadline. Getting planning permission for a stack that is too short is a common and expensive mistake.
Screening a site for EIA using public datasets
In a sensitive area the Schedule 2 thresholds fall away entirely, so the first job in any screening exercise is a dataset check rather than a floorspace calculation.
Reading a CIL liability notice and paying on time
The levy is procedural. Most of the money people lose to it is lost to a missed form rather than to the charging rate itself.
Reading a statutory instrument that amends the GPDO
An amending order is a set of editing instructions, not a readable rule. The skill is applying it to the principal order and knowing which version governs your case.
Reading an officer report before the meeting
The committee report is the case the officer is putting. Read it properly and you can see exactly which part of your objection has landed and which part has not.
Small practice economics of AI assisted drafting
Narrative planning documents are usually unbilled time in a small practice. Working out which of them can start as a draft, and which cannot, is a fee structure decision.
Does a section 73 application need a new fire statement
A section 73 grant is a new planning permission, and article 9A attaches to applications for planning permission. That makes the starting point yes, with sensible exceptions.
Daylight to hotel and care home bedrooms
BRE guidance covers non-domestic buildings where occupants have a reasonable expectation of daylight. For a care home that points at the lounge as much as the bedroom.
Ground source heat pumps and borehole permitting
A closed loop array and an open loop borehole face very different regulation. One may need nothing from the Environment Agency; the other needs a licence and a permit.
Air quality assessment for a drive-through unit
Standard road traffic modelling assumes vehicles are moving. A drive-through queue is not, which is why these assessments need a different source term and a careful receptor list.
Checking registered parks, gardens and battlefields
Registration brings no separate consent regime, which is why it gets missed. It does make the asset a designated heritage asset, with consultation duties attached.
Planning Performance Agreements and when they pay
A planning performance agreement is a project management contract with the council, priced on officer time. It buys a timetable and named resources, not a recommendation.
Householder appeal or the fast track commercial route
The householder and minor commercial appeal services trade flexibility for speed. Eligibility is decided by what you applied for, not by what the building is used for.
Transitional provisions and which rules apply to you
A planning reform almost never applies to everything at once. The answer to which version applies is usually sitting in a commencement order most people never open.
Asking a councillor to call an application in
Most planning applications are decided by officers under delegated powers. A ward councillor can usually refer one to committee, but only within a deadline and only on planning grounds.
Where automated report recommendations come from
Automated report recommendations come from project description, detected constraints and a set of numeric thresholds. Useful for scoping, never a substitute for the authority's validation list.
Phased applications and the Gateway One duty
The article 9A duty attaches to applications for planning permission, which puts it at outline stage on a phased scheme. Reserved matters sit differently, and that is where most confusion starts.
Roof terraces and neighbour privacy in flatted schemes
An open terrace is judged differently from a window because the view is sustained, outdoors and downward. Screens, setbacks and sightline sections are what carry the case.
Energy evidence for a barn or outbuilding conversion
A barn conversion is a material change of use, so Part L applies in its conversion form rather than its new-build form. Traditional construction changes the target again.
Not sure which documents your council will ask for?
Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.
Enter your postcode on PlanScope