Articles – page 241

9177 articles
Data Tools How-To7 min read

Reading an adopted policies map for a site

The adopted policies map shows where local plan policies apply. Find the current version, record each designation, then cross-check the national flood and habitat datasets.

Read article →
Commercial Occupiers7 min read

Community cafes and social enterprises: the use class question

A community cafe open to the public usually sits in Class E, not F2. The distinction decides whether you need permission and whether a protection policy applies.

Read article →
Refusals and Appeals7 min read

Reopening a viability appraisal at appeal

Two appraisals, one model, and a gap concentrated in three lines. What decides a viability appeal, from benchmark land value to the review mechanism you should offer.

Read article →
Report Deep Dives7 min read

Habitat management and monitoring in a gain plan

The 30 year commitment in a biodiversity gain plan is where queries concentrate. Prescriptions by habitat, monitoring intervals, remedial triggers and how to cost it.

Read article →
Glossary6 min read

Curtilage: what it includes and where the line falls

Curtilage decides whether an outbuilding is permitted development and whether a barn is protected as part of a listed building. It is a question of fact and degree.

Read article →
Refusals and Appeals6 min read

Partial refusals and appealing one element of a scheme

There is no mechanism to appeal one reason for refusal. Severability of the proposal, narrowing the issues and the risk that an inspector raises a point nobody argued.

Read article →
Glossary7 min read

Visibility splay: x-distance, y-distance and land control

The y-distance follows measured traffic speed, not the posted limit. How a splay is constructed, who has to control the land and what counts as an obstruction.

Read article →
Planning Law Updates7 min read

Heat pumps under Class G permitted development

Class G of Part 14 permits a domestic air source heat pump subject to conditions on equipment, siting, size and use. Miss one and the whole class falls away.

Read article →
Professionals and Qualifications7 min read

Heritage consultants: what to look for before instructing

A heritage statement stands or falls on the assessment of significance. How to check accreditation, experience with your asset type and what to review before submission.

Read article →
Transport, Highways and Parking7 min read

Disabled parking provision and the route to the entrance

Schemes lose on the route rather than the bay count. Dimensions, transfer and safety zones, ratios by land use, and the gradients and surfaces that decide usability.

Read article →
Viability, Obligations and Commercial7 min read

Nutrient neutrality credits and the section 106

In an affected catchment the authority cannot grant permission without secured mitigation. How the budget is calculated, where credits come from and what the agreement has to do.

Read article →
Energy, Sustainability and Carbon7 min read

Energy metering and the be seen reporting stage

In-use energy reporting depends entirely on the metering fixed at design stage. What the three reporting points require and how to make the obligation deliverable.

Read article →
Commercial Occupiers7 min read

Micro-pubs in former shop units: the planning route

Drinking establishments sit outside the use classes, so a shop to micro-pub change always needs permission. Customer noise, smoking areas and deliveries decide it.

Read article →
Data Tools How-To7 min read

Finding the Local Nature Recovery Strategy habitat map

The local habitat map decides the strategic significance multiplier in your biodiversity metric. How to find the right strategy, read it properly and record the version.

Read article →
Comparisons7 min read

Structural survey or basement impact assessment

A structural survey answers what the existing building can take. A basement impact assessment answers what the excavation will do to the ground, the water and next door.

Read article →
Refusals and Appeals7 min read

Reapplying after a highway safety refusal

A refusal on highway safety has to show an unacceptable impact, not a severe one. Beat it with a topographical survey, a speed survey and a written withdrawal of the objection.

Read article →
Glossary6 min read

Deemed discharge of planning conditions

Section 74A lets an applicant serve notice and treat certain conditions as discharged when the council does not determine the details. The exclusions are wide and the risk shifts to you.

Read article →
Planning Law Updates7 min read

Grey belt: how Green Belt policy was reframed

Grey belt covers previously developed Green Belt land and land that does not strongly contribute to three of the five Green Belt purposes. The definition, the sequence and the golden rules.

Read article →
Professionals and Qualifications7 min read

Contaminated land: the suitably qualified person test

The phrase suitably qualified and experienced person decides whether a contamination report is accepted. What competence looks like at each stage, and what a council asks to see.

Read article →
Transport, Highways and Parking8 min read

Rural accesses: hedgerows, sight lines and land control

A field access refused on visibility usually has three problems at once: the splay length, who owns the frontage it crosses, and the protected hedgerow in the way.

Read article →
Viability, Obligations and Commercial7 min read

Section 278, section 38 and section 106: which secures what

Three agreements with three statutory bases. What each one secures, the bonds and commuted sums behind them, and how to stop the same junction being paid for twice.

Read article →
Energy, Sustainability and Carbon7 min read

Renewable heat in a conservation area: what is possible

A heat pump at a house in a conservation area is usually permitted development if it avoids highway-facing walls and roofs. Listed buildings and article 4 directions change the answer.

Read article →
Commercial Occupiers7 min read

Escape rooms and experience venues in retail units

An escape room usually falls within Class E as indoor recreation, so no planning permission is needed. The fire strategy, existing conditions and party wall noise are the real constraints.

Read article →
Data Tools How-To7 min read

Using aerial and street level imagery as planning evidence

Publicly available imagery settles footprints, boundaries and street character, and proves very little about continuity of use. Record the capture date and build the argument around it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope