Articles – page 258

9146 articles
Glossary6 min read

Fall-back position as a material consideration

A fall-back argument changes the comparison from proposal against empty site to proposal against the alternative. Here is the real prospect threshold and how to evidence it.

Read article →
Which Reports Do I Need6 min read

Which reports a self-build plot in a conservation area needs

A plot inside a conservation area needs four or five more documents than one outside it. Here is what designation adds and why the design evidence has to be drawn rather than described.

Read article →
Planning Law Updates6 min read

Written ministerial statements and the weight they carry

Written ministerial statements are not legislation and not part of the development plan, yet they can state national policy. Here is how to assess their weight and cite one properly.

Read article →
Seasonal Calendar6 min read

Building regulations transitional dates and starting on site

Building regulations transitional provisions turn on the building control notice and a real start on each individual building. Planning permission dates are irrelevant to them.

Read article →
Neighbours, Objections and Community6 min read

When plans are amended after you object

Amended drawings do not cancel your objection, but they may make it obsolete. Here is when a council must re-consult, what to compare and how to write a supplementary representation.

Read article →
Constraints and Designations6 min read

National Landscapes: what changed beyond the name

The rename from Area of Outstanding Natural Beauty changed no boundary and no statute. The strengthened section 85 duty did change how applications have to be argued.

Read article →
Use Classes and Change of Use7 min read

Light industrial under E(g)(iii) and the amenity test

The light industrial limb of Class E carries an amenity qualification the other limbs do not. A process that fails it is not in Class E at all, whatever the lease calls it.

Read article →
Permitted Development6 min read

Agricultural prior notification on holdings of five hectares

Part 6 Class A applies only to agricultural units of five hectares or more. Here are the limits, the 28 day notification procedure and the buildings the right does not cover.

Read article →
Costs, Fees and Budgeting7 min read

Working out CIL liability from a charging schedule

The levy is arithmetic with four checkable inputs: the rate, the chargeable area, the deduction for existing lawful floorspace and the index figures. Here is how each one works.

Read article →
Templates, Checklists and Examples6 min read

Planning statement for a Green Belt householder extension

The Green Belt householder test is whether an extension is a disproportionate addition over and above the original building. Here is how to measure it and structure the statement.

Read article →
Project Type Guides6 min read

Planning permission for a residential mooring or houseboat

The boat is rarely the planning problem, the mooring is. How change of use, navigation authority consent, flood risk and services decide whether a residential mooring works.

Read article →
Which Reports Do I Need6 min read

Reports needed for a cemetery or burial ground extension

A cemetery extension stands or falls on groundwater risk. Here is the screening that comes first, the ground investigation that follows, and the rest of the document bundle a council expects.

Read article →
Planning Law Updates6 min read

The 2026 NPPF: reading the new policy-coded structure

The Framework published on 17 August 2026 uses policy-coded chapters instead of paragraph numbers. Here is how to convert older citations, label superseded numbering and keep a live project current.

Read article →
Seasonal Calendar7 min read

Biodiversity net gain dates and transitional cases

Whether a scheme carries the biodiversity gain condition turns on when the application was made, not when it was decided. The two commencement dates, the exemptions and the section 73 problem.

Read article →
Neighbours, Objections and Community7 min read

Objecting to a retrospective planning application

A retrospective application under section 73A is decided as though nothing had been built. Here is how to frame an objection around effects you can now record rather than predict.

Read article →
Constraints and Designations6 min read

Conservation areas: what the designation actually controls

Designation removes several permitted development rights, makes demolition of an unlisted building a matter for planning permission, protects trees through a six-week notice and engages the section 72 duty.

Read article →
Use Classes and Change of Use6 min read

Medical use in Class E and the practitioner residence exception

A clinic in a shop unit is a movement within Class E and needs no permission. A consulting room attached to the practitioner's own house is excluded from E(e) and has to be analysed from first principles.

Read article →
Permitted Development6 min read

Class R: flexible commercial use of a farm building

Class R of the GPDO lets farm buildings change to commercial use up to a cumulative 500 square metres. Here is what the right covers, when prior approval applies and how it interacts with Class Q.

Read article →
Costs, Fees and Budgeting6 min read

Budgeting biodiversity net gain: units, credits and monitoring

Biodiversity net gain is four commitments, not one: the metric work, the units themselves, the legal mechanism and thirty years of management. Here is how to budget each line.

Read article →
Templates, Checklists and Examples7 min read

Construction environmental management plan: a working outline

A construction environmental management plan turns a pre-commencement condition into site rules a contractor can follow. This outline covers dust, noise, water, waste, ecology and complaints.

Read article →
Project Type Guides7 min read

Traveller site planning applications: policy, need and evidence

A traveller site application is decided on the planning definition in Annex 1 of Planning Policy for Traveller Sites, the district's unmet pitch need and the criteria in the adopted plan. Here is how to evidence each one.

Read article →
Which Reports Do I Need7 min read

Mezzanine floors in shops: when planning permission is needed

Section 55(2A) of the Town and Country Planning Act 1990 makes a retail mezzanine development once it provides more than 200 square metres. Here is how the threshold is measured and what the application needs to cover.

Read article →
Project Type Guides7 min read

Setting up a mobile catering unit on private land

The planning question is about the land, not the vehicle. When a pitch becomes a material change of use, and the three separate consents a trader needs.

Read article →
Which Reports Do I Need7 min read

Reports needed for an intensive poultry unit

Two numbers shape a poultry unit application: bird places and the distance to the nearest designated habitat. Everything in the evidence base follows from them.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope