Articles – page 299

8989 articles
Energy, Sustainability and Carbon7 min read

Part O overheating: simplified method or dynamic modelling

Approved Document O offers two routes. The simplified method is quick but rigid on glazing and free area, and noise or security constraints on opening windows usually push a scheme to dynamic modelling.

Read article →
Trees and Arboriculture7 min read

Ash dieback on development sites and what to do

Ash dieback changes retention categories, felling consents and the biodiversity baseline at once. Treating it as a straightforward safety matter is how developers lose units and gain enforcement risk.

Read article →
Ecology, BNG and Protected Species8 min read

Bat roost types and how each changes mitigation design

The roost type recorded on your site decides the mitigation. A day roost behind a hanging tile and a maternity roost in a warm loft void lead to very different drawings.

Read article →
Trees and Arboriculture7 min read

Tree roots, drains and boundary walls

Roots do not break sound pipework. They find an open joint and grow towards the leak, which is why the survey images decide who pays for the repair.

Read article →
Ecology, BNG and Protected Species6 min read

Swift bricks, bat boxes and conditioning integrated features

A nest brick at 2.4 metres above a lit kitchen window will never be occupied. What to specify, where to put it and how to evidence installation.

Read article →
Commercial Occupiers7 min read

A micro-brewery taproom on an industrial estate

Brewing belongs on an industrial estate. The taproom is a separate use once it outgrows a tasting room, and customer noise at night is what decides it.

Read article →
Energy, Sustainability and Carbon6 min read

How a BREEAM rating is secured by planning condition

Two certification stages, a version-specific manual and mandatory minimum credits sit between a pre-assessment and a discharged condition. Where schemes come unstuck.

Read article →
Noise, Air, Odour and Light7 min read

Using council diffusion tube data in an assessment

Measured tube data arrives with four adjustments applied or waiting. Which ones, how to check them, and how to verify a dispersion model against them.

Read article →
Trees and Arboriculture6 min read

Overhanging branches and the right of abatement

Cutting overhanging branches is a common law right, not a favour your neighbour grants. What the limits are, and why a protected tree reverses the advice.

Read article →
Viability, Obligations and Commercial6 min read

Employment land assessment: evidencing need for new units

Four propositions decide an employment land case: demand exists, existing stock cannot meet it, allocations cannot either, and this site can.

Read article →
Ecology, BNG and Protected Species6 min read

Recreational disturbance zones, SANGs and mitigation payments

New homes bring dog walkers, and ground-nesting birds abandon nests. Why an ordinary scheme five kilometres from a heath needs land, a payment and an agreement.

Read article →
Commercial Occupiers7 min read

A pet grooming salon or day care in a shop unit

Grooming and day care are different planning problems in the same unit. Where the line sits, how barking is assessed, and the conditions to expect.

Read article →
AI and Planning7 min read

Briefing a drafting tool with your site constraints

A document drafted from thin inputs looks finished and says nothing specific. What to establish first, and the six checks to run on any draft that comes back.

Read article →
Energy, Sustainability and Carbon6 min read

Whole life carbon: what modules A to D actually cover

Upfront, embodied and whole life carbon are three different totals built from the same modules. Which is which, and the assumptions that move the answer most.

Read article →
Noise, Air, Odour and Light6 min read

When an Air Quality Management Area changes your application

An AQMA does not block development. It moves the burden of proof, and the harder question is usually what the air does to your residents, not the reverse.

Read article →
Trees and Arboriculture7 min read

Securing tree protection through conditions and bonds

A condition cannot lawfully require the payment of money, so a tree bond belongs in a section 106 and has to meet the statutory tests. What that means in practice.

Read article →
Viability, Obligations and Commercial7 min read

Estate regeneration viability and existing resident costs

A residual appraisal template does not carry decant, leaseholder buyback or statutory compensation. Those cost heads are what estate schemes turn on.

Read article →
Ecology, BNG and Protected Species7 min read

Invasive species on site: knotweed, balsam and schedule 9

Having knotweed is not an offence. Spreading it is, and so is moving contaminated soil as ordinary muck-away. The survey, treatment and disposal duties explained.

Read article →
Flood, Drainage and SuDS6 min read

Flood risk assessment for a change of use application

The walls stay where they are, but the people inside change. How vulnerability classification decides whether a conversion needs an assessment and an Exception Test.

Read article →
Commercial Occupiers7 min read

A soft play centre in a large retail unit

The use class is rarely the obstacle. An old condition restricting the unit to retail, plus the sequential test for a main town centre use, usually is.

Read article →
AI and Planning6 min read

Why a drafted report cannot replace a bat survey

Software can draft the report around survey evidence. It cannot produce the evidence, and a permission granted without it can authorise a criminal offence.

Read article →
Energy, Sustainability and Carbon6 min read

What Part L 2021 changed for a planning energy statement

Emissions, primary energy and fabric efficiency all have targets now. What the 2021 uplift changed, and the double counting that officers look for first.

Read article →
Noise, Air, Odour and Light7 min read

Odour from sewage treatment and the IAQM approach

A scheme next to a treatment works can be well designed and still fail. How the IAQM framework builds an effect descriptor, and why mitigation at the houses is weak.

Read article →
Trees and Arboriculture7 min read

Trees with bat roost potential on development sites

A sound, unprotected tree can still stop a scheme for four months because of a lifted bark flake. What roost potential means and how the assessment route works.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope