Articles – page 8

8407 articles
Daylight, Sunlight and Amenity7 min read

Sunlight to gardens in a back-land terrace scheme

Orientation decides most back land schemes. The equinox shadow geometry, why the existing boundary condition is your best evidence, and when single storey is the only answer.

Read article →
Wales, Scotland and Northern Ireland7 min read

Wales: phosphate limits on rivers and what they stop

Where a Welsh site drains to a river SAC failing its phosphorus targets, the authority cannot conclude there is no adverse effect. The drainage routes that let a scheme proceed.

Read article →
Energy, Sustainability and Carbon8 min read

Energy statements for a major refurbishment

A refurbishment energy statement has a real baseline and a constrained set of measures. How to establish both, and how to set up the demolition comparator honestly.

Read article →
Trees and Arboriculture7 min read

Trees protected by a planning condition, not an Order

Felling a tree under a Tree Preservation Order is an offence. Felling one a condition required you to keep is a breach that can put the whole development outside its permission.

Read article →
Transport, Highways and Parking7 min read

Mobility hubs and shared transport secured by condition

A condition can require the bays and the power supply. It cannot fund an operator or make a car club viable. How to split the commitment so the scheme survives withdrawal.

Read article →
Householder Extensions and Conversions8 min read

Hip to gable loft conversions and the 50 cubic metre limit

Class B allows 40 cubic metres on a terrace house and 50 otherwise, measured against the original roof. Filling one hip end takes a large share of it.

Read article →
AI and Planning7 min read

Can an AI-drafted planning statement be submitted as is

The drafting method does not shift responsibility. Whoever signs the application form owns every fact in the pack, and the ownership certificate carries criminal liability.

Read article →
Fire, Structural and Basements8 min read

Retaining an existing frame: the retrofit appraisal

Where a plan expects reuse before demolition, the appraisal has to quantify capacity, condition and adaptability, and use the same assumptions as the carbon assessment.

Read article →
Daylight, Sunlight and Amenity7 min read

Window mapping: which neighbouring rooms actually count

Before any vertical sky component is calculated, someone decides which rooms are assessed. How that mapping is done, sourced and recorded so it survives scrutiny.

Read article →
Energy, Sustainability and Carbon8 min read

The energy hierarchy applied to a single self-build

One house does not need a major scheme's carbon modelling. What the local validation list actually asks for, and how to answer it in two or three pages.

Read article →
Noise, Air, Odour and Light7 min read

Statutory nuisance and why permission is no defence

Part III of the Environmental Protection Act 1990 contains no defence of holding planning permission. How abatement notices work, and what best practicable means requires of an operator.

Read article →
Trees and Arboriculture8 min read

Development under a canopy and future pressure to fell

The future pressure to fell argument refuses layouts where dwellings sit too close to retained trees. What the shading evidence has to show and how separation is designed in.

Read article →
Transport, Highways and Parking7 min read

Network Rail consultation where a crossing is affected

Where a scheme adds movements across a level crossing, the rail operator's risk assessment governs the outcome rather than highway capacity. What the evidence has to show.

Read article →
Wales, Scotland and Northern Ireland7 min read

Wales: the section 6 biodiversity duty on applications

Wales has no statutory biodiversity metric. Instead, section 6 of the Environment (Wales) Act 2016 and the step-wise approach in Planning Policy Wales require an officer to judge whether your scheme delivers a net benefit.

Read article →
Householder Extensions and Conversions7 min read

Wrap-around extensions and the two storey element

A side return joined to a rear projection is tested against the side and rear limits of Class A at the same time, and usually fails both. What that means for the application.

Read article →
Trees and Arboriculture7 min read

Tree-lined streets and what new layouts must show

Drawing green circles on a layout does not create rooting volume. What a tree-lined street needs in section, and which constraints delete trees after permission.

Read article →
Transport, Highways and Parking6 min read

Section 59 claims for extraordinary traffic damage

A section 59 claim arrives after the road has been resurfaced, by which point the only useful evidence is the baseline survey nobody took.

Read article →
Wales, Scotland and Northern Ireland6 min read

Wales: Future Wales and the development plan hierarchy

Future Wales sits inside the statutory development plan rather than above it, and conflict between tiers is resolved by hierarchy rather than by date.

Read article →
Flood, Drainage and SuDS6 min read

Water supply capacity: what a developer must evidence

Four documents carry the water supply case, none of which the applicant can write. Why the enquiry belongs alongside transport and drainage scoping, not at drafting stage.

Read article →
Glossary6 min read

Prior approval: the application that is not quite one

The permission already exists. A prior approval application only determines the matters the class lists, which is both the attraction of the route and its main trap.

Read article →
AI and Planning6 min read

Why an AI draft flags a missing site fact

A plausible invented floor level is worse than a blank, because nobody checks it. How to read the flags in a draft as a scope document for the application.

Read article →
Fire, Structural and Basements7 min read

Basement under a protected tree: roots and consent

Cellular confinement spreads load above undisturbed roots and does nothing for an excavation. What actually decides whether a basement under a protected tree is possible.

Read article →
Daylight, Sunlight and Amenity7 min read

Daylight modelling inputs that get challenged

The argument in daylight review is almost never about the test. It is about reflectance, geometry, room use assumptions and the baseline that was run.

Read article →
Energy, Sustainability and Carbon6 min read

Renewable energy requirements on employment units

A renewables percentage applied to a shell and core warehouse depends entirely on what it is measured against. How to settle the definition and draft a condition that can be complied with.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope