Articles – page 98

9470 articles
Permitted Development7 min read

Reverting to a previous use after a permitted change

Part 3 grants a right to change use. It does not generally grant a right to change back. Ask the question before you implement the change, not after the tenant leaves.

Read article →
Professionals and Qualifications6 min read

EIA competent experts and who coordinates the statement

Regulation 18 puts the duty on the applicant: competent experts, with their expertise set out. Competence has to be demonstrated on the face of the submission.

Read article →
Templates, Checklists and Examples7 min read

Transport statement outline for a change of use

A change of use transport statement is an argument about a difference. Establish the lawful existing use, the proposed use, subtract, then deal with the consequences.

Read article →
Costs, Fees and Budgeting7 min read

Phasing consultant spend across a planning programme

Money is rarely wasted on the wrong consultants. It is wasted on the right consultants appointed in the wrong order, so that bad news arrives after the design is paid for.

Read article →
Project Type Guides7 min read

A new vehicular access across a public right of way

A right of way across your plot survives the grant of planning permission. Either design a lawful crossing or obtain an order, and programme the groundworks around confirmation.

Read article →
Which Reports Do I Need7 min read

Mezzanine in a warehouse: which planning documents apply

Most warehouse mezzanines are internal works and need no permission. The exceptions are retail buildings over a statutory threshold, hidden changes of use and restrictive conditions.

Read article →
Fire, Structural and Basements7 min read

Fire appliance access on a cul-de-sac housing layout

Fire access is decided by the road layout, long before building control consults the fire service. On a cul-de-sac the turning head and the hose run are where schemes fail.

Read article →
Daylight, Sunlight and Amenity7 min read

Average daylight factor and target illuminance compared

One method measures a percentage of overcast sky light with no regard to orientation. The other simulates real lux across a real year. A scheme can pass one and fail the other.

Read article →
Flood, Drainage and SuDS7 min read

Reservoir inundation mapping in planning decisions

A site can be in Flood Zone 1 and in a reservoir inundation area at the same time. The sequential test does not apply, but the residual risk still has to be addressed.

Read article →
Constraints and Designations7 min read

Development beside the railway and what the operator asks

Planning permission does not give you the right to work near a railway. Fencing, drainage, piling and oversail are settled by the infrastructure owner, and that process runs on its own timetable.

Read article →
Permitted Development8 min read

Curtilage of a listed building and the rights you lose

If your house is listed, the garden wall and the old coach house may be listed too. The 1948 test decides it, and unauthorised works are a criminal offence with no immunity period.

Read article →
Professionals and Qualifications7 min read

Transport planners: database access and signed outputs

Trip rate disputes are rarely about arithmetic. They are about which surveyed sites were selected and whether the officer can rerun the query. That is why database access matters.

Read article →
Templates, Checklists and Examples7 min read

A viability appraisal input schedule a reviewer can test

Viability arguments are almost never about the arithmetic. They are about fifteen inputs, their evidence and their base dates. Set those out separately and the negotiation gets shorter.

Read article →
Costs, Fees and Budgeting7 min read

Appraising a site before you pay for any planning reports

Most sites that fail do so because of something visible on a free public map. Here is the order to check them in, and the findings that should stop a purchase outright.

Read article →
Project Type Guides7 min read

Dog grooming from home: when planning permission applies

A grooming table in a utility room rarely needs permission. A converted garage with three dryers and fifteen bookings a day usually does. The line is the material change of use test.

Read article →
Which Reports Do I Need8 min read

Car park redevelopment documents for a housing scheme

Redeveloping an operational car park for homes turns on two risks: the parking you are removing and the contamination the tarmac has been hiding. Here is how to scope the evidence.

Read article →
Costs, Fees and Budgeting7 min read

Monitoring and maintenance liabilities after consent

A permission can create obligations running five years on travel plans, thirty on biodiversity and indefinitely on common areas. They carry fees, and they survive the sale of the site.

Read article →
Project Type Guides7 min read

A rural estate biomass boiler house and fuel store

The plant is rarely the problem. The chimney height set by dispersion, and the heat main trench through parkland trees and buried archaeology, are what these applications turn on.

Read article →
Which Reports Do I Need6 min read

Document bundle for an electric vehicle charging hub

A charging hub is a small building operation with a large electrical installation, and the installation shapes the application: connection evidence, substation space, lighting and transformer noise.

Read article →
Which Reports Do I Need7 min read

Documents for a telecoms mast under Part 16

The Order requires only a description, a location plan and the fee. Everything else you submit exists to make the chosen position and design defensible on siting and appearance.

Read article →
Flood, Drainage and SuDS7 min read

Depth and velocity hazard and safe access routes

Depth alone says little about safety. The hazard rating combines depth, velocity and debris, and it is what decides whether an access route out of a development is acceptable.

Read article →
Constraints and Designations7 min read

Major accident hazard pipelines and consultation distances

A major accident hazard pipeline brings consultation zones, an operator easement and restrictions on building, excavating and planting. Design around it before the layout is fixed.

Read article →
Permitted Development7 min read

Part 16 telecoms apparatus and the prior approval route

Under Part 16 the permission comes from the Order, so the council can only consider siting and appearance. Objections about health or need cannot be acted on, however many arrive.

Read article →
Professionals and Qualifications7 min read

Archaeological contractors and the county archaeologist

Your contractor writes the written scheme of investigation; the council's archaeological adviser approves it. Keeping those two roles apart is what keeps archaeology off the critical path.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope