Fire, Structural and Basements7 min read

Tall building fire design and what planning controls

Gateway One asks for design intent, but the application locks in massing, core position and material palette. The six decisions that are far dearer to revisit after permission.

Read article →
Fire, Structural and Basements7 min read

Basement lightwells and neighbour amenity

A front lightwell on a house fronting a highway falls outside householder permitted development. What officers look at, and the four constraints that fix the size before design begins.

Read article →
Fire, Structural and Basements7 min read

Ground gas risk and protection measures in conditions

Ground gas conditions cost little to agree and a great deal to discharge late. The sequence from monitoring rounds to a verified protection system, and the four programming failures that cause delay.

Read article →
Fire, Structural and Basements7 min read

Geotechnical assessment on a sloping site

Slope turns a bearing capacity question into a stability question. The investigation has to cover ground you are not building on, and the drainage strategy becomes a stability measure.

Read article →
Fire, Structural and Basements7 min read

Structural condition and the Class Q barn test

The rebuilding limitation in Class Q decides most barn conversion refusals. A structural appraisal must conclude that conversion is achievable, with every work item mapped to an operation the Order allows.

Read article →
Fire, Structural and Basements7 min read

Underpinning a neighbouring property: the consents needed

Strengthening a neighbour's foundations usually needs no planning permission. What it does need is a party wall notice with the method attached, building control approval, and compliance with any conditioned method statement.

Read article →
Fire, Structural and Basements6 min read

Party wall procedure against planning permission

Planning permission and a party wall award answer different questions, and neither covers the other. Permitted development work still triggers party wall notices, and excavation near a neighbour's footings catches most extensions.

Read article →
Fire, Structural and Basements7 min read

Writing a fire statement section by section

Article 9A of the Development Management Procedure Order requires a fire statement on the published form for relevant development. Here is what each part has to say and why statements get returned.

Read article →
Fire, Structural and Basements7 min read

Shoring a party wall during conversion works

Temporary support to a party wall is notifiable work under section 2 of the Party Wall etc. Act 1996. The notice periods, the award and the condition survey all sit outside planning, and they drive the programme.

Read article →
Fire, Structural and Basements8 min read

Fire access for sites served by a private drive

The 45 metre rule, a 3.7 metre clear width, a 3.1 metre gateway and a turning facility on any dead end over 20 metres. Check these before fixing the house position.

Read article →
Fire, Structural and Basements7 min read

Spoil removal from a basement dig and highway impact

A small residential basement generates hundreds of cubic metres of bulked clay and dozens of lorry movements. Put the calculation and the logistics in the application, not in a later condition.

Read article →
Fire, Structural and Basements7 min read

Balcony design and combustibility at planning stage

On a relevant building above the regulation 7 threshold, a balcony is a specified attachment. Timber decking, soffits and handrails all change, and so does the elevation.

Read article →
Fire, Structural and Basements7 min read

Refuse and cycle store fire separation in a block

Refuse stores must be separated by fire-resisting construction and kept out of protected stairways, while carrying distances pull them towards the entrance. Cycle stores now raise the same question.

Read article →
Fire, Structural and Basements7 min read

Evacuation provision for wheelchair users at planning stage

Evacuation lifts need a shaft, a protected lobby and a power route; refuges need clear floor area in the core. Both are fixed by the planning drawings, not by building control.

Read article →
Fire, Structural and Basements7 min read

Escape windows and their effect on elevations

Four numbers in Approved Document B set the minimum opening and maximum cill height. On a period elevation they conflict with sash proportions and with Part K guarding.

Read article →
Fire, Structural and Basements8 min read

Made ground and shallow foundations on a brownfield plot

On a small brownfield plot the depth and variability of the fill decide the foundation. Why differential settlement is the design driver, and how to brief one investigation for both ground and contamination.

Read article →
Fire, Structural and Basements7 min read

Removing internal walls in a conversion

Section 55(2)(a) puts internal works outside planning control, so the real controls are building regulations, listed building consent and party wall notice. What each one needs.

Read article →
Fire, Structural and Basements7 min read

Retaining walls and permitted development limits

The wall may be permitted development. The excavation behind it usually is not. How heights are measured, why sections decide these cases, and what the Party Wall Act adds.

Read article →
Fire, Structural and Basements6 min read

Basement pumped drainage and non return protection

A basement below the level of the public sewer needs a sump, a pump and protection against surcharge. What Approved Document H expects, and what the council and the sewerage undertaker each want to see.

Read article →
Fire, Structural and Basements8 min read

Gates, barriers and fire service access

Designing out crime and fire appliance access pull in opposite directions at a gated entrance. How to reconcile them on one drawing and keep it working after handover.

Read article →
Fire, Structural and Basements7 min read

Shoring and stability where a neighbour objects

A neighbour's fear of cracking is mostly a party wall matter, unless the development plan has a stability policy. What the council can control and what it cannot.

Read article →
Fire, Structural and Basements8 min read

Geotechnical investigation scope for a small site

A proportionate ground investigation answers six questions about a small site. How to specify the holes, the depths and the laboratory schedule before asking for a quotation.

Read article →
Fire, Structural and Basements8 min read

Facade retention schemes and their consent trail

Holding a facade in the air while the building behind it goes needs more than one consent. What each approval covers, how monitoring triggers are set, and what to submit.

Read article →
Fire, Structural and Basements7 min read

Temporary works in a construction management plan

Construction management plans usually cover lorries and wheel washing well and temporary works badly. These are the items that cause the disputes on a constrained urban site.

Read article →