Fire, Structural and Basements articles – page 6

335 articles
Fire, Structural and Basements7 min read

Mass timber and the constraints at planning stage

Structural material is usually a building control matter. With mass timber it arrives in the planning submission, through the fire statement, the external wall rules and the carbon case.

Read article →
Fire, Structural and Basements7 min read

Structural condition and the case against retention

Councils refuse demolition cases built on assertion rather than measurement. This sets out the condition evidence, the cost schedule and the independent scrutiny a structural argument has to survive.

Read article →
Fire, Structural and Basements7 min read

Tall building fire strategy at planning committee

Planning Gateway One brings a defined slice of fire safety into the planning decision. Drawing the boundary before the meeting is what keeps the decision and its conditions defensible.

Read article →
Fire, Structural and Basements7 min read

Basement light wells in conservation areas

The excavation is handled by other consents. The planning decision turns on a hole in a front garden, a set of railings and whether the street still reads as it did.

Read article →
Fire, Structural and Basements7 min read

Retaining existing structure: what an appraisal must establish

At planning stage a structural appraisal must establish whether the existing frame can carry the proposed scheme, at what cost and programme penalty. Condition alone answers nothing.

Read article →
Fire, Structural and Basements7 min read

Structural appraisal for converting an agricultural building

The permitted development right does not extend to new structural elements. How to assess frame, foundations and cladding separately, and where the appraisal kills the case.

Read article →
Fire, Structural and Basements7 min read

Fire statement or fire safety strategy: when each applies

The fire statement is a planning document required by article 9A of the DMPO 2015. The fire safety strategy proves Part B compliance later. How to run both without contradiction.

Read article →
Fire, Structural and Basements7 min read

Single stair buildings and the planning consequences

The second staircase requirement is a building regulations change with planning consequences: footprint, massing, unit mix and the route to amend a consent granted on a single core.

Read article →
Fire, Structural and Basements7 min read

Water supplies for firefighting and the evidence required

Fire authorities want hydrants in the right places and proof of the flow behind them. The requests take weeks, so they belong at feasibility rather than at pre-commencement.

Read article →
Fire, Structural and Basements7 min read

Structural warranties and what the planning file should hold

A self-build warranty makes the house mortgageable and can be the evidence that secures the levy self-build exemption. Here is the sequence and the records to keep.

Read article →
Fire, Structural and Basements7 min read

Basement light wells, escape and flood risk together

Escape wants a low cill, flood resilience wants a raised threshold, daylight wants a wide shallow well. Here is how to design a light well that satisfies all three.

Read article →
Fire, Structural and Basements7 min read

Mass timber schemes and the questions planners now ask

The carbon case is why schemes use engineered timber. The fire regulations, the height band and the insurance position decide whether the scheme reaches technical design.

Read article →
Fire, Structural and Basements7 min read

Structural limits on a terraced house loft conversion

Removing purlins and struts means new steels into the party walls, a new floor structure and a hard look at headroom under the ridge. Resolve the structure before fixing the planning drawings.

Read article →
Fire, Structural and Basements7 min read

Building over or near buried infrastructure

Planning permission does not authorise building over a sewer or a tunnel. How to find the assets, deal with each owner's protection regime, and sequence the consents.

Read article →
Fire, Structural and Basements7 min read

Piling methods beside sensitive neighbours

Piling method is a planning issue. How to predict noise and vibration to BS 5228, set trigger levels people will accept, and use section 61 prior consent to lock in hours and methods.

Read article →
Fire, Structural and Basements7 min read

Asbestos surveys before demolition and what conditions cover

Regulation 5 already requires an intrusive survey before demolition. A condition restating it fails the tests for planning conditions, while dust, hours and sequencing are fair game.

Read article →
Fire, Structural and Basements7 min read

Structural appraisal for new homes above a shop unit

Part 20 prior approval requires a chartered engineer to confirm the scheme is structurally safe. Everywhere else the appraisal protects your budget rather than the application.

Read article →
Fire, Structural and Basements7 min read

Dewatering a basement excavation and the consents needed

Pumping groundwater out of a basement dig engages three regulators at once. Only one of them sits inside the planning application, and the abstraction licence usually drives the programme.

Read article →
Fire, Structural and Basements7 min read

Which mixed use buildings need an Article 9A fire statement

The Article 9A duty depends on whether a podium scheme is one building or several, and on a height condition measured to the top storey of the whole building.

Read article →
Fire, Structural and Basements7 min read

Evacuation lifts and what they do to a core layout

Evacuation lifts cost core efficiency through the protected lobby rather than the shaft. Test the core before the planning drawings are fixed.

Read article →
Fire, Structural and Basements7 min read

External wall materials and the combustibles restriction

Regulation 7(2) bars combustible materials from external walls and specified attachments on relevant buildings, which can make a planning palette undeliverable.

Read article →
Fire, Structural and Basements7 min read

Retaining walls close to a highway boundary

Planning permission and section 167 approval are two different consents, and the highways one bites at a lower height than most self-builders expect. Here is what each covers and what the drawings must show.

Read article →
Fire, Structural and Basements7 min read

Settlement monitoring conditions on a basement permission

A settlement monitoring condition turns a predicted movement into a measured obligation. Here is what the scheme needs to contain, and how to discharge it at completion.

Read article →
Fire, Structural and Basements6 min read

Crane oversailing and land you do not control

Planning permission does not authorise a crane jib to cross a boundary. Here is where oversailing does engage the planning process, what a licence covers, and what to do when one cannot be obtained.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope