Glossary articles – page 12

485 articles
Glossary7 min read

Material change of use under section 55

A change of use needs planning permission only if it is material, and materiality turns on the character of the use rather than the occupier or the trading name.

Read article →
Glossary6 min read

Fall-back position as a material consideration

A fall-back argument changes the comparison from proposal against empty site to proposal against the alternative. Here is the real prospect threshold and how to evidence it.

Read article →
Glossary6 min read

Hazardous substances consent and HSE consultation zones

Consent under the Planning (Hazardous Substances) Act 1990 attaches to land, not to an operator. How consultation distances are drawn, what advice against means, and how to design around it.

Read article →
Glossary6 min read

Neighbourhood plans and the weight they carry

Neighbourhood plan weight changes on the day the plan is made. The basic conditions, the effect of section 38(5) on conflict with the local plan, and how to evidence Local Green Space.

Read article →
Glossary7 min read

Section 38(6) and the development plan in decisions

Section 38(6) of the Planning and Compulsory Purchase Act 2004 sets the order of every English planning decision. What the development plan includes, how conflicts are resolved and when material considerations displace it.

Read article →
Glossary6 min read

Material considerations and what the law allows

What makes a consideration material in planning law, the two-part test the courts apply, and why materiality and weight are different questions.

Read article →
Glossary6 min read

Curtilage in planning and listed building law

What curtilage means in planning, the factors that fix it, how curtilage listing works under section 1(5), and where a garden is not curtilage at all.

Read article →
Glossary6 min read

Swept path analysis: what highway officers expect to see

What a swept path drawing has to show, how to choose the design vehicle, and the errors that send vehicle tracking back from the highway authority.

Read article →
Glossary6 min read

Article 9A fire statements: when your application needs one

Article 9A of the DMPO 2015 requires a fire statement with planning applications involving relevant buildings, and triggers consultation with the Health and Safety Executive at Planning Gateway One.

Read article →
Glossary6 min read

Nutrient budget

A nutrient budget compares the nitrogen or phosphorus load from a scheme with the existing land use. A positive figure means mitigation before permission can be granted.

Read article →
Glossary6 min read

Planning contravention notice

A planning contravention notice is a demand for information about a suspected breach, not enforcement action. There is no appeal, but failing to reply within 21 days is an offence.

Read article →
Glossary6 min read

Aftercare condition

An aftercare condition is what follows restoration: specified steps over a five year period to bring the land to the standard for agriculture, forestry or amenity.

Read article →
Glossary6 min read

Biodiversity units explained

Units are not area. Two sites of the same size can differ by an order of magnitude, and the survey date alone can move a baseline enough to break a layout.

Read article →
Glossary8 min read

Settlement boundaries in local plans

Settlement boundaries separate the built-up area from open countryside in a local plan. Here is what the line does, how inspectors test it at examination, and what an edge-of-boundary case has to prove.

Read article →
Glossary6 min read

Habitats regulations assessment

The applicant can write it, but the local planning authority must adopt it. And mitigation belongs in appropriate assessment, not in screening.

Read article →
Glossary6 min read

Written ministerial statements in planning

Statements made to Parliament can change how applications are decided overnight, without a consultation and without touching the Framework text.

Read article →
Glossary6 min read

The duty to cooperate and why plans fail on it

Section 33A of the 2004 Act obliges authorities and prescribed bodies to engage constructively on strategic matters. Unlike soundness, a breach cannot be fixed by main modifications.

Read article →
Glossary6 min read

Holding directions in planning and what they stop

A holding direction under article 31 restricts the grant of permission, not the refusal. What it means for a scheme awaiting a call-in decision.

Read article →
Glossary6 min read

Non-determination and the deemed refusal appeal

A missed determination deadline creates a right of appeal under section 78, not a deemed refusal. When to use it, and why waiting is often faster.

Read article →
Glossary6 min read

Precedent in planning decisions and how to use it

A neighbour's approval does not bind the council, yet consistency is a material consideration an officer must address. How to present comparable cases properly.

Read article →
Glossary7 min read

Amenity in planning terms: what officers actually assess

Amenity is undefined in statute but decides more householder applications than anything else. What it covers, the conventions councils apply, and how to argue it.

Read article →
Glossary6 min read

Supplementary planning documents and the weight they carry

Supplementary planning documents are material considerations, not development plan policy. How to test whether one is elaborating a policy or inventing one.

Read article →
Glossary6 min read

Departure applications: publicity, referral and the case

Departures are not harder in law, only louder in procedure. What triggers the newspaper advertisement, when referral actually applies, and how to draft the balance.

Read article →
Glossary6 min read

Prematurity as a reason for refusing planning permission

Refusal on prematurity grounds is rare and hard to sustain. The two conditions in national policy, the plan stages that matter, and how to rebut the objection.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope