Glossary articles – page 13

484 articles
Glossary7 min read

Enurement and personal planning permissions explained

Section 75 makes planning permission run with the land, so a personal permission is the exception. When councils grant one, what the condition should say, and how to remove it.

Read article →
Glossary7 min read

Section 62A applications: applying direct to the Inspectorate

Where a council is designated as underperforming, section 62A allows an application to go straight to the Planning Inspectorate. The route is category specific and costs you the right of appeal.

Read article →
Glossary6 min read

Statement of common ground: what it agrees and what it cannot

A statement of common ground fixes the uncontested facts before an inquiry, hearing or local plan examination, so the inspector can concentrate on the two or three judgements that are really in dispute.

Read article →
Glossary6 min read

Certificate of immunity from listing

Five years of certainty that a building will not be listed. It leaves conservation area controls untouched, and applying can result in the building being listed.

Read article →
Glossary6 min read

Design code: what it fixes and what it leaves open

Design codes fix the parameters that decide whether a street works and leave internal layout and detailed expression open. Which parameters are usually coded, how much weight a code carries, and how to argue a departure.

Read article →
Glossary7 min read

Standard method: calculating local housing need

The standard method produces one minimum annual housing need figure per authority. How the baseline and affordability adjustment work, how need differs from the adopted requirement, and what a supply shortfall actually changes.

Read article →
Glossary8 min read

Deemed consent for advertisements: what it covers

Deemed consent grants advertisement consent automatically to whole classes of display under the 2007 Regulations. Here is what falls inside a class, what the standard conditions require, and when express consent is needed instead.

Read article →
Glossary6 min read

Severability: when part of a permission survives

Severability decides whether an unlawful condition can be removed without destroying the permission it sits on. The test turns on whether the condition is fundamental to what was granted.

Read article →
Glossary6 min read

Prior approval: what the council may and may not consider

Prior approval is not a planning application. The permission comes from the General Permitted Development Order, and the council may only consider the matters that class actually lists.

Read article →
Glossary7 min read

Ransom strip: the land that blocks access to a site

A ransom strip is a narrow parcel of land controlling access to a development site. Here is how strips arise, what planning permission does not give you, and the valuation principles applied when one is released.

Read article →
Glossary6 min read

Certificate of appropriate alternative development

A CAAD states what permission would have been granted on land being compulsorily acquired, had the scheme never existed. It fixes the planning assumptions behind the compensation figure.

Read article →
Glossary6 min read

Impact risk zone: the SSSI consultation trigger

Impact risk zones tell a council when to consult Natural England about a site of special scientific interest. The zone restricts nothing by itself, but it changes what your application needs to carry.

Read article →
Glossary7 min read

Development high risk area: coal mining legacy explained

Sites in a development high risk area need a coal mining risk assessment with the planning application. Here is what the designation records and what it changes on site.

Read article →
Glossary7 min read

Twin tracking: running two applications at once

Once an appeal is lodged on non-determination the council loses jurisdiction, so an applicant with one application must choose between appealing and negotiating. Twin tracking removes that choice, at a price.

Read article →
Glossary7 min read

Fallback position: using an existing lawful option

A fallback argument asks the decision maker to compare the proposal against what would lawfully happen instead. It is powerful on the right facts and fails whenever the alternative is asserted rather than evidenced.

Read article →
Glossary8 min read

Temporary stop notice: an immediate halt to works

Section 171E lets a council halt an activity the moment the notice is displayed, with no appeal to the Planning Inspectorate. What it can and cannot prohibit, where compensation arises, and how to respond.

Read article →
Glossary8 min read

Breach of condition notice: the no-appeal route

A breach of condition notice is served under section 187A of the Town and Country Planning Act 1990 and cannot be appealed to the Planning Inspectorate. Here is what it binds you to, the two statutory defences, and the routes that actually work.

Read article →
Glossary6 min read

Section 215 notice: untidy land and buildings

Section 215 of the Town and Country Planning Act 1990 lets a council require steps to remedy land that harms the amenity of the area, with no breach of planning control required.

Read article →
Glossary6 min read

Sensitive area: the EIA definition that removes thresholds

Sensitive area is defined in regulation 2(1) of the EIA Regulations 2017. If any part of a development sits inside one, the Schedule 2 thresholds stop applying and screening becomes unavoidable.

Read article →
Glossary7 min read

Scoping opinion: agreeing what the ES covers

A scoping opinion is the authority's written statement of what an Environmental Statement must assess. Requested under regulation 15, adopted in five weeks, and the least costly way to control an EIA evidence budget.

Read article →
Glossary6 min read

Habitat banks and buying off-site biodiversity units

Off-site units are a legal product, not a commodity. What you are buying is an entry on a register backed by a 30 year agreement, and the paperwork is the asset.

Read article →
Glossary6 min read

Strategic significance in the statutory biodiversity metric

Strategic significance rewards habitat in the right place. Claiming the high category without a strategy or plan designation behind it is the error reviewers see most.

Read article →
Glossary6 min read

Windfall sites: how councils count unplanned homes in supply

Windfall allowances quietly do a lot of work in housing land supply arguments. The Framework sets a demanding evidence test, and an inflated allowance is worth challenging.

Read article →
Glossary7 min read

Statutory undertakers and the rights that sit outside planning

Statutory undertakers are the utility and transport bodies that Parliament has authorised to build and maintain apparatus. Their rights can reshape your site programme before a planning application is even drafted.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope