Glossary articles – page 18

481 articles
Glossary6 min read

The retail impact test and the 2,500 square metre hurdle

Above the floorspace threshold, an out-of-centre proposal has to show it will not harm a defined centre. Here is what the test asks and how the arithmetic works.

Read article →
Glossary6 min read

Employment land safeguarding and what it stops you doing

Safeguarding policies resist the loss of employment floorspace and run on marketing evidence. Here are the tests, the Class MA gap, and the assessment that answers them.

Read article →
Glossary6 min read

Hot food takeaway: why it sits outside the use classes

Hot food for consumption off the premises is a use class of its own. Here is what that means for changing use, and the extraction, odour and health policy that decide the application.

Read article →
Glossary6 min read

Class E: what one use class now covers

Movements inside Class E are not development, so a shop can become a gym without permission. Here are the sub-classes, the uses that dropped out, and the conditions that still bite.

Read article →
Glossary6 min read

Change of use to C4: the HMO threshold explained

Three to six unrelated sharers is Class C4, seven or more is sui generis. Here is where the line comes from, how Class L works, and what councils ask for where an application is needed.

Read article →
Glossary6 min read

Article 4 direction: how permitted development is removed

Article 4 directions do not ban development, they remove the right to do it without permission. Here is how immediate and non-immediate directions work, and how to check whether one covers your property.

Read article →
Glossary7 min read

Curtilage listing: when your outbuilding is listed too

A barn, wall or coach house that has never been listed in its own right can still be protected. Here is how section 1(5) of the 1990 Act works, what the 1 July 1948 date fixes, and how to get a binding answer.

Read article →
Glossary7 min read

Established use and the certificate of lawfulness evidence

An established use is one the council can no longer act against. Proving it is a documentary exercise, and the burden of proof sits entirely with the applicant.

Read article →
Glossary7 min read

Agricultural units and the five hectare permitted line

Part 6 gives farmers permitted development rights, but only on an agricultural unit of the right size, and only for what is reasonably necessary for agriculture.

Read article →
Glossary7 min read

Agricultural occupancy condition and how to remove it

An agricultural occupancy condition limits who may live in a countryside dwelling. Removing it takes either a marketing exercise the council accepts or ten years of unchallenged breach.

Read article →
Glossary7 min read

Rural exception sites: affordable homes outside the boundary

A rural exception site allows affordable housing on land that would never be released for open market development, provided the local need is evidenced and the occupancy is tied for good.

Read article →
Glossary6 min read

Housing mix: how councils set unit size policy

Housing mix policy sets the bedroom split a council expects on your site. It comes from a housing needs assessment, and departing from it takes site-specific evidence rather than a preference.

Read article →
Glossary6 min read

Vacant building credit: the affordable housing offset

The vacant building credit deducts the floorspace of an existing vacant building from the affordable housing calculation. The fight is almost always about whether the building counts as vacant.

Read article →
Glossary7 min read

Residual land value: the arithmetic behind viability

Value of the finished scheme, less costs, less the developer's return, equals what the land can bear. The dispute is never about the formula, always about the inputs.

Read article →
Glossary6 min read

Fallback position in planning and the real prospect test

The fallback argument shifts the comparison from the existing situation to a lawful alternative. Its weight turns on whether that alternative has a real prospect of being implemented.

Read article →
Glossary6 min read

Enabling development: funding heritage repair with new build

Enabling development is an open departure from policy, granted to fund the repair of a heritage asset. It stands or falls on an evidenced conservation deficit and a quantum sized to it.

Read article →
Glossary6 min read

Non-designated heritage assets and the local list

Local listing creates no new consent requirement. It creates a balanced judgement on the scale of harm against the asset's significance, and that judgement turns on the evidence you supply.

Read article →
Glossary6 min read

Conservation area character appraisals and how officers use them

Heritage refusals in conservation areas almost always quote the council's character appraisal. Find your building on its map, read what the document says about character, and build the design case from its own words.

Read article →
Glossary6 min read

Design codes in planning: what they are and how binding

Design codes turn design policy into measurable parameters. Whether a code binds your application depends on how it was adopted, and on where your site sits on the coding plan.

Read article →
Glossary6 min read

Backland and tandem development explained

Backland and tandem schemes stand or fall on the drive past an existing house. Here is how officers assess disturbance, privacy and servicing.

Read article →
Glossary6 min read

Infill development: what counts as a genuine gap site

Whether your gap counts as infill is decided by the local plan and the settlement boundary. Here is how officers test plot width, spacing and access.

Read article →
Glossary6 min read

Amenity: the word councils use to refuse extensions

Amenity bundles privacy, outlook, daylight and disturbance into one refusal reason. Here is how councils test each strand and what evidence answers them.

Read article →
Glossary6 min read

Weight: how officers decide how much a policy carries

Weight is a planning judgement, not a rule. Here is how officers weigh adopted, emerging and supplementary policy, and what makes an objection count.

Read article →
Glossary6 min read

Gross value added: what GVA means in planning evidence

GVA is the headline number in most economic cases and the one officers trust least. Here is how to build it from sourced inputs and present it so it carries weight.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope