Glossary articles – page 2

479 articles
Glossary7 min read

Liability notice and demand notice under the levy

A levy liability notice sets the chargeable amount and a demand notice sets the payment dates. Here is what to check on each, how instalment policies work, and where the review and appeal routes lead.

Read article →
Glossary7 min read

Assumption of liability for the levy

Assuming liability on the levy's Form 2 fixes who the council will pursue for the Community Infrastructure Levy. It has to be done before work starts, and before any relief claim, or liability falls back on the landowners.

Read article →
Glossary7 min read

Heads of terms for a planning obligation

Heads of terms are the schedule members vote on and the solicitors draft from. Here is what belongs in them, how to set triggers and indices, and which omissions hold up the deed after resolution.

Read article →
Glossary7 min read

Section 70A and declining a repeat application

Section 70A of the Town and Country Planning Act 1990 lets a council decline to determine a similar application made within two years of a dismissed appeal or two refusals. Here are the conditions, the similarity test and what to change.

Read article →
Glossary6 min read

The enforcement warning notice and how to respond

The notice is an invitation to apply, not something to comply with, and it records the authority view that permission would probably be granted. How to use that.

Read article →
Glossary6 min read

Revocation or modification of a planning permission

Implementation defeats revocation, and compensation for depreciation in land value is why authorities rarely make these orders. The confirmation procedure, the objection route and the sequence to follow.

Read article →
Glossary7 min read

Tree replacement notice after unlawful removal

The duty to replace a protected tree runs with the land and applies even where felling was exempt. How the notice works, the 28 day appeal window, and the records that prevent the dispute.

Read article →
Glossary7 min read

Vacant building credit and affordable housing contributions

Where the credit applies, affordable housing is calculated on the uplift rather than the whole scheme. What counts as vacant, what counts as abandoned, and why a long vacancy can cost you the levy offset.

Read article →
Glossary7 min read

Established use and lawful use in planning explained

Immunity from enforcement is not the same as planning permission. What makes a use lawful, how the time limits now work in England, and the evidence a section 191 certificate application needs.

Read article →
Glossary7 min read

Openness of the Green Belt: spatial and visual

Openness is about the absence of built development, not visual amenity. The metrics that make an openness assessment persuasive, and the comparison traps in the Green Belt exceptions.

Read article →
Glossary7 min read

Primary shopping area: why the boundary matters

One line on the policies map decides whether a site is in centre, edge of centre or out of centre, and whether a sequential test and an impact assessment are needed.

Read article →
Glossary7 min read

Non-designated heritage asset: how weight is given

No statutory duty, no separate consent, but a policy test that weighs harm against significance. How local lists work, what evidence to produce and when recording is required.

Read article →
Glossary6 min read

Deliverable site: the housing land supply definition

Deliverable means available now, suitable now and achievable with a realistic prospect of delivery in five years. The glossary splits sites into two groups with very different evidential burdens.

Read article →
Glossary8 min read

Critical drainage area: what the designation changes

Critical drainage areas are notified by the Environment Agency and mapped by lead local flood authorities. Inside one, a Zone 1 infill plot needs the same drainage evidence as a riverside site.

Read article →
Glossary7 min read

Child yield: calculating play space requirements

Child yield turns a schedule of accommodation into an expected child population, then into square metres of playable space. Affordable family housing drives the number more than scheme size does.

Read article →
Glossary7 min read

Trip rate: where transport numbers come from

Every vehicle number in a transport assessment traces back to a trip rate taken from surveys of comparable sites. The selection of those sites, not the arithmetic, is where disputes happen.

Read article →
Glossary7 min read

Zone of theoretical visibility: setting a study area

A zone of theoretical visibility sets the study area for a landscape assessment. Because bare earth modelling ignores buildings and vegetation, it is a worst case rather than a finding.

Read article →
Glossary8 min read

Veteran tree: what makes a tree irreplaceable

Veteran status is judged from decay features rather than age, and it brings a buffer far larger than a BS 5837 root protection area. Here is how the classification is made and what it does to a rural layout.

Read article →
Glossary7 min read

Characteristic situation: classifying ground gas risk

Ground gas behaviour is driven by pressure, so a single dry day reading proves very little. The classification combines the worst concentration with the worst flow rate.

Read article →
Glossary6 min read

Total solar energy transmittance in glazing

Total solar energy transmittance is the single largest lever in an overheating model. What it measures, typical ranges, the daylight trade-off and how to write it into a submission.

Read article →
Glossary6 min read

Operative temperature in overheating assessment

Overheating criteria for homes are written in operative temperature, not air temperature. What the metric combines, how models report it and what a report must state.

Read article →
Glossary6 min read

Equivalent area in background ventilation

Approved Document F sizes background ventilators by equivalent area, a tested figure rather than a geometric one. Why acoustic units change the arithmetic and how to present a schedule.

Read article →
Glossary6 min read

Principal elevation and why it matters

Several householder permitted development rights switch off in front of the principal elevation. Here is how the technical guidance defines it, how to identify it on a corner plot, and how to confirm the position before building.

Read article →
Glossary7 min read

Flood hazard rating and what the numbers mean

Flood zones say how likely flooding is. The hazard rating says what the water would do to someone walking out through it, which is why access routes are judged on it.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope