Glossary articles – page 3

479 articles
Glossary7 min read

Source protection zone 1 and what it restricts

The inner source protection zone is a 50 day travel time to a drinking water abstraction. Inside it, infiltration drainage and several below-ground activities are resisted.

Read article →
Glossary7 min read

Veteran trees and their buffer zones

A veteran tree carries unusual value through its age, size or condition. Policy treats it as irreplaceable habitat, and the buffer is usually larger than a standard root protection area.

Read article →
Glossary7 min read

Rating level under BS 4142, explained for reviewers

The rating level is the specific sound level plus corrections for tonality, impulsivity and intermittency. How each part is derived, and what a reviewer should challenge in a plant noise assessment.

Read article →
Glossary7 min read

Volumetric run-off coefficient in drainage design

The coefficient converts rainfall depth into run-off volume, and volume is a different question from peak rate. Confusing the two produces a system that passes the discharge check and floods anyway.

Read article →
Glossary8 min read

The Whitley principle and unlawful implementation

Work carried out in breach of a true condition precedent is not carried out under the permission at all. The risk is not enforcement, it is a permission that was never lawfully begun and has since expired.

Read article →
Glossary7 min read

Pollutant linkage: what it means for contaminated land

Contaminated land decisions turn on whether a source, a pathway and a receptor are actually connected. Here is how that chain is tested, broken and verified in a planning application.

Read article →
Glossary7 min read

Upfront carbon in modules A1 to A5

Upfront carbon covers the product stage, transport to site and construction process, all emitted before occupation. What each module includes, which data counts, and why module D stays out of the total.

Read article →
Glossary6 min read

Fabric energy efficiency standard in an energy statement

The fabric energy efficiency standard measures space heating and cooling demand from the building shell alone. Here is how the Part L target is set, which design moves shift it, and what an energy statement should report.

Read article →
Glossary8 min read

Overheating criteria under CIBSE TM59

TM59 has two criteria and both must pass. The bedroom test of 26 degrees for no more than 32 hours is the one that usually fails, and the one that drives the design.

Read article →
Glossary7 min read

Internal noise guideline values in BS 8233

The BS 8233 internal ambient noise values are easy to quote and easy to misapply. The open window assumption underneath them is where most assessments are challenged.

Read article →
Glossary7 min read

Critical duration storm and attenuation volume

Attenuation storage is sized from the storm duration that needs the most volume, not from a single design event. How the critical duration is found and what a drainage strategy has to show.

Read article →
Glossary8 min read

Percolation test for a foul drainage field

The Vp value from a percolation test sets the drainage field area. A result below 15 or above 100 seconds per millimetre rules a field out whatever the layout.

Read article →
Glossary8 min read

Blockage scenario in a surface water drainage design

A blockage scenario asks where the water goes when the flow control silts up. It is a sensitivity test, not a design event, and it usually costs a weir level rather than a bigger basin.

Read article →
Glossary8 min read

Flood hazard rating and the depth velocity product

Flood hazard rating combines depth, velocity and a debris factor into one number with four bands. The debris factor step is what pushes a shallow urban route into the danger for most band.

Read article →
Glossary7 min read

Pepper-potting and cluster limits in affordable housing

Pepper-potting disperses affordable homes across a scheme so tenure is not legible from the street. Cluster limits are the compromise that keeps a registered provider at the table.

Read article →
Glossary6 min read

Nomination agreement with a registered provider

A nomination agreement decides who moves into affordable rented homes. It is a housing document, not a planning one, and it often sits on the critical path.

Read article →
Glossary7 min read

Curtilage of a listed building and how it is determined

Curtilage is a question of fact, not a line on a map. Here are the three factors the courts apply, the 1948 test for ancillary structures, and how to get certainty.

Read article →
Glossary7 min read

Searching the Historic Environment Record

An HER search is the archaeological baseline for most applications. Here is how to request one, what the records mean, and what the search cannot tell you.

Read article →
Glossary7 min read

Scheduled monument consent and who decides it

Works to a scheduled monument need consent from the Secretary of State, not the council. Here is what counts as works, where class consents help, and what the pack contains.

Read article →
Glossary7 min read

The Wheatcroft principle on amended plans

Amended plans can be accepted mid-determination only if the change would not deprive consultees of the chance to comment. Here is how that test is applied, and what to do when it is borderline.

Read article →
Glossary6 min read

Veteran tree features and the planning consequences

Veteran status comes from decay and habitat features rather than age. It makes a tree irreplaceable habitat, with a 15 times stem diameter buffer and a very narrow policy test.

Read article →
Glossary6 min read

Fallback position in planning and the real prospect test

A fallback position argues that refusing the application leads to something else lawful being built instead. The test is a real prospect of implementation, and the weight depends on the evidence.

Read article →
Glossary6 min read

Benchmark land value in a viability appraisal

Benchmark land value is the figure a viability appraisal is tested against. It starts from existing use value plus a reasoned premium, and the price paid for the site is not the starting point.

Read article →
Glossary7 min read

Irreplaceable habitat: what it means in planning

Irreplaceable habitat is a defined list, not a judgement. A scheme affecting it cannot be fixed by buying biodiversity units; it either avoids the habitat or fails.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope