Heritage and Archaeology articles – page 6

210 articles
Heritage and Archaeology7 min read

Chance archaeological finds and the Treasure Act

An unexpected find during groundworks triggers a reporting duty under the Treasure Act 1996 and, usually, a planning condition. Here is the sequence that keeps the delay short.

Read article →
Heritage and Archaeology7 min read

Deliberate neglect and the heritage balance explained

Policy tells decision makers to disregard the deteriorated state of a heritage asset where neglect caused it. Here is what that means for condition and viability arguments, and how to evidence a real case of decay.

Read article →
Heritage and Archaeology7 min read

When Historic England must be consulted on an application

Grade I and II consent applications go to Historic England as of right. Grade II applications only go where demolition is involved. Here is how the triggers work and what they do to the programme.

Read article →
Heritage and Archaeology7 min read

Class consents for works to a scheduled monument

Some works to a scheduled monument are already consented by the Ancient Monuments (Class Consents) Order 1994. The agricultural class is the one that matters on a farm, and it is narrower than most owners assume.

Read article →
Heritage and Archaeology8 min read

Listed building consent orders and local orders

Consent orders grant listed building consent for described works without an application. Here is the difference between national and local orders, what they typically cover, and how to check one applies.

Read article →
Heritage and Archaeology7 min read

Heritage partnership agreements and what they simplify

A heritage partnership agreement can pre-authorise recurring repairs to listed buildings across an estate. Here is what it can and cannot grant, the significance work it rests on, and why so few exist.

Read article →
Heritage and Archaeology7 min read

Registered battlefields and development in their area

A registered battlefield has no separate consent regime and the highest level of policy protection. The evidence sits in the plough soil, not in standing remains.

Read article →
Heritage and Archaeology7 min read

Grade I and II applications and national consultation

Works to a Grade I or II building bring a statutory consultee and, if the council disagrees with it, a referral to the Secretary of State. Plan the submission around that.

Read article →
Heritage and Archaeology7 min read

Shopfronts on listed buildings and advertisement consent

Signage on a listed shop is two applications, not one. Getting the fascia, lettering and illumination right before you apply saves a refusal and an enforcement letter.

Read article →
Heritage and Archaeology7 min read

Using historic maps in a heritage or archaeology assessment

A half-day of historic map research feeds the heritage statement, the archaeology assessment and the contamination desk study. Here is the method and its limits.

Read article →
Heritage and Archaeology7 min read

Heritage statements for a solar array on farmland

A farmland solar array harms setting rather than fabric, and reversibility only reduces the weight of that harm. How to assess and present it properly.

Read article →
Heritage and Archaeology7 min read

Salvaged materials and the honesty of repair

Conservation repair asks two questions of any material choice: does it protect significance, and can a future reader still tell what is original. Matching is not automatically the answer.

Read article →
Heritage and Archaeology7 min read

Article 4 directions: finding what was actually removed

Knowing a direction exists is not enough. The schedule lists the classes withdrawn, the map defines the land, and the confirmation date decides when it bit.

Read article →
Heritage and Archaeology7 min read

Demolition in a conservation area and relevant demolition

Conservation area consent went in 2013 and demolition control moved into planning permission. This covers relevant demolition, the offence and its defence, partial demolition, and the evidence a case needs.

Read article →
Heritage and Archaeology7 min read

Archaeology conditions: watching brief or evaluation

Choosing between pre-determination trenching and a watching brief is a risk decision. This compares the archaeological stages, what each delivers and how to negotiate the condition wording.

Read article →
Heritage and Archaeology8 min read

Dendrochronology and paint analysis: when councils ask

Scientific fabric analysis is requested when a date is disputed and the answer changes the decision. Taking the sample can itself need listed building consent.

Read article →
Heritage and Archaeology8 min read

Human remains on site: the licence and the procedure

Removing buried human remains needs a Ministry of Justice licence, or a faculty in consecrated ground. Before either, the coroner has to release the find.

Read article →
Heritage and Archaeology8 min read

Substantial harm and the exceptional justification test

Substantial harm is a threshold, not a sliding scale. Crossing it swaps the public benefits balance for a cumulative test on reasonable uses, marketing, funding and ownership.

Read article →
Heritage and Archaeology6 min read

Recording a building before demolition or conversion

The condition bites before any works start. How the recording levels differ, what a usable record contains, and the sequence that keeps it off the critical path.

Read article →
Heritage and Archaeology6 min read

Post-excavation assessment, archive and publication

The fieldwork invoice is roughly the halfway point. How post-excavation assessment, analysis, publication and archive deposition work, and why the condition stays live for years.

Read article →
Heritage and Archaeology7 min read

Sections 66 and 72 and what they require of decisions

Neither duty prohibits anything. They put a thumb on the scale, and the courts have been specific about how heavy that thumb is.

Read article →
Heritage and Archaeology7 min read

Heritage at risk: grants, repairs notices and urgent works

A heritage at risk entry carries no legal effect, but the powers behind it do. Urgent works, repairs notices and minimum compensation all sit in the 1990 Act.

Read article →
Heritage and Archaeology8 min read

Internal alterations that harm significance

Nothing has to be visible from the street for listed building consent to be needed. Plan form, hidden fabric, and the limits of the reversibility argument.

Read article →
Heritage and Archaeology7 min read

Historic shopfronts, signage and advertisement consent

Three regimes can apply to one shopfront job. How planning permission, listed building consent and advertisement consent fit together, and what each application needs.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope