Heritage and Archaeology articles – page 7

210 articles
Heritage and Archaeology7 min read

Trial trench evaluation: sampling levels and layout

Trial trenching tests what the desk-based assessment predicted. Here is how sampling levels are justified, how layouts are designed and what each result means for the scheme.

Read article →
Heritage and Archaeology7 min read

Pre-1948 curtilage structures and the listing date rule

Section 1(5) of the 1990 Act treats structures within the curtilage of a listed building as part of it, provided they were there before 1 July 1948. Here is how to test whether yours is caught.

Read article →
Heritage and Archaeology6 min read

World Heritage Sites and their buffer zones in planning

There is no World Heritage Act. Protection arrives through ordinary planning decisions, judged against the Statement of Outstanding Universal Value.

Read article →
Heritage and Archaeology6 min read

Repairs notices and urgent works on neglected buildings

Neglect of a listed building is not an offence, but two powers in the 1990 Act let a council step in: urgent holding repairs, and a repairs notice leading to compulsory purchase.

Read article →
Heritage and Archaeology7 min read

Unauthorised works to a listed building

A planning breach ages out. A listed building breach does not. That single difference changes how due diligence has to be done on any listed property purchase.

Read article →
Heritage and Archaeology7 min read

Lime mortar, repointing and why cement is refused

Cement mortar is harder and less permeable than the brick around it, so the wall wears instead of the joint. Here is how to specify a lime repointing job and when it needs listed building consent.

Read article →
Heritage and Archaeology6 min read

Shopfronts in conservation areas: what councils control

A fascia change in a conservation area can need three separate consents. Here is what each one tests, what a shopfront design guide asks for, and the evidence that gets a modern front approved.

Read article →
Heritage and Archaeology6 min read

Archaeological evaluation before or after determination

Evaluating before determination costs money before permission exists. Deferring it to a condition moves the risk to the point where delay costs most. How to choose.

Read article →
Heritage and Archaeology7 min read

Curtilage listing: what the listing actually covers

A list entry describes the house, but the listing can cover the stables, the coach house and the garden wall. How to work out what is protected, and on what evidence.

Read article →
Heritage and Archaeology7 min read

Total loss of a listed building: the policy test

Total loss of a designated heritage asset is substantial harm at its most extreme. The four limbs of the national test, and the evidence that has to sit behind each one.

Read article →
Heritage and Archaeology6 min read

Archaeology and foundation design: preservation in situ

Where archaeology is significant, the mitigation is a substructure design rather than a dig. Here is how foundation choice, levels and monitoring decide whether deposits survive.

Read article →
Heritage and Archaeology6 min read

Boundary walls, railings and gates in conservation areas

Front boundaries carry much of a conservation area's character, so removing one usually needs permission. Here are the height thresholds, the consents and the evidence that wins the case.

Read article →
Heritage and Archaeology6 min read

Lime mortar, repointing and listed building consent

Repointing changes a fifth of the visible surface of a wall, so councils treat it as a consent matter. Here is how to specify lime mortar that a conservation officer will approve.

Read article →
Heritage and Archaeology8 min read

Thatch, fire safety and listed building consent

Re-coating in the same material and detail is repair. Changing material, ridge type or the roof build-up is alteration, and fire barriers need consent even though their purpose is protective.

Read article →
Heritage and Archaeology7 min read

Industrial heritage: converting mills and warehouses

A scheme that keeps the elevations and strips out the cast iron columns can cause more harm than one that alters the facade. Structure and process evidence carry the significance.

Read article →
Heritage and Archaeology7 min read

Converting historic farm buildings sensitively

The significance of a farmstead usually lies in the plan form and the relationship between ranges, not in one barn. That changes how openings, yards and subdivision are judged.

Read article →
Heritage and Archaeology6 min read

Burial grounds and human remains in development

Planning permission does not authorise disturbing burials. The licensing regimes, notice periods, archaeological requirements and consultation that apply instead.

Read article →
Heritage and Archaeology6 min read

Archaeological archives and deposition charges

The archive stage runs long after the excavation ends. Ownership, museum acceptance, deposition charges and condition discharge, set out for a development budget.

Read article →
Heritage and Archaeology6 min read

Advertisement consent in a conservation area

Conservation area status cuts back the deemed consent classes that let shops sign up without applying. Here is what needs consent, what to submit and how illumination is judged.

Read article →
Heritage and Archaeology7 min read

Amending or challenging a list entry

List entries can be corrected, amended or, rarely, removed. What evidence each route needs, why the description does not limit what is protected, and the risks of asking.

Read article →
Heritage and Archaeology7 min read

Building preservation notices and spot listing

A building preservation notice treats an unlisted building as listed for six months while the Secretary of State decides. How the power works and how listing requests are made.

Read article →
Heritage and Archaeology6 min read

Urgent works and repairs notices explained

Section 54 urgent works stop a neglected listed building getting worse. A section 48 repairs notice opens the way to compulsory purchase. How both work and what an owner can do.

Read article →
Heritage and Archaeology7 min read

Certificates of lawfulness of proposed works

Unauthorised works to a listed building are a strict liability offence. A certificate of lawfulness of proposed works converts an officer's opinion into a binding confirmation that consent is not required.

Read article →
Heritage and Archaeology7 min read

Grade I and Grade II listings: what changes

Grade does not alter the scope of listing. It alters the consultation the council must carry out, the policy test applied to harm and the standard of evidence and competence expected from the design team.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope