Heritage and Archaeology articles – page 8

210 articles
Heritage and Archaeology7 min read

Reporting archaeological discoveries during works

England has no general duty to stop work for archaeology. The obligations come from your planning condition, the Treasure Act and burial law, and each has a different trigger and a different timescale.

Read article →
Heritage and Archaeology6 min read

Shopfronts in conservation areas: what officers assess

Shopfront applications turn on whether the historic frame survives, where the fascia sits, how the sign is lit and what happens at night. Advertisement consent runs separately.

Read article →
Heritage and Archaeology7 min read

Heritage at risk and optimum viable use

For a building at risk, the optimum viable use is the one causing least harm to significance. Here is how to rank uses, evidence marketing and calculate a conservation deficit.

Read article →
Heritage and Archaeology6 min read

Choosing a historic building recording level

Recording levels run from a basic photographic record to a full analytical account. Here is how to match the level to what is being lost and agree it before work starts.

Read article →
Heritage and Archaeology7 min read

Written schemes of investigation: what gets approved

A written scheme of investigation is approved by the council's archaeological advisor, not the case officer. What the document needs to contain, from sampling strategy to archive deposition, and the mistakes that cost weeks.

Read article →
Heritage and Archaeology7 min read

Designing an archaeological field evaluation

An evaluation before determination turns an open-ended archaeological liability into a measured one. Choosing techniques, setting sampling levels, and what positive and negative results mean for the layout.

Read article →
Heritage and Archaeology6 min read

What an archaeological desk-based assessment must cover

A desk-based assessment establishes what is known, what is likely and what survives. Here is the content a county archaeologist expects, and why truncation analysis often decides the outcome.

Read article →
Heritage and Archaeology6 min read

Registered parks and gardens in the planning process

There is no such thing as registered park consent. Protection comes through planning policy and a distinct set of consultees, and the assessment turns on designed views rather than on individual buildings.

Read article →
Heritage and Archaeology6 min read

Listed building consent: what needs it and what does not

Consent is needed for works affecting the character of a listed building as one of special interest. Size and visibility are irrelevant, and there is no internal exemption.

Read article →
Heritage and Archaeology6 min read

Applying the setting assessment steps in practice

Most setting assessments skip the step that matters: saying what the surroundings contribute to significance before the proposal is introduced. Here is how to work through all five.

Read article →
Heritage and Archaeology6 min read

The ecclesiastical exemption and church building works

Listed places of worship in five English denominations are exempt from listed building consent and use their own internal systems instead. Planning permission, scheduled monument consent and churchyard archaeology are untouched by that exemption.

Read article →
Heritage and Archaeology6 min read

Heritage partnership agreements and consent orders

Agreements and consent orders can remove repeat listed building consent applications. The statutory basis, the schedule that carries them, and when the effort pays.

Read article →
Heritage and Archaeology6 min read

Demolishing a boundary wall at a listed building

A garden wall at a listed house is usually protected by the curtilage rule. What needs listed building consent, what counts as repair, and how to win a vehicle opening.

Read article →
Heritage and Archaeology6 min read

Geophysical survey in archaeology: what it can find

Geophysical survey detects contrast, not archaeology. Which technique suits which ground, what stays invisible, and where the survey sits before trial trenching.

Read article →
Heritage and Archaeology7 min read

Assessing a historic farmstead before a barn conversion

Conservation officers read a farmstead as a working whole. Plan form, the hierarchy of buildings, the fabric inside the threshing barn and the yard surfaces all shape what a conversion can do.

Read article →
Heritage and Archaeology6 min read

Treasure finds on a development site: what happens next

Treasure reporting is a statutory duty with a criminal offence attached, and it falls on the finder. What the definition covers, who to ring, and how to settle reward shares before work starts.

Read article →
Heritage and Archaeology6 min read

Human remains on a development site: the licence

Removing buried human remains needs a separate licence from the Ministry of Justice, or a faculty on consecrated ground. Former burial grounds carry a further statutory notice period before building.

Read article →
Heritage and Archaeology6 min read

Scheduled monument consent: applying under the 1979 Act

A scheduled monument on your land brings a consent regime that runs entirely outside the planning system, with strict liability offences and no application fee.

Read article →
Heritage and Archaeology6 min read

Non-designated heritage assets and the balanced judgement

A locally listed building carries no statutory protection, and that surprises people on both sides of the counter. What it does carry is a balanced judgement, which is a different argument entirely.

Read article →
Heritage and Archaeology7 min read

Strip, map and sample: when councils ask for it

Trial trenching rarely ends the archaeological story. Where features are dispersed or their character is unclear, county archaeologists ask for strip, map and sample, and the groundworks programme has to absorb it.

Read article →
Heritage and Archaeology6 min read

Ecclesiastical exemption and listed building consent

Ecclesiastical exemption removes listed building consent for works to churches of five denominations in England. It does not remove the need for planning permission.

Read article →
Heritage and Archaeology6 min read

World Heritage Site buffer zones and visual impact

A World Heritage Site is not a statutory designation in England and a buffer zone is not a control boundary. The assessment turns on attributes of Outstanding Universal Value and agreed views.

Read article →
Heritage and Archaeology6 min read

Archaeology and biodiversity net gain on the same site

Trial trenching strips the habitat that the biodiversity metric is about to measure. Survey order, habitat placement over deposits and parallel pre-start conditions decide whether both regimes can be satisfied.

Read article →
Heritage and Archaeology6 min read

Like-for-like repairs to a listed building: consent or not

Repairs to a listed building need consent if they would affect its character as a building of special interest. Mortar, roof coverings, joinery and render are where like-for-like usually fails.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope