Heritage and Archaeology articles – page 9

210 articles
Heritage and Archaeology7 min read

Solar panels on a listed building: consent and reversibility

Visibility, loss of fabric and reversibility are the three questions a conservation officer asks. Here is where panels tend to be accepted and what the application should contain.

Read article →
Heritage and Archaeology7 min read

Registered parks and gardens: the consultation trigger

There is no registered park consent. What registration brings is designated heritage asset status and a statutory consultation that catches development in the setting as well as the site.

Read article →
Heritage and Archaeology6 min read

Listed building enforcement and the criminal offence

Section 9 of the 1990 Act makes unconsented works to a listed building an offence regardless of intent, and listed building enforcement notices are not time limited.

Read article →
Heritage and Archaeology7 min read

Shopfronts in conservation areas: consent and evidence

Permitted development does not cover shop front alterations, and conservation area duties raise the bar. Here is the consent trio, the recurring refusal reasons and the evidence pack that gets a decision.

Read article →
Heritage and Archaeology6 min read

Demolition in a conservation area: when permission is needed

Conservation area consent was replaced in 2013 by a requirement for planning permission for relevant demolition. Here is what that covers, what is excluded and what the application needs.

Read article →
Heritage and Archaeology7 min read

Structuring a statement of heritage significance

A heritage statement fails when it assesses impact before it has established significance. Here is the order the assessment should follow and what each section has to prove.

Read article →
Heritage and Archaeology6 min read

Searching a Historic Environment Record before you apply

The Historic Environment Record holds the local archaeological and heritage data that national lists do not. Here is how to request a search and what to do with the results.

Read article →
Heritage and Archaeology7 min read

Watching briefs and archaeological conditions on small sites

A watching brief means an archaeologist attends your groundworks. It is the proportionate answer on most small sites, and the programme risk is manageable if you plan for it.

Read article →
Heritage and Archaeology7 min read

Replacement windows in a listed building

Windows carry a large share of a listed building's interest, so consent starts from repair. Secondary glazing is the usual answer, and slim double glazing succeeds only on the right building.

Read article →
Heritage and Archaeology8 min read

Enabling development for a heritage asset: the tests

Enabling development is a narrow exception, not a viability argument with a heritage label. It turns on an evidenced conservation deficit, a minimum quantum and an obligation that actually delivers the repairs.

Read article →
Heritage and Archaeology6 min read

Using a conservation area appraisal in your application

The appraisal is the council's own account of what makes your area special. Designing against it answers most of the objection before the application is submitted.

Read article →
Heritage and Archaeology6 min read

Historic building recording levels 1 to 4 explained

Recording levels run from a basic photographic record at Level 1 to a full analytical record with documentary research at Level 4. The level drives fee, programme and content.

Read article →
Heritage and Archaeology7 min read

Archaeological trial trenching: what evaluation proves

Trial trenching converts an unknown archaeological liability into a costed mitigation scheme. The sample, the layout and the timing all need agreeing before the machine arrives.

Read article →
Heritage and Archaeology7 min read

Written scheme of investigation: what it must contain

The WSI turns an archaeological condition into a programme with a method and an end point. What it must contain, who approves it and why archive deposition is the hard part.

Read article →
Heritage and Archaeology7 min read

Less than substantial harm and the public benefits balance

Less than substantial harm covers everything short of the very serious end, so treating it as a synonym for minor is the commonest error. How to run the balance so it survives challenge.

Read article →
Heritage and Archaeology7 min read

Setting of a heritage asset: the staged assessment

Setting is not the view of the asset. It is the surroundings in which it is experienced, and the assessment has to work through significance before it reaches effect.

Read article →
Heritage and Archaeology6 min read

Curtilage listing: which structures are covered

A stable block nobody thinks is listed can be listed. The 1948 date and a three part test decide it, and getting the answer wrong is a criminal matter.

Read article →
Heritage and Archaeology6 min read

Listed building consent for internal alterations

Listing covers the inside of the building as much as the outside. Here is where the section 7 threshold falls, and the evidence that gets an internal scheme approved.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope