Householder Extensions and Conversions articles – page 5

251 articles
Householder Extensions and Conversions7 min read

Removing a chimney stack in a conservation area

Chimney stacks are usually named as positive features in conservation area appraisals. How to check whether permission is needed, and why keeping the stack while losing the breast often works.

Read article →
Householder Extensions and Conversions8 min read

Raising the ridge height on a bungalow

Class B stops any part of a house rising above its existing ridge, so a bungalow roof lift always needs permission. What decides it: the street roofline, the eaves line and the windows.

Read article →
Householder Extensions and Conversions7 min read

Annexes and the single planning unit question

An annexe needs permission when it creates a separate dwelling. The planning unit factors officers weigh, why Class E rarely covers a garden annexe, and the conditions to expect.

Read article →
Householder Extensions and Conversions8 min read

Rear dormers on a semi detached house: the rules

A rear dormer on a semi detached house usually falls under Class B permitted development, but only if it stays below the ridge, keeps 0.2 metres back from the eaves and adds no more than 50 cubic metres.

Read article →
Householder Extensions and Conversions7 min read

Obscure glazing conditions on side facing windows

Obscure glass alone does not satisfy the condition. The window also has to be fixed shut below 1.7 metres, and an open casement overlooks just as well as a clear one.

Read article →
Householder Extensions and Conversions7 min read

Side extension setback and the subordination test

The Order limits a side extension to half the width of the original house and one storey. The setback from the front wall is a design convention, and it is usually what decides the application.

Read article →
Householder Extensions and Conversions7 min read

Matching roof pitch and eaves on a rear extension

Roof pitch only has to match under permitted development where the rear extension has more than one storey. Eaves height is the limit that catches most schemes, and the arithmetic is worth doing before anything is drawn.

Read article →
Householder Extensions and Conversions7 min read

Front extensions and why they are harder than rear ones

Extending forward of the principal elevation almost always needs permission, and the decision turns on the street scene rather than neighbour amenity. Here is how officers apply the building line test.

Read article →
Householder Extensions and Conversions7 min read

Green roofs and rainwater on a householder extension

A green roof rarely needs permission in its own right, and the build-up depth can take an extension outside Class A by adding height. Measure to the top of the growing medium, not the deck.

Read article →
Householder Extensions and Conversions7 min read

Air source heat pumps and the conditions attached

An air source heat pump is usually permitted development under Class G of Part 14, and the MCS Planning Standards noise limit of 42 dB(A) at a neighbour's window is what decides where the unit can go.

Read article →
Householder Extensions and Conversions7 min read

Extending a flat above a shop

Part 1 of the GPDO grants householder rights to dwellinghouses, and a flat is not one, so extending a flat above a shop is always a full application. Ownership, escape routes and noise from the use below decide whether it is feasible.

Read article →
Householder Extensions and Conversions7 min read

Juliet balconies, terraces and overlooking on an extension

Class A excludes any enlargement that includes a balcony, verandah or raised platform above 0.3 metres, so terraces always need permission. A flush Juliet arrangement with no platform can be different.

Read article →
Householder Extensions and Conversions7 min read

Rendering or cladding a house: when permission is needed

Re-rendering or cladding the walls of a house normally sits inside Class A permitted development, unless the property is in a conservation area or another designated area, is a flat, or is covered by an article 4 direction.

Read article →
Householder Extensions and Conversions6 min read

Removing a chimney stack from a terraced house

On a terrace the stack is usually shared, structural and part of the street rhythm. What the council controls, what the Party Wall Act requires and what a buyer will ask for.

Read article →
Householder Extensions and Conversions7 min read

Loft conversions where the roof pitch is too shallow

A loft with 2.2 metres to the ridge is marginal and below 2 metres will not work without altering the roof or the ceilings below. What the arithmetic is and which options remain.

Read article →
Householder Extensions and Conversions7 min read

Raising the ridge of a bungalow for a first floor

Class B stops at the existing ridge, so a ridge raise needs prior approval or a full application. What decides it, which roof form reads best, and why foundations matter early.

Read article →
Householder Extensions and Conversions7 min read

Garden rooms and the incidental enjoyment test

Class E permits garden buildings for purposes incidental to the enjoyment of a house. Which uses fall outside that, what the height and coverage limits are, and what a certificate proves.

Read article →
Householder Extensions and Conversions7 min read

Garage conversions and the parking a council expects

Converting an integral garage rarely fails on the building work. It fails on parking standards, a condition requiring the garage to be retained, or headroom once the floor is built up.

Read article →
Householder Extensions and Conversions7 min read

Front roof slope rooflights: the 0.15 metre rule

Class C allows roof windows in a front slope facing the road, but only if they project no more than 0.15 metres beyond the original roof plane. Article 4 directions and listed building consent change the answer.

Read article →
Householder Extensions and Conversions6 min read

Matching brickwork and mortar on a rear extension

Joints make up nearly a fifth of a brick wall, so the mortar decides the match. How to read the existing brick, get the coursing right and evidence it for a later sale.

Read article →
Householder Extensions and Conversions7 min read

Loft conversion escape windows and what makes a room habitable

The escape window is the easy part. In a two storey house, a loft conversion normally needs a protected stair, and the headroom over that stair is what decides whether the roof stays within permitted development.

Read article →
Householder Extensions and Conversions7 min read

Designing an extension next to a neighbour's extension

An existing neighbour extension lowers the harm to them and raises the cumulative effect on the street. How officers weigh the pair, and how to draw it.

Read article →
Householder Extensions and Conversions7 min read

Extending a barn conversion where rights were removed

Find the permission that created the dwelling and read every condition before assuming Class A is available. Curtilage, countryside policy and design that succeeds.

Read article →
Householder Extensions and Conversions7 min read

Building over a public sewer during a rear extension

A build over agreement is a Building Regulations matter, not planning. How to find the pipe, what the undertaker will ask for and why manholes indoors are trouble.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope