Householder Extensions and Conversions articles – page 8

251 articles
Householder Extensions and Conversions7 min read

Annexe or separate dwelling: the ancillary occupation test

An annexe is ancillary only if it is used as part of the same household as the main house. These are the physical and functional indicators case officers weigh, and the conditions that follow.

Read article →
Householder Extensions and Conversions7 min read

Dormer proportion and set-backs that get approved

The cubic allowance tells you what you can build without permission. Proportion, set-backs and width decide whether a dormer is approved when an application is needed.

Read article →
Householder Extensions and Conversions7 min read

Wraparound extensions and the permitted development trap

A wraparound is one enlarged part extending beyond two walls, so the side extension limits apply to the whole of it. The half-width condition is what removes the right.

Read article →
Householder Extensions and Conversions8 min read

Two storey rear extensions and the neighbour amenity tests

Permitted development limits rarely decide a two storey rear extension. Separation distance, overbearing effect and loss of outlook do, and each one is argued differently.

Read article →
Householder Extensions and Conversions7 min read

Subservience in side extension design and why it matters

Side extensions are refused on subservience more than on anything else. The ridge set down, the front set back, roof form and where the principle is relaxed.

Read article →
Householder Extensions and Conversions7 min read

Side return infill on a Victorian terrace

Side return infills are often permitted development, and the eaves height limit near the boundary decides the roof form. Daylight, party walls and build over agreements do the rest.

Read article →
Householder Extensions and Conversions7 min read

Basements under a terraced house: policy and practice

Excavating within the footprint of a terraced house is often not development at all. The lightwells, steps and garden extensions are what bring the application, along with ground and party wall issues.

Read article →
Householder Extensions and Conversions7 min read

Obscure glazing conditions and the levels that apply

Obscure glazing conditions are the standard council answer to an overlooking objection. The obscuration levels, the 1.7 metre opening rule and what happens when the glass is replaced.

Read article →
Householder Extensions and Conversions7 min read

Juliet balconies, balconies and the overlooking test

Class A of the GPDO excludes balconies, verandas and raised platforms, so a balcony on a house needs permission. A Juliet balcony with no floor to stand on is treated differently.

Read article →
Householder Extensions and Conversions6 min read

Garage conversions and the loss of a parking space

Converting a garage is usually permitted development. The council's parking standard, any Article 4 direction and the bedroom count decide whether that holds, and what evidence answers a highways objection.

Read article →
Householder Extensions and Conversions6 min read

Materials of similar appearance in permitted development

The materials condition in Class A asks for similar appearance, not a perfect match. Where that line falls decides whether a rendered or clad extension is permitted development or a planning application.

Read article →
Householder Extensions and Conversions7 min read

Hip to gable conversions and the roof volume budget

Class B gives a house 40 or 50 cubic metres of extra roof space. A hip to gable takes a share of that before the rear dormer is drawn, and the arithmetic decides whether the conversion is permitted development or a planning application.

Read article →
Householder Extensions and Conversions6 min read

Side extension width and the half the original house rule

The half-width rule compares your extension with the house as first built, not as it stands. Here is how to establish the baseline, the height limits and what to submit.

Read article →
Householder Extensions and Conversions6 min read

Rear extensions on a corner plot and the side boundary

A side wall that faces a road is treated like a front. That single rule removes several householder permitted development rights on corner plots and catches owners out repeatedly.

Read article →
Householder Extensions and Conversions6 min read

Removing a front boundary wall to widen your access

Demolishing a front boundary wall is usually permitted, until the house is in a conservation area or the wall belongs to a listed building. The dropped kerb is a separate consent again.

Read article →
Householder Extensions and Conversions6 min read

Integral garage conversion: the parking question councils ask

Most integral garage conversions are permitted development. The objection, when it comes, is almost always about the parking space you have just removed and what replaces it.

Read article →
Householder Extensions and Conversions6 min read

Driveway gates, visibility splays and the highway

The one metre height limit, the five metre setback and the visibility splay decide most driveway gate schemes. Two separate consents are usually involved.

Read article →
Householder Extensions and Conversions6 min read

Fitting a shower room into a loft conversion: the rules

A shower room inside a loft rarely needs planning permission. The soil vent pipe, the extract terminal and the new window are what the council can control.

Read article →
Householder Extensions and Conversions6 min read

Adding a first floor to a chalet bungalow within the roof

A chalet bungalow already has rooms in the roof, which changes the permitted development sums. Volume allowances, ridge height and dormer design decide whether you apply.

Read article →
Householder Extensions and Conversions7 min read

Matching materials: what similar appearance really allows

Permitted development asks for materials of similar appearance, not an identical match. Format and texture matter more than colour, and mortar matters more than either.

Read article →
Householder Extensions and Conversions6 min read

Extending a house with an outbuilding already in the garden

Extensions and garden buildings draw on the same permitted development allowance. Here is how to work out how much of it an existing garage has already used.

Read article →
Householder Extensions and Conversions7 min read

Dropped kerbs, hardstanding and surface water in one job

The paving and the dropped kerb are decided by different people under different laws. Here is the order to do them in, and what the 5 square metre run-off rule actually says.

Read article →
Householder Extensions and Conversions8 min read

Replacing a flat roof with a pitched roof

Putting a pitched roof over a flat one raises the roof, which makes it an enlargement rather than a repair. Which GPDO class applies decides the limits, and height is what fails most proposals.

Read article →
Householder Extensions and Conversions8 min read

Garden rooms with a shower and a bed: where the line is

A gym with a shower is incidental. A studio with a bed, a kitchen and a tenant is a separate dwelling. Class E of the GPDO turns on the word incidental, and that is where garden room projects fail.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope