Permitted Development articles – page 2

279 articles
Permitted Development7 min read

Means of access under Part 2 Class B of the GPDO

A dropped kerb onto an unclassified road can be permitted development under Part 2 Class B, but only in support of other permitted work, and never onto a classified road.

Read article →
Permitted Development7 min read

Part 11 demolition: what the prior approval decides

The determination is narrow: method and restoration, nothing else. What belongs in the method statement, why conservation areas are outside it, and the 28 day silence rule.

Read article →
Permitted Development7 min read

New flats above commercial premises under Part 20

The upward extension right is real but narrow. Age limits, three separate height controls and a long list of prior approval matters decide most sites before design starts.

Read article →
Permitted Development8 min read

Part 6 agricultural permitted development on a large holding

On a holding of five hectares or more, Class A of Part 6 permits substantial agricultural buildings without a planning application. The ground area and height limits, the 400 metre livestock rule, and what reasonably necessary actually means.

Read article →
Permitted Development7 min read

Porches under Class D and the two metre highway distance

Class D has three absolute limits and no prior approval route. How to measure the ground area externally, where the 2 metre highway line falls, and when a full application is the better option.

Read article →
Permitted Development6 min read

Class B roof extensions and the 20 centimetre rule

Class B permits roof enlargement within a cubic content allowance, below the existing ridge, and set back 20 centimetres from the original eaves. Where each limit bites, and where the class does not reach.

Read article →
Permitted Development7 min read

Why Part 1 rights do not apply to a flat or maisonette

Article 2 of the GPDO excludes flats and maisonettes from the definition of dwellinghouse, removing every Part 1 right. What still applies, and why the application is not a householder one.

Read article →
Permitted Development7 min read

Permitted development rights after a Class Q conversion

A barn converted under Class Q is a dwelling without householder permitted development rights. Extensions, sheds and hard surfacing all need permission, so plan the whole site at prior approval stage.

Read article →
Permitted Development7 min read

Reverting to a previous use after a permitted change

Part 3 grants a right to change use. It does not generally grant a right to change back. Ask the question before you implement the change, not after the tenant leaves.

Read article →
Permitted Development8 min read

Curtilage of a listed building and the rights you lose

If your house is listed, the garden wall and the old coach house may be listed too. The 1948 test decides it, and unauthorised works are a criminal offence with no immunity period.

Read article →
Permitted Development7 min read

Part 16 telecoms apparatus and the prior approval route

Under Part 16 the permission comes from the Order, so the council can only consider siting and appearance. Objections about health or need cannot be acted on, however many arrive.

Read article →
Permitted Development7 min read

Class H antennas: size, number and siting limits

Class H of Part 1 allows up to two antennas on a house within stated size limits. Flats have no right at all, designated land restricts highway-facing positions, and listed buildings need consent.

Read article →
Permitted Development7 min read

Measuring height where the ground slopes

The datum is the highest part of the ground immediately next to the building, so the downhill corner is what breaches the limit. How to measure it and record it.

Read article →
Permitted Development7 min read

Permitted development does not excuse a wildlife offence

Converting a loft under permitted development is lawful development and can still be a criminal offence if bats are roosting. What to check before work starts, and what to do on discovery.

Read article →
Permitted Development7 min read

Article 2(3) land: which designations remove rights

Five designations make a site article 2(3) land under the GPDO. Side extensions and rear dormers go, single storey rear extensions and rooflights stay.

Read article →
Permitted Development7 min read

Obscure glazing and the 1.7 metre opening restriction

The 1.7 metre line is measured from the floor inside, not the ground outside. Get it wrong and the whole extension drops out of permitted development.

Read article →
Permitted Development6 min read

The seven metre rule for two-storey rear extensions

Class A removes permitted development for a two-storey rear extension within 7 metres of the opposite rear boundary. How the measurement works, plus the depth, pitch and window conditions.

Read article →
Permitted Development7 min read

Raised platforms, decking and the 300mm trigger

Part 1 of the GPDO excludes raised platforms over 300mm from Class A and Class E, so a deck 310mm above adjacent ground needs permission. How the measurement works and how to design around it.

Read article →
Permitted Development7 min read

Class A rear extension depth on a detached house

Class A allows a 4 metre single-storey rear extension on a detached house, measured from the original rear wall, and up to 8 metres through the prior approval route.

Read article →
Permitted Development6 min read

Scaffolding, hoardings and the highway licence

Planning permission does not let you stand a scaffold on the footway. Highway licences under the Highways Act 1980 run on a separate track, with their own applicants, timescales and lead times.

Read article →
Permitted Development7 min read

Loft conversions with no external change to the house

Internal alterations are outside the planning system altogether. The question is what happens the moment you cut an opening in the roof.

Read article →
Permitted Development7 min read

Air conditioning condensers on commercial buildings

The permitted development right for plant applies to industrial and warehouse premises. On a high street unit, assume an application and a BS 4142 assessment.

Read article →
Permitted Development7 min read

CCTV and security cameras: the permitted development limits

Most security cameras on a commercial building need no planning permission, provided they stay inside the Class F size limit. The floodlight beside them is a different matter.

Read article →
Permitted Development7 min read

Replacement windows and doors: when they are development

A like-for-like window swap is not development, so no permission is needed. Change the material, opening pattern or frame depth and the position shifts, with flats and listed buildings handled differently again.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope