Permitted Development articles – page 3

279 articles
Permitted Development7 min read

Ground mounted solar arrays in a domestic garden

A garden solar frame can be permitted development, but only one per curtilage, capped at 9 square metres of panel and kept 5 metres from the boundary. Where the limits bite and what to do when your array exceeds them.

Read article →
Permitted Development8 min read

Upper floor side windows and the obscure glazing condition

The permitted development right for extensions, dormers and side rooflights carries its own glazing condition. Here is exactly which windows it catches, how 1.7 metres is measured, and what happens if clear glass goes in later.

Read article →
Permitted Development7 min read

Garage conversions and the parking condition that follows

Converting an integral garage is usually outside the definition of development, and the door infill is normally permitted development. The real obstacle is a parking retention condition on the original estate permission.

Read article →
Permitted Development7 min read

Dropped kerbs on a classified road and why PD fails

C roads are classified and nothing about them says so. Why permitted development fails, what the planning application must show, and the section 184 crossing nobody mentions.

Read article →
Permitted Development7 min read

Flood defence and watercourse works without permission

The Part 13 classes attach to the body carrying out the work, not to the watercourse. What a developer actually needs, and the order to obtain it in.

Read article →
Permitted Development8 min read

Change of use to a state funded school under Part 3

Part 3 lets specified buildings become a state-funded school subject to prior approval of four matters only. The scope, the 56 day period and the works it does not cover.

Read article →
Permitted Development6 min read

Side extensions: the width and single storey limits

Half the width of the original house, single storey, 4 metres high. The three Class A limits that decide whether a side extension is permitted development, and what to do when they do not fit.

Read article →
Permitted Development6 min read

Enforcement and permitted development: who proves what

The council does not have to prove your extension needed permission. On the no-breach ground of appeal, you have to prove it did not, limb by limb.

Read article →
Permitted Development6 min read

The similar appearance condition and matching brick

The condition says similar, not identical, and compares against your own house rather than the street. Breach it and the whole extension stops being permitted development.

Read article →
Permitted Development6 min read

Equestrian use is not agriculture: what that changes

Grazing is agriculture. Keeping horses is not, which removes Part 6 permitted development rights and makes stables, arenas and access full planning applications.

Read article →
Permitted Development7 min read

Cumulative outbuildings and your remaining allowance

Everything in the garden counts, including extensions and buildings put up by previous owners. How to calculate the remaining allowance and record it properly.

Read article →
Permitted Development7 min read

Battery storage and where permitted development stops

Standalone batteries have no permitted development route and are decided locally whatever their size. Where the narrow rights apply and what an application needs.

Read article →
Permitted Development7 min read

Are polytunnels development? The planning position

A tunnel moved each season may not be development. A fixed commercial run normally is. How the tests apply and what evidence settles the question.

Read article →
Permitted Development7 min read

Agricultural tracks and when prior notification applies

A farm track on a holding of five hectares or more is usually permitted development, but only after a 28 day notification. What the authority can and cannot ask.

Read article →
Permitted Development7 min read

Shopfronts, shutters and awnings: what needs permission

Repainting a fascia is not development. A shutter box above it is. Where the line falls for shopfronts, shutters and awnings, and the consents that run alongside.

Read article →
Permitted Development7 min read

Markets on private land and the 14 day sub-limit

Class B of Part 4 gives 28 days of temporary use a year, of which only 14 may be a market. Set-up days count, and street trading consent is a separate regime.

Read article →
Permitted Development7 min read

Temporary site huts and compounds during construction

The temporary buildings right is narrower than contractors assume. It is parasitic on lawful operations, limited to the site and adjoining land, and conditional on reinstatement.

Read article →
Permitted Development7 min read

Shipping containers and storage pods in a garden

A container left in a garden for years is treated as a building, which brings it inside the Class E limits. Height near a boundary is usually what takes it outside them.

Read article →
Permitted Development8 min read

What counts as the principal elevation of a house

The principal elevation governs forward extensions, roof alterations, outbuilding positions and equipment on designated land. The indicators used to identify it, and corner plots.

Read article →
Permitted Development8 min read

Measuring eaves height on a sloping site

Permitted development heights come from the highest part of the ground next to the building, which usually helps on a slope. The three metre eaves limit near a boundary is what bites.

Read article →
Permitted Development8 min read

Prior approval timescales and the deemed consent trap

The 56 day deemed consent provision only helps if the authority received a valid application. Securing and evidencing validity matters more than counting the days.

Read article →
Permitted Development7 min read

Class ZA: demolition and rebuild of a single dwellinghouse

Class ZA of Part 20 permits demolition and rebuild of a single detached dwelling or block of flats, with hard tests on construction date, vacancy, footprint and height.

Read article →
Permitted Development8 min read

Class Q barn conversions and the structural capability test

The single question that decides most Class Q prior approvals is whether the barn is capable of conversion without substantial rebuilding. A structural report that answers it properly is worth more than any design argument.

Read article →
Permitted Development7 min read

New vehicle accesses and why the dropped kerb is separate

A new driveway needs two separate permissions from two separate parts of the council. Getting them in the wrong order is how people end up with a drive they cannot legally drive onto.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope