Professionals and Qualifications articles – page 12

372 articles
Professionals and Qualifications7 min read

Independence and conflicts of interest in planning evidence

Expert evidence is the author's own opinion and the duty runs to the decision maker, not the client. The conflicts that recur, and how to declare them in time.

Read article →
Professionals and Qualifications6 min read

Reviewing a specialist report you did not commission

Technical reports usually fail on scope, dates or the wrong scheme rather than on the science. How to review one without holding the technical qualification.

Read article →
Professionals and Qualifications6 min read

Writing a brief that gets a usable specialist report

Consultants answer the question they are asked. How to write a brief that names the decision, the standard, the survey season and the deliverable format.

Read article →
Professionals and Qualifications6 min read

Energy assessor accreditation for planning stage work

Nothing in planning requires an accredited energy assessor, but building control does. The gap between those positions is where schemes lose time and carbon percentages stop being achievable.

Read article →
Professionals and Qualifications6 min read

Checking an archaeological contractor before you appoint

The county archaeologist approves the written scheme of investigation, so who you appoint affects how fast that approval comes. Here is what to check before instructing anyone.

Read article →
Professionals and Qualifications6 min read

Who is competent to carry out a BS 4142 assessment

BS 4142 leans on the assessor's judgement at three points. Here is the competence, instrumentation and measurement record councils expect to see.

Read article →
Professionals and Qualifications6 min read

Arboriculturist qualifications for a BS 5837 survey

BS 5837 asks for an arboriculturist without naming a qualification. Here is what councils actually look for, and how to check the survey you have paid for.

Read article →
Professionals and Qualifications6 min read

Novating a consultant appointment to the contractor

Novation hands your consultant to the contractor. Here is how to protect condition discharge, keep rights over planning evidence and close the usual drafting gaps.

Read article →
Professionals and Qualifications7 min read

Wind microclimate assessment: who runs the model

Wind assessments for tall buildings are written by specialist wind engineers. Here is how tunnel testing compares with computational modelling, and what a reviewing officer checks first.

Read article →
Professionals and Qualifications6 min read

Who can prepare an overheating assessment to TM59

TM59 overheating assessments are judged on their assumptions, not their conclusions. What the methodology demands of a modeller, the inputs that decide pass or fail, and how the planning and Building Regulations routes differ.

Read article →
Professionals and Qualifications7 min read

Accredited laboratories for soil and water analysis

Contamination reports are rejected on the provenance of their numbers more often than on their conclusions. What accreditation covers, how to scope the analytical suite, and what to check on a certificate of analysis.

Read article →
Professionals and Qualifications6 min read

Specifying a topographical survey for a planning application

Most resurveys are caused by three omissions: an arbitrary datum, too small an extent, and missing invert levels. Here is how to write the brief once and get a survey that serves the whole application.

Read article →
Professionals and Qualifications6 min read

Odour assessment competence and olfactometry explained

Odour assessment uses a human panel, not an instrument. Here is how sampling and olfactometry work, what dispersion modelling adds, and how to judge whether the person writing your report is competent to do it.

Read article →
Professionals and Qualifications6 min read

Party wall surveyors and planning: different roles

Planning permission decides whether development is acceptable. The Party Wall etc. Act 1996 decides whether you may build against or excavate near a neighbour structure. Neither replaces the other.

Read article →
Professionals and Qualifications6 min read

Conflicts of interest for planning consultants

A conflict is manageable if you spot it, disclose it in writing and obtain informed consent before working. Some conflicts cannot be consented away at all.

Read article →
Professionals and Qualifications8 min read

Statutory declarations for a lawful development certificate

A section 191 application is won on evidence, and the statutory declaration is its spine. Who may administer one, the detail that makes it useful, and the documents that should sit behind it.

Read article →
Professionals and Qualifications8 min read

Signing off a draft: the reviewer's declaration

A signature on a report you did not write carries the same weight as one on a report you did. How to classify inputs, limit scope honestly, and know when further survey must come before sign-off.

Read article →
Professionals and Qualifications6 min read

What a professional review of a draft report covers

Signing a review transfers the reader's reliance from the drafter to you. What a review instruction should cover, how to record it, and when to decline.

Read article →
Professionals and Qualifications7 min read

Checking professional indemnity cover before instructing

Professional indemnity cover is the ceiling on what you can recover from a consultant. How to read the certificate, why run-off matters, and what reliance letters actually give you.

Read article →
Professionals and Qualifications7 min read

Great crested newt eDNA: laboratory and licence rules

An eDNA result only counts if it was sampled between 15 April and 30 June by the approved method and analysed by a laboratory working to the protocol Natural England accepts.

Read article →
Professionals and Qualifications6 min read

Agricultural Land Classification and who can survey it

The line between grade 3a and grade 3b is the line between best and most versatile land and ordinary farmland. A published provisional map is not good enough to settle it.

Read article →
Professionals and Qualifications6 min read

Lighting competence and ILP GN01 in planning applications

Lighting objections are usually won or lost on two things: the environmental zone the site sits in, and whether the isolux plot actually shows the boundary.

Read article →
Professionals and Qualifications6 min read

IAQM competence for air quality and construction dust

Air quality assessments are judged on method and on the person who applied it. Knowing what the guidance expects of an assessor tells you whether the report you have paid for will survive consultation.

Read article →
Professionals and Qualifications6 min read

Independent viability review and RICS standards

An independent viability review is a challenge, not a second opinion. This covers the objectivity duty, the order a reviewer tests inputs in, publication expectations and review mechanisms.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope