Professionals and Qualifications – Page 13
Who is competent to prepare or sign off each report, and how to brief and check them.
Professionals and Qualifications articles – page 13
372 articlesThe geotechnical adviser role under Eurocode 7
BS EN 1997 requires geotechnical data to be interpreted by suitably qualified people and recorded in a design report. This sets out the adviser role, the categories, and what a reviewer should check.
When a structural survey needs a chartered engineer
A buyer's building survey is not an engineering appraisal. Here is what planning needs from a structural report, who can sign it and how to read the recommendations.
Who can run a BRE 209 daylight assessment
Daylight reports are only as good as the model behind them. Here is what the guide requires, which inputs change the answer, and how to challenge an assessment.
Heritage competence and conservation accreditation
Heritage statements have no protected authorship, yet councils reject those written by people who cannot assess significance. Here is where the competence line falls.
Who can author a Fire Statement at Gateway One
Article 9A sets the trigger, the form sets the agenda, and the Building Safety Regulator reads the result. What competence looks like, and where late statements fail.
Arboricultural competence under BS 5837:2012
The standard names no qualification, only the arboriculturist. What councils actually look for, the three separate deliverables, and the checks that catch a weak survey.
Who signs the statutory biodiversity metric
No qualification is named for completing the statutory biodiversity metric. The authority judges competence from the outputs, so the habitat survey and condition assessment have to show it.
Bat survey licences and what each level allows
A bat surveyor's licence sets the limit of what they may lawfully do on site. Here is what each tier permits, how class licences work, and the checks to make before you instruct.
Declaring conflicts of interest in planning reports
A conflict is judged by what a reasonable reader would think, not by whether you would be swayed. Six sentences at the front of the report remove an entire category of cross-examination.
When a council can reject a report because of its author
Author competence is sometimes a validation point, sometimes a legal requirement and sometimes only a question of weight. Telling them apart decides whether you argue or recommission.
Reading a consultant fee proposal: scope and exclusions
The price is the least useful part of a fee proposal. Read the scope, exclusions and assumptions first, and three quotes that looked similar will stop looking similar.
Peer review and sign-off: what a reviewer takes on
Reviewing a draft and signing it are different acts with different exposure. How to write a scope statement, price the liability rather than the hours, and know when to decline.
Bat licence classes and what each one allows
A bat survey licence and a European protected species mitigation licence do different jobs at different points in a project. The tiers, the class licence route, and what a reviewer should check.
IAQM membership grades and air quality report authorship
No statutory licence governs who writes an air quality assessment. Here is what IAQM grades signal, the verification and dust competence to test at appointment, and how environmental health officers read the result.
Structural engineer competence for conversion and basement work
For a loft conversion, chartered status is usually enough. For a basement, the council appoints its own auditor and checks the method line by line.
Qualifications councils accept for daylight and sunlight work
Anyone may write a daylight and sunlight report. Here is how councils test competence in the absence of a register, and what to ask before appointing.
What a BREEAM licensed assessor can and cannot do
Only a licensed assessor can submit a BREEAM assessment for certification, and only BRE issues the certificate. Here is what that means for a planning condition.
Archaeological competence: CIfA registration explained
Registration audits the organisation. Accreditation grades the individual. Treat them as one thing and you get a quote from a registered firm and a site team nobody has checked.
Transport planner competence and the trip rate database
Competence and data access are different things. A consultant without a trip rate database subscription cannot derive the rates a highway authority expects to see.
Suitably qualified persons for land contamination reports
No protected title, no licence, no statutory register. What councils actually test is whether the author has done this before on a site like yours, and the conceptual site model is where that shows.
Competent experts and the EIA Regulations 2017
The competent expert requirement is express in the 2017 Regulations, and so is the duty to evidence it. Most challenges come from the coordinator role rather than the topic chapters.
Who can carry out a BS 4142 noise assessment
BS 4142 expects a competent assessor and leaves competence undefined. Here is what environmental health officers actually look for, and the questions to ask before instructing.
Who can sign a BS 5837 tree survey
The standard asks for an arboriculturist, defined by education, training and experience. Here is what the qualifications and registration schemes actually test.
What MCIEEM means and how to verify an ecologist
CIEEM grades are easy to claim and rarely checked. Here is what each one signals, how to verify it in one email, and the questions membership does not answer.