Professionals and Qualifications articles – page 14

372 articles
Professionals and Qualifications6 min read

Checking an ecologist's licence before you appoint them

Protected species licences are personal, species-specific and time-limited. Ten minutes of checking protects the one thing that cannot be fixed later.

Read article →
Professionals and Qualifications7 min read

Signing off an AI-assisted draft: what you take on

Putting your name to a report you did not write transfers the liability to you. Here is how to scope the review, what to check first, and what to record.

Read article →
Professionals and Qualifications6 min read

Conflicts of interest when consultants advise both sides

The professional codes turn on identifying a conflict early and disclosing it. The harder judgement is when informed consent cures the problem and when nothing does.

Read article →
Professionals and Qualifications6 min read

Commissioning a peer review of a specialist planning report

A peer review is not a proofread. It tests whether the method was followed, whether the data supports the conclusion, and whether the report would survive cross examination.

Read article →
Professionals and Qualifications6 min read

Air quality assessment authors and IAQM competence

No statute reserves air quality assessment to a licensed profession. Councils judge the author on method, membership and whether the dispersion model was verified against real monitoring.

Read article →
Professionals and Qualifications7 min read

Who can prepare an LVIA and what CMLI actually means

There is no statutory licence to write a landscape and visual impact assessment. Competence is judged on GLVIA3 method, membership grade and the quality of the visual evidence.

Read article →
Professionals and Qualifications6 min read

Who should prepare a daylight and sunlight assessment

Anyone can write a daylight report. What separates a defensible assessment from a weak one is the model, the baseline and whether the author will stand behind it at inquiry.

Read article →
Professionals and Qualifications6 min read

Protected species licence classes and what each permits

A survey licence permits looking, a mitigation licence permits doing. Individual, class and organisational licences, the three statutory tests, and the six checks a reviewer should run.

Read article →
Professionals and Qualifications6 min read

How to check a planning consultant's registration and record

Anyone can call themselves a planning consultant. How to check RTPI, RICS and Architects Registration Board entries, read their record on your council's register, and set the scope in writing.

Read article →
Professionals and Qualifications7 min read

Writing a survey brief that makes fees comparable

Survey quotes differ mostly on scope, not margin. A one page brief naming BS 5837, CIEEM guidance or BS 4142, the deliverable format and the exclusions list makes the numbers line up.

Read article →
Professionals and Qualifications6 min read

What chartered status means when appointing a planning agent

Anyone can call themselves a planning consultant. What chartered membership actually requires, when it is worth paying for, and the six questions to ask first.

Read article →
Professionals and Qualifications6 min read

Registered arboricultural consultants and BS 5837 competence

Councils want a tree report written to BS 5837 by someone accountable for it. How to tell a contractor from a consultant, and what to check before instructing.

Read article →
Professionals and Qualifications6 min read

Transport planner credentials a highway authority accepts

No statutory qualification governs who writes a transport assessment. What highway officers actually look for in the author, the method and the agreed scope.

Read article →
Professionals and Qualifications6 min read

Suitably qualified contaminated land report authors

There is no statutory register of contaminated land assessors, so councils look for recognised markers. What competence means under BS 10175 and LCRM, and how to check it before you commission.

Read article →
Professionals and Qualifications6 min read

When a council can require a named professional

Some reports legally need a licensed or competent author. Others carry only a local preference dressed up as a requirement. Where the line sits, and how to argue it.

Read article →
Professionals and Qualifications6 min read

Independence and conflicts of interest in viability review

Viability turns on judgements that cannot be re-run, which is why the reviewer's independence matters more here than in any other planning discipline.

Read article →
Professionals and Qualifications6 min read

Daylight consultants: what competence looks like

Neighbour testing and climate-based internal daylight modelling are two disciplines, not one. What competence looks like, and the assumptions that decide the result.

Read article →
Professionals and Qualifications6 min read

Air quality assessment authors and IAQM expectations

Planning law names no qualification for an air quality author, so councils judge the method instead. What to ask about modelling, verification and dust assessment.

Read article →
Professionals and Qualifications6 min read

Lighting assessment competence and the ILP guidance notes

Lighting design is not a protected title, so the quality of an obtrusive light assessment varies widely. The environmental zone and the photometric data are where reviewers should start.

Read article →
Professionals and Qualifications6 min read

Who can prepare a heritage statement and when more is needed

A heritage statement has to describe significance and assess the effect of the proposal on it. For modest works an informed owner can do that. For others the council will expect a specialist.

Read article →
Professionals and Qualifications6 min read

What a professional sign-off commits the signatory to

A reviewer who signs a planning report is taken to stand behind its conclusions. The declaration is where scope, reliance and limitations get fixed, or left dangerously vague.

Read article →
Professionals and Qualifications6 min read

Checking a technical report before it is submitted

Most defects in a technical report are found in twenty minutes by someone who reads the conclusion before the summary. Here is the order to read in and what to send back.

Read article →
Professionals and Qualifications7 min read

Writing a scope of works that gets the report you need

A scope of works that names the deliverable, the standard, the revision rounds and the exclusions makes fee proposals comparable. Here is how to write one and how to normalise the quotations that come back.

Read article →
Professionals and Qualifications6 min read

Who can produce a whole life carbon assessment

Whole life carbon assessment has no licensing regime, so the report itself has to demonstrate competence. Here is what the RICS methodology requires, why the quantities matter most, and how to review an assessment for scope gaps.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope