Professionals and Qualifications articles – page 15

372 articles
Professionals and Qualifications6 min read

CIEEM membership grades explained for ecology reports

Councils asking for a suitably qualified ecologist usually mean Full CIEEM membership. Here is what each grade covers, where Chartered Ecologist status fits, and why the survey licence matters more than the post-nominals.

Read article →
Professionals and Qualifications6 min read

Licensed BREEAM assessors and what the licence covers

A BREEAM rating comes from an assessment by a licensed assessor and a certificate issued by BRE. Here is what the licence covers, what a pre-assessment can honestly claim, and why the appointment date decides which credits are still available.

Read article →
Professionals and Qualifications6 min read

Structural engineer or building surveyor for a conversion

A building surveyor reports on condition and repair. A structural engineer proves the building can take the loads. Which you need for a conversion, and in what order.

Read article →
Professionals and Qualifications6 min read

What a chartered town planner does that an agent may not

Anyone can call themselves a planning consultant. What chartered membership requires, where an unregulated agent is entirely adequate, and how to size the appointment to the risk.

Read article →
Professionals and Qualifications6 min read

Transport planner competence for a transport assessment

No qualification is reserved for transport assessment work, so highway authorities judge competence by method. What to ask an author, and the patterns that get an assessment rejected.

Read article →
Professionals and Qualifications6 min read

Who can sign off a contaminated land report

There is no licence to write a contaminated land report, so competence is judged on qualifications and experience matched to the site. What councils check and how to test a draft.

Read article →
Professionals and Qualifications6 min read

Choosing an archaeologist and working with the county officer

Archaeology rarely stops a scheme. It delays schemes that treat it as a condition to be discharged later rather than a programme item to be booked early.

Read article →
Professionals and Qualifications6 min read

Arboriculturist credentials and what they actually mean

Hiring a tree surgeon to write your planning tree report is a common and expensive mistake. The qualifications tell you which job someone is trained to do.

Read article →
Professionals and Qualifications6 min read

Who can write a Fire Statement for Planning Gateway One

The fire statement is a planning document with an engineering author. Getting the appointment right, and early, is what keeps the Building Safety Regulator's response constructive.

Read article →
Professionals and Qualifications6 min read

What competent person means for biodiversity net gain

The statutory biodiversity metric expects a competent person, but no licence or register defines one. Here is what councils look for and how to brief an assessor properly.

Read article →
Professionals and Qualifications6 min read

Who can carry out a bat survey and hold the licence

Bats are European protected species, so most survey work needs a licensed ecologist. The two licence types, how to check credentials, and why the calendar rules.

Read article →
Professionals and Qualifications6 min read

Party wall surveyor or planning consultant: who does what

Planning is public law decided by the council. The Party Wall etc. Act 1996 is a private code between owners. Neither authorises the other, and confusing them costs time.

Read article →
Professionals and Qualifications6 min read

Who is competent to carry out an ALC survey

No licence covers agricultural land classification, so competence is judged on method and track record. What to ask a soil scientist before appointing them.

Read article →
Professionals and Qualifications6 min read

Expert witness duties at a planning inquiry

The duty runs to the inquiry, not the client. What that means for your proof of evidence, what you concede under cross-examination, and where costs awards come from.

Read article →
Professionals and Qualifications6 min read

What a professional certifies when signing off a draft report

A signature says the work is within your competence and the conclusions follow from the evidence. Defining the scope of review is what makes that statement safe to make.

Read article →
Professionals and Qualifications6 min read

Peer review of a specialist report: when it earns its cost

Peer review pays where a report will be attacked, where the method is unusual, or where you inherited the work. Elsewhere it is comfort, which is a decision to make consciously.

Read article →
Professionals and Qualifications6 min read

Checking professional indemnity insurance before appointing

Professional indemnity cover is claims-made, so today's certificate says little about the policy that will respond in eight years. Here is what to ask for and record.

Read article →
Professionals and Qualifications6 min read

Briefing a specialist so the report is usable first time

Most unusable specialist reports are briefing failures. Here is what to put in the brief, which review points to build in, and how to normalise fee proposals before comparing them.

Read article →
Professionals and Qualifications6 min read

Air quality consultant competence and what IAQM signals

Air quality assessments have no statutory competent person. IAQM membership signals assessed experience, but model verification against local monitoring is what separates a defensible report from a weak one.

Read article →
Professionals and Qualifications6 min read

Lighting competence for an obtrusive light report

Obtrusive light assessments have no statutory competent person. Assigning the right ILP environmental zone matters more than any other judgement in the report.

Read article →
Professionals and Qualifications6 min read

BREEAM assessor licensing and what a pre-assessment needs

A BREEAM pre-assessment is an indicative estimate, not a certificate. Only BRE certifies a rating, on the basis of an assessment by a licensed assessor registered to a specific scheme version.

Read article →
Professionals and Qualifications6 min read

Who signs off a whole life carbon assessment

Whole life carbon assessments have no statutory competent person. Credibility comes from following the RICS methodology, showing where the data came from and reporting module D separately.

Read article →
Professionals and Qualifications6 min read

Structural engineer competence for a structural survey

A structural survey for planning answers whether the building can take what you propose. That is a narrower question than a purchase survey, and a different appointment.

Read article →
Professionals and Qualifications6 min read

Architect, technologist or designer: who does what

Registration protects the title, not the activity. Anyone may design a building and submit an application, so what matters is competence, scope and insurance.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope