Professionals and Qualifications articles – page 8

372 articles
Professionals and Qualifications6 min read

Checking a consultant's appeal track record

Decision letters record what an inspector made of each party's evidence. How to search them, which phrases matter, and what an appeal record cannot tell you.

Read article →
Professionals and Qualifications6 min read

Play space assessments and who prepares them

Councils ask for one document and it takes three sets of hands. How child yield is calculated, who designs the space, and which standards govern equipment and inspection.

Read article →
Professionals and Qualifications6 min read

Who can sign a construction management plan

No statutory scheme names who writes a construction management plan. Why the timing of the condition makes that awkward, and how to draft commitments a contractor can actually live with.

Read article →
Professionals and Qualifications6 min read

Drainage engineer competence for a drainage strategy

There is no statutory competent person scheme for drainage design. What the lead local flood authority reviews, and the questions to ask an engineer before appointing them.

Read article →
Professionals and Qualifications6 min read

ICNIRP declarations for telecoms masts and who signs them

The radio frequency declaration that accompanies a telecoms prior approval application comes from the operator's radio planning team. What it covers, what it does not, and the four checks to run before submission.

Read article →
Professionals and Qualifications7 min read

Verified views and photomontage specialist competence

A rendered image that cannot be reproduced from survey data is an illustration. How to specify verified views so they survive an inquiry.

Read article →
Professionals and Qualifications7 min read

The role of an ecological clerk of works

Supervising ecological mitigation on site only works when the condition, the construction management plan and the building contract line up. What to specify.

Read article →
Professionals and Qualifications7 min read

Historic building recording levels and recorder competence

A Level 3 condition is a specification, not a formality. What separates the four Historic England recording levels, and the competence each one assumes.

Read article →
Professionals and Qualifications7 min read

Who prepares an equalities impact assessment

Section 149 puts the duty on the decision maker. Your assessment is the evidence that lets an officer record due regard properly, which is what protects the permission.

Read article →
Professionals and Qualifications6 min read

Who provides the public health input to an HIA

No licence governs who writes a health impact assessment, but planning expertise alone shows. Where public health input belongs, and how to scope proportionately.

Read article →
Professionals and Qualifications7 min read

Who prepares a retail impact assessment

A retail impact assessment combines planning judgement, market analysis and centre health check field work. Knowing which of the three your team lacks is the first step in commissioning one.

Read article →
Professionals and Qualifications6 min read

Energy statements: SAP assessor or energy consultant

A SAP assessor produces the Building Regulations compliance calculation. An energy consultant writes the planning document that answers the local plan's carbon policy. Knowing which you need avoids a revision at validation.

Read article →
Professionals and Qualifications7 min read

TM59 overheating modelling and modeller competence

There is no register of overheating modellers, so competence is shown through the work. This covers software validation, weather files, opening assumptions, acoustic coordination and the two compliance routes.

Read article →
Professionals and Qualifications7 min read

Who signs a basement impact assessment

No single professional writes a basement impact assessment. Here is how the hydrogeology, geotechnical and structural strands fit together, who audits them and what the monitoring conditions bind.

Read article →
Professionals and Qualifications8 min read

Who designs a commercial kitchen extract scheme

Three competences sit behind a workable extract scheme. A submission signed only by the kitchen equipment supplier is the usual reason a change of use fails on odour.

Read article →
Professionals and Qualifications7 min read

Geotechnical design competence under Eurocode 7

Eurocode 7 names no qualification. It sets three geotechnical categories and makes the experience needed a function of which one your work falls into.

Read article →
Professionals and Qualifications7 min read

Independence and conflicts in appeal evidence

A proof of evidence has to contain the opinion you hold, not the one your client prefers. What to declare and what to do when your view changes mid-inquiry.

Read article →
Professionals and Qualifications7 min read

Reading a CV against a validation requirement

Competence in the abstract is not the test. The test is the wording on the local list, and matching a CV against it takes ten minutes.

Read article →
Professionals and Qualifications7 min read

When a council asks for a chartered structural engineer

Councils ask for chartered structural input when the planning judgement depends on whether a building can be kept, converted or excavated beside safely.

Read article →
Professionals and Qualifications7 min read

Meeting the RICS professional statement on viability

The RICS professional statement on financial viability makes objectivity a mandatory requirement, not an aspiration. Assessments that read as advocacy get rejected before the numbers are tested.

Read article →
Professionals and Qualifications7 min read

Choosing a daylight consultant where no licence exists

Anyone can call themselves a daylight consultant. With no licence to check, a client has to test experience, modelling capability and appeal record instead.

Read article →
Professionals and Qualifications7 min read

Who can prepare a Transport Assessment

Nothing in law says who may write a Transport Assessment. Highway authorities decide whether to believe it, and their confidence rests on institute membership, data access and modelling capability.

Read article →
Professionals and Qualifications6 min read

Verifying a protected species mitigation licence

Ask for the licence reference, the named ecologist, the species and methods, the site boundary and the expiry date. If any of the five is missing, do not start.

Read article →
Professionals and Qualifications6 min read

Briefing an ecologist before the survey season

Most ecology survey windows are short and several close by the end of June. Commission the appraisal between October and February and the whole season is yours.

Read article →

Not sure which documents your council will ask for?

Enter your postcode and PlanScope recommends the right reports for your project, then drafts them in minutes.

Enter your postcode on PlanScope